Entry  Tue May 4 11:20:57 2004, Doug Preddy, Normal Running, power leads going unstable 
power lead ripples increased over last couple of days. They are quickly 
dieing out now and the temps are startint to increase. PL flow is down to 
<180mm. I will power cycle HIC 142.
Entry  Tue May 4 11:26:38 2004, Doug Preddy, Normal Running, power leads  may4_1053.BMP
Power cycled HIC 142 with solenoid power at 400 amps. Flows > 240mm and 
temps have dropped.
Entry  Wed May 5 07:55:37 2004, Doug Preddy, Quench Recovery, Solenoid quenched on power lead temp may5_745.BMP
Solenoid quenched on power lead temp. I ran down and managed to recover it 
with minimal temp rise in the solenoid. Coil temps are falling, liquid is 
building. No flow to the power leads yet.
Entry  Wed May 5 09:59:10 2004, Doug Preddy, Quench Recovery, started flow to power leads 
Started flow to power leads.
TIC121 into auto mode
Entry  Wed May 5 12:13:51 2004, Doug Preddy, Normal Running, power leads cold 
should be ready to run.
Entry  Fri May 21 09:27:39 2004, Doug Preddy, Maintenance, Idle mode 
Power supply was ramped down yesterday as there are no users.
The Sundance server was rebooted yesterday. This morning the displays were 
all white screened, so I restarted the session. The computer was running 
Entry  Tue Jul 27 23:33:27 2004, Doug Preddy, Quench Recovery, Solenoid quench 9:30 
I was phoned at about 9:30 tonight with a solenoid alarm. After looking at 
the display I found the system to be tripped off. When I came in I found 
the compressor off and the solenoid quenched. There was no real indication 
Entry  Wed Jul 28 00:04:30 2004, Doug Preddy, Quench Recovery, started flow to solenoid 
Solenoid temps were: C1 & C12 about 30K. C6 &C7 about 11K. Started flow to 
solenoid in parallel cold return. Jumpered out the vacuum gauge for the 
solenoid vacuum.
Entry  Wed Jul 28 07:00:18 2004, Doug Preddy, Quench Recovery, switch to series mode 
Switching to series mode. Jumper on vacuum gauge removed.
Entry  Wed Jul 28 21:26:19 2004, Doug Preddy, Quench Recovery, Double Power bump 
Two power bumps tonight. Everything tripped of. Restarted cooling water 
pump, diff. pump under solenoid etc. Computer stayed on! Starting 
compressor.
Entry  Wed Jul 28 22:01:31 2004, Doug Preddy, Quench Recovery, Starting flow to solenoid 
c1 28, c12 29, c6 11.6, c7 12.5 TI121 22.5
Entry  Wed Jul 28 23:07:01 2004, Doug Preddy, Quench Recovery, solenoid cooling 
cooling rates for the solenoid are good. In parallel cold return.
Entry  Thu Jul 29 09:01:11 2004, Doug Preddy, Quench Recovery, switched to parallel cold 
Changed to series mode.
Entry  Thu Jul 29 13:25:29 2004, Doug Preddy, Quench Recovery, start flow to power leads 
 
Entry  Thu Aug 19 10:28:32 2004, Doug Preddy, Start Up, after M9bv5 FIX 
Over the last couple of days we replaced the gate on the M9BV5 valve. The 
old one had worn the teflon sliders on the sides. Metal shavings on bottom 
of body. Found a replacement with metal rollers, rather than slides. 
Entry  Tue Aug 24 12:09:50 2004, Doug Preddy, Normal Running, The past few days 
The solenoid has been re-started as of August 19. It was cooled down and 
energized over the weekend. Sunday night at 9:30 it tripped due to 
negative power lead going above it's set point. The system stopped flow to 
Entry  Wed Aug 25 07:47:05 2004, Doug Preddy, Normal Running, Power lead flow 
The power lead flows had dropped to 210 mm this morning. I increased HIC142 
from 0.8 to 0.83. The flows are back to <250 mm and the temps are back to 
LHe in-10.8, PL-Pos-11.1, PL-Neg-8.9
Entry  Wed Aug 25 12:52:53 2004, Doug Preddy, Normal Running, power lead ripple 
Lhe ripple has started. 10.9-11.4K PL-Pos also has a smaller ripple. Both 
flows down to 230mm. Cycled HIC 142 and the ripple disappeared. 
Put TIC121 into auto mode.
Entry  Sun Aug 29 14:39:19 2004, Doug Preddy, Normal Running, Power lead ripple 
The LHe in and PL-neg temps have been building up a ripple over the last 
few days. Curtis cycled HIC142 Friday evening at about 5:00. I just had 
the Main control room operator (Peter) cycle them again. The ripples died 
Entry  Fri Sep 3 01:28:43 2004, Doug Preddy, Quench Recovery, power up 
started flow to the power leads at 11:30. Cold and stable at 1:00am. 
Energized solenoid at 1:30.