Entry  Wed Jul 4 11:13:12 2007, Doug Preddy, Quench Recovery, test 
This is a test to make sure the e-mail works.
Entry  Sun Jul 1 16:09:37 2007, Doug Preddy, Normal Running, M9B:DP2 tripped off  
Diffusion pump tripped off and vacuum (and power lead temps) going up. I 
had an experimentor cycle HIC 142 at 4:15 this morning. When I got in 
today I restarted the pump and it is back to 6.0 x 10-7. Power lead temps 
Entry  Tue Jun 19 21:15:41 2007, Doug Preddy, Quench Recovery, Today's quench 
power lead temps caused a quench at 8:30 this morning. Recovery of system 
and flow to solenoid was started by 11:00. Solenoid was switched to series 
cold at 3:00. Solenoid and power leads were cold at ~6:30. power supply 
Entry  Sat Jun 16 15:05:03 2007, Doug Preddy, Normal Running, Solenoid power lead temp problem 
Power lead temps rippling and increasing. I asked an operator to cycle 
HIC142. This seems to have fixed the problem (for now).
Entry  Thu Jun 14 00:10:10 2007, Doug Preddy, Quench Recovery, recovering from earlier quench 
Solenoid quenched on power lead temperature last night at about 6:00. I 
restarted flow to the solenoid in parallel cold return. Switched to series 
mode and am building liquid. 
Entry  Tue Jun 12 12:48:25 2007, Doug Preddy, Maintenance, added one bottle UHP helium to system 
 
Entry  Thu May 31 11:51:49 2007, Doug Preddy, Quench Recovery, Switched to series mode 
 
Entry  Thu May 31 07:11:05 2007, Doug Preddy, Quench Recovery, switched to parallel cold return 
switched to parallel cold return earlier this morning. Vacuum is 5 x 10-5.
Entry  Wed May 30 11:27:32 2007, Doug Preddy, Quench Recovery, Problems recovering 
Various start up problems :
MV51 stuck open. Finally got it closed by hitting the valve with a hammer.
Vacuum is bad in cold box as MV902 tripped closed.
Entry  Wed May 30 08:38:38 2007, Doug Preddy, Quench Recovery, Solenoid quenched this morning 
Solenoid quenched this morning on power lead temp (I believe).
I restarted it at ~7:00, but the capacity control for the compressor would 
not respond. I shut the system back down and checked as many relays as I 
Entry  Wed May 16 10:02:35 2007, Doug Preddy, Maintenance, warming up power leads 
Power lead temps have been slowly increasing over the last wekk. I ramped 
the solenoid down and am warming the power leads to >80k.
Entry  Wed May 2 16:28:16 2007, Doug Preddy, Normal Running, Energizing solenoid to 500 amps 
Power supply initially would not ramp up. I exercised the rate control 
selector switch and found that the power supply would ramp up at only the 
30 minute setting. It is ramping up at a rate of about 60 minutes.
Entry  Mon Apr 30 09:30:26 2007, Doug Preddy, Normal Running, problems over weekend 
The PLC Limit switch power supply was tripped off on Saturday. I came in 
and reset it and restarted all the vacuum systems that had tripped off. 
The power leads were found to be warming up. This morning they were at ~ 
Entry  Fri Apr 27 10:32:07 2007, Doug Preddy, Quench Recovery, Reset quench relay logic box 
The quench relay logic controller was not functioning correctly. It showed 
a "Trip" light and no other lights. I cycled the power to the controller 
and it now seems to be working properly. This did cause a quench and I am 
Entry  Fri Apr 27 10:16:44 2007, Kevin Trithardt, Quench Recovery, Test 
Don't Panic -- There was no quench. I am testing the e-log.
I have added Kevin's name and e-mail to the M9 e-log. He will be e-mailed 
when a quench recovery log is submitted. His name is also included in the 
Entry  Fri Apr 27 10:10:07 2007, Doug Preddy, Normal Running, Solenoid Cold 
Solenoid cold, power leads cold. Alarm handler started.
Entry  Tue Apr 24 10:21:49 2007, Doug Preddy, Start Up, Started flow to turbines 
Started flow to turbines at about 10:00 in parallel warm mode.
Entry  Mon Apr 23 16:31:02 2007, Doug Preddy, Start Up, Started compressor 
Startewd compressor and purifer today.
Entry  Fri Apr 20 12:15:12 2007, Doug Preddy, Start Up, remote PLC switch 
I could not control the vacuum devices using EPICS. The buttons could be 
pushed, but nothing would respond. The PLC was in local mode. Thumbwheel 
to 100, push On/Open button to put it into remote mode.
Entry  Thu Apr 19 15:18:25 2007, Doug Preddy, Start Up, preparing to start the refrigerator 
Starting the vacuum systems in the coldbox and solenoid.