M9sol Logbooks Solenoid Daily log
  Solenoid logbook, Page 5 of 15  ELOG logo
Entry  Thu Apr 19 15:18:25 2007, Doug Preddy, Start Up, preparing to start the refrigerator 
Starting the vacuum systems in the coldbox and solenoid.
Entry  Wed Nov 15 17:05:49 2006, Willy Andersson, Quench Recovery, powerleads cold, energizing solenoid 
Powerlead temperatures have bottomed out, energizing solenoid to 300 
amps, ramp rate 60.
Entry  Fri Sep 3 01:28:43 2004, Doug Preddy, Quench Recovery, power up 
started flow to the power leads at 11:30. Cold and stable at 1:00am. 
Energized solenoid at 1:30.
Entry  Tue Nov 15 07:25:10 2005, Doug Preddy, Normal Running, power supply problem 
Saturday November 12 the solenoid power supply ramped itself down to zero. 
It would not ramp up unless the ramp rate was set to 30 minutes. At this 
setting the power supply ramped up to the required current. It seems to 
Entry  Tue Oct 26 09:45:24 2004, Doug Preddy, Normal Running, power leads warming 
Flow to power leads dropped to <80 mm. Cycled HIC142. Temps dropping, flows 
>250.
Entry  Tue May 30 14:36:41 2006, Doug Preddy, Normal Running, power leads warming 
power leads warming. closed HIC 142, then re-opened. temps falling
Entry  Mon Apr 28 09:03:22 2008, Doug Preddy, Normal Running, power leads warmed during weekend 
The power lead temperatures suddenly rose on Sunday morning. No rippling occured before the woarm up. 
I shut flow off this morning for about 10 minutes
(until the LHe in went up to 30K) and then open the flow back up. The temperature seem to be recovering.
Entry  Sat Oct 9 22:50:26 2004, Other, , power leads warmed 
At 10:30 PM Saturday, Donald Arseneau sees power leads at
25K, having gone up for the previous 10 hours.  (I didn't
see it earlier because striptool wasn't scrolling).  Cycled
Entry  Tue May 4 11:20:57 2004, Doug Preddy, Normal Running, power leads going unstable 
power lead ripples increased over last couple of days. They are quickly 
dieing out now and the temps are startint to increase. PL flow is down to 
<180mm. I will power cycle HIC 142.
Entry  Sat Jul 29 09:38:06 2006, Doug Preddy, Quench Recovery, power leads cooled 
opened power lead flow about 40 minutes ago. ~12K will let them stablize. 
LHE level >20%
Entry  Wed May 5 12:13:51 2004, Doug Preddy, Normal Running, power leads cold 
should be ready to run.
Entry  Wed Apr 28 09:30:09 2004, Doug Preddy, Normal Running, power leads again 
Same story as yesterday. Ripples dieing out, flows down to <200 mm, temps 
increasing. Turned HIC 142 down to 0.4 then back up to 0.75. Temps dropped 
quickly. Then turned HIC 142 to 0 and back to 0.75. Temps dropping, flow > 
Entry  Tue May 4 11:26:38 2004, Doug Preddy, Normal Running, power leads  may4_1053.BMP
Power cycled HIC 142 with solenoid power at 400 amps. Flows > 240mm and 
temps have dropped.
Entry  Sun Oct 10 17:36:35 2004, Experimentor, Start Up, power leads 
At 5:30 pm sundat, power lead temp is about 10.6K.  script tool still 
notworking
Entry  Sat Jul 26 01:29:21 2008, Doug Preddy, Quench Recovery, power leads 
ops will monitor liquid level. When it's at 60% they will come down and open the power lead valve. When the temperature ripples die out the solenoid can
be energized.
Entry  Wed May 27 15:01:34 2009, Doug Preddy, Quench Recovery, power leads 
Power leads are cold. There is still a small ripple. The power supply can be ramped up as soon as the ripples die out.
Entry  Mon Jul 3 23:01:34 2006, Doug Preddy, Quench Recovery, power lead warming/ripples caused quench 
power lead warming/ripples caused quench at 18:45 today. Compressor stayed 
on, but flow to solenoid stopped.
I started flow to solenoid at 22:40.
Entry  Tue Nov 27 21:02:08 2007, Doug Preddy, Normal Running, power lead ripples 
power leads were oscillating tonight. John K. came down and cycled CV142. 
(Thanks John!) Temps settling out.
Entry  Wed Aug 25 12:52:53 2004, Doug Preddy, Normal Running, power lead ripple 
Lhe ripple has started. 10.9-11.4K PL-Pos also has a smaller ripple. Both 
flows down to 230mm. Cycled HIC 142 and the ripple disappeared. 
Put TIC121 into auto mode.
Entry  Thu Dec 2 10:51:16 2004, Doug Preddy, Normal Running, power lead ripple 
Ripples got worse overnight.LHe in 10.3-11.7, PL Neg 8.0-8.7. Flows <200mm.
cycled CV142. Flows 240mm. LHe in 10.3-11.3  PL Neg 7.9-8.1
ELOG V2.9.2-2455