M9sol Logbooks Solenoid Daily log
  Solenoid logbook, Page 7 of 15  ELOG logo
Entry  Tue Nov 23 15:10:06 2004, Doug Preddy, Quench Recovery, switched to parallel cold return mode 
 
Entry  Wed Nov 24 14:58:42 2004, Doug Preddy, Quench Recovery, today 
Came in this morning to find the helium return line to the buffer tank 
frosted up. MV51 has been stuck open the whole time. That exlains the 
cooldown rate and other problem. Cycled MV51 a few times and it now seems 
Entry  Thu Nov 25 07:21:37 2004, Doug Preddy, Quench Recovery, started power lead flow 
Curtis switched to series mode last night at 7:00.
Startedflow to power leads at 7:00 this morning.
Entry  Mon Nov 29 09:28:16 2004, Doug Preddy, Normal Running, Buffer tank empty 
Came down to check on system. CV211 was fully open, trying to charge the 
system. Ripples on LHe in and PL neg. CV141 fully closed. I closed CV147 to 
0.45 to try and move CV141 open. Checked the buffer tank pressure, it was 
Entry  Wed Dec 1 12:55:56 2004, Doug Preddy, Normal Running, added one bottle helium gas 
buffer tank pressure is up to 6.5 psi.
Entry  Thu Dec 2 10:51:16 2004, Doug Preddy, Normal Running, power lead ripple 
Ripples got worse overnight.LHe in 10.3-11.7, PL Neg 8.0-8.7. Flows <200mm.
cycled CV142. Flows 240mm. LHe in 10.3-11.3  PL Neg 7.9-8.1
Entry  Sun Dec 5 11:15:24 2004, Doug Preddy, Normal Running, more ripples 
I loked at the power lead temps this morning. LHe_in 10.4-12.0  PL-Neg 8.0-
9.0  PL-Pos 9.8-10.4. Flows down to 160mm. Called Ops and got Danica to 
cycle CV142. Ripples and flow improved on the second try.
Entry  Fri Mar 11 09:18:30 2005, Doug Preddy, Maintenance, services on system 
The cold box was isolated and pumped out after it warmed up. It has been 
refilled with helium.
Turbine 2 speed indicator failed at some time during the last run. After 
Entry  Mon Apr 18 09:52:11 2005, Doug Preddy, Maintenance, Relays replaced 
The following relays have been replaced in the Sulzer control panel:
K341, K379, K132, K324A, K314, K125, K127, K133, K252, K227, K233, K238, 
K239, K245, K246.
Entry  Thu May 19 15:05:31 2005, Doug Preddy, Maintenance, STA 120 replaced M9 Turbine 2.doc
The turbine 2 speed indicator control box STA 120 has been replaced with a 
newer style Jaquet controller. This is similar to the ones used in the 
ISAC helium liquifier. See attached photos for set up parameters. These 
Entry  Wed Jun 1 08:23:19 2005, Doug Preddy, Start Up, start up notes 
The solenoid was pumped out Monday and yesterday after the quads just 
downstream of the solenoid were put back in place. The quad just 
downstream of the solenoid was remove to replace two coils on it. 
Entry  Wed Jun 1 23:48:02 2005, Doug Preddy, Quench Recovery, the first quench 
I recieved a call from ops at 22:00 tonight that the solenoid had alarmed. 
I came in and found a cold box fault, with the compressor tripped off. I 
was unable to restart the compressor. I cleared the cryostat quench and 
Entry  Thu Jun 2 01:26:30 2005, Doug Preddy, Quench Recovery, started flow to solenoid Capture6-2-05-1.13.33 AM.jpg
See attached file for a screen grab of temps.
Entry  Thu Jun 2 01:38:25 2005, Doug Preddy, Quench Recovery, strip tool plot 02-06-05-12.57.26 AM.jpg
This is a strip tool  plot of the cooldown
Entry  Thu Jun 2 09:16:40 2005, Doug Preddy, Quench Recovery, continuing to cool 02-06-05-7.32.49 AM.jpg
See screen grab
Entry  Thu Jun 9 08:56:10 2005, Doug Preddy, Quench Recovery, system back on 
The compressor was restarted and the solenoid is cooling (sort of) in 
parallel cold return.
Entry  Tue Jun 14 20:53:19 2005, Doug Preddy, Quench Recovery, restarted refrigerator after power bump june142045.BMP
see bitmap for temps/pressures after presurrizing coldbox. Preparing to 
start flow to turbines, then will start flow to solenoid in parallel warm 
return.
Entry  Tue Jun 14 23:01:22 2005, Doug Preddy, Quench Recovery, switched to parallel cold return 
 
Entry  Mon Jul 18 11:18:40 2005, Doug Preddy, Quench Recovery, Solenoid Quenched over the weekend 
The solenoid was found to be warm on Monday morning. M9Q3 had a bad water 
leak over the weekend. The water header serving Q3 was turned off and the 
leak confirmed. Q3 was isolated and the header was turned back on. My 
Entry  Mon Jul 18 15:51:17 2005, Doug Preddy, Quench Recovery, Compressor restarted, flow to solenoid 
Recovered the vacuum in the solenoid, then started the compressor.
Started flow to solenoid in parallel warm return.