M9sol Logbooks Solenoid Daily log
  Solenoid logbook, Page 5 of 15  ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Authordown Operational Mode Subject Text Attachments
  21   Tue May 4 11:20:57 2004 Doug PreddyNormal Runningpower leads going unstablepower lead ripples increased over last couple
of days. They are quickly 
dieing out now and the temps are startint
  
  22   Tue May 4 11:26:38 2004 Doug PreddyNormal Runningpower leads Power cycled HIC 142 with solenoid power at
400 amps. Flows > 240mm and 
temps have dropped.
 may4_1053.BMP 
  23   Wed May 5 07:55:37 2004 Doug PreddyQuench RecoverySolenoid quenched on power lead tempSolenoid quenched on power lead temp. I ran
down and managed to recover it 
with minimal temp rise in the solenoid. Coil
 may5_745.BMP 
  24   Wed May 5 09:59:10 2004 Doug PreddyQuench Recoverystarted flow to power leadsStarted flow to power leads.
TIC121 into auto mode
  
  25   Wed May 5 12:13:51 2004 Doug PreddyNormal Runningpower leads coldshould be ready to run.   
  28   Fri May 21 09:27:39 2004 Doug PreddyMaintenanceIdle modePower supply was ramped down yesterday as
there are no users.
The Sundance server was rebooted yesterday.
  
  32   Tue Jul 27 23:33:27 2004 Doug PreddyQuench RecoverySolenoid quench 9:30I was phoned at about 9:30 tonight with a
solenoid alarm. After looking at 
the display I found the system to be tripped
  
  33   Wed Jul 28 00:04:30 2004 Doug PreddyQuench Recoverystarted flow to solenoidSolenoid temps were: C1 & C12 about 30K. C6
&C7 about 11K. Started flow to 
solenoid in parallel cold return. Jumpered
  
  34   Wed Jul 28 07:00:18 2004 Doug PreddyQuench Recoveryswitch to series modeSwitching to series mode. Jumper on vacuum
gauge removed.
  
  35   Wed Jul 28 21:26:19 2004 Doug PreddyQuench RecoveryDouble Power bumpTwo power bumps tonight. Everything tripped
of. Restarted cooling water 
pump, diff. pump under solenoid etc. Computer
  
  36   Wed Jul 28 22:01:31 2004 Doug PreddyQuench RecoveryStarting flow to solenoidc1 28, c12 29, c6 11.6, c7 12.5 TI121 22.5   
  37   Wed Jul 28 23:07:01 2004 Doug PreddyQuench Recoverysolenoid coolingcooling rates for the solenoid are good. In
parallel cold return.
  
  38   Thu Jul 29 09:01:11 2004 Doug PreddyQuench Recoveryswitched to parallel coldChanged to series mode.   
  39   Thu Jul 29 13:25:29 2004 Doug PreddyQuench Recoverystart flow to power leads    
  42   Thu Aug 19 10:28:32 2004 Doug PreddyStart Upafter M9bv5 FIXOver the last couple of days we replaced the
gate on the M9BV5 valve. The 
old one had worn the teflon sliders on the
  
  43   Tue Aug 24 12:09:50 2004 Doug PreddyNormal RunningThe past few daysThe solenoid has been re-started as of August
19. It was cooled down and 
energized over the weekend. Sunday night
  
  44   Wed Aug 25 07:47:05 2004 Doug PreddyNormal RunningPower lead flowThe power lead flows had dropped to 210 mm
this morning. I increased HIC142 
from 0.8 to 0.83. The flows are back to <250
  
  45   Wed Aug 25 12:52:53 2004 Doug PreddyNormal Runningpower lead rippleLhe ripple has started. 10.9-11.4K PL-Pos
also has a smaller ripple. Both 
flows down to 230mm. Cycled HIC 142 and the
  
  46   Sun Aug 29 14:39:19 2004 Doug PreddyNormal RunningPower lead rippleThe LHe in and PL-neg temps have been building
up a ripple over the last 
few days. Curtis cycled HIC142 Friday evening
  
  48   Fri Sep 3 01:28:43 2004 Doug PreddyQuench Recoverypower upstarted flow to the power leads at 11:30.
Cold and stable at 1:00am. 
Energized solenoid at 1:30.
  
ELOG V2.9.2-2455