M9sol Logbooks Solenoid Daily log
  Solenoid logbook, Page 14 of 15  ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
Entry  Thu Oct 12 19:54:10 2006, Willy Andersson, Quench Recovery, Energized solenoid. 
    Reply  Fri Oct 13 00:13:57 2006, Experimentor, Quench Recovery, Energized solenoid. 
Entry  Wed Jun 14 16:27:01 2006, Willy Andersson, Quench Recovery, Energized solenoid 
Entry  Fri Jun 30 11:13:00 2006, Doug Preddy, Normal Running, E-log is back up and running 
Entry  Tue Jun 13 15:52:46 2006, Willy Andersson, Quench Recovery, Doug has reduced and now closed CV155. 
Entry  Wed Jul 28 21:26:19 2004, Doug Preddy, Quench Recovery, Double Power bump 
Entry  Sun Oct 17 05:03:13 2004, Other, Start Up, Cycle valve after oscillations begin 
Entry  Thu Jul 5 11:01:47 2007, Kevin Trithardt, Other, Current lead warm up 
Entry  Fri Jul 21 07:39:37 2006, Doug Preddy, Quench Recovery, Cool down continues 
Entry  Fri Jun 25 12:36:04 2004, Willy Andersson, Quench Recovery, Compressor unloaded etc. 
Entry  Sat Aug 7 22:37:04 2004, Willy Andersson, Quench Recovery, Compressor tripped off. 
Entry  Tue Jun 13 10:54:27 2006, Doug Preddy, Quench Recovery, Compressor tripped off 
Entry  Wed Nov 15 11:09:28 2006, Doug Preddy, Quench Recovery, Compressor tripped off 
Entry  Thu Oct 12 11:53:04 2006, Willy Andersson, Quench Recovery, Compressor trip, 09:50 this morning. 
Entry  Mon Jul 18 15:51:17 2005, Doug Preddy, Quench Recovery, Compressor restarted, flow to solenoid 
Entry  Mon Aug 6 08:41:31 2007, Doug Preddy, Quench Recovery, Cold box trip at 6:00 
Entry  Fri Apr 16 10:15:26 2004, Doug Preddy, Start Up, Changes to M9sol Vacuum PC 
Entry  Fri May 26 08:45:38 2006, Doug Preddy, Start Up, Changed to series mode 
Entry  Fri Apr 23 09:19:30 2004, Doug Preddy, Normal Running, CV211 
Entry  Fri May 26 07:29:54 2006, Doug Preddy, Start Up, CV155 closed 
ELOG V2.9.2-2455