Thu Oct 12 19:54:10 2006, Willy Andersson, Quench Recovery, Energized solenoid.
|
Switched to series mode about 6 hours ago. Cooling continued including
power leads until LHe level at about 50% and powerleads appeared stable. |
Fri Oct 13 00:13:57 2006, Experimentor, Quench Recovery, Energized solenoid.
|
Hi there,
This is Khashayar (experimenter). Lookin at all different temperatures and
|
Wed Jun 14 16:27:01 2006, Willy Andersson, Quench Recovery, Energized solenoid
|
Powerleads appear stable. |
Fri Jun 30 11:13:00 2006, Doug Preddy, Normal Running, E-log is back up and running
|
I would have made an entry when it died, but----- |
Tue Jun 13 15:52:46 2006, Willy Andersson, Quench Recovery, Doug has reduced and now closed CV155.
|
Now in full // cold return mode.
Had just talked with Curtis, He said thta he has already informed the
experimentors that the solenoid will not be ready until tommorow, so he
|
Wed Jul 28 21:26:19 2004, Doug Preddy, Quench Recovery, Double Power bump
|
Two power bumps tonight. Everything tripped of. Restarted cooling water
pump, diff. pump under solenoid etc. Computer stayed on! Starting
compressor. |
Sun Oct 17 05:03:13 2004, Other, Start Up, Cycle valve after oscillations begin
|
(Sat night/Sun AM) Helium temperature started oscillating, so
powered off magnet (precautionary) and cycled valve 142 (at 04:12).
Small oscillations begin almost immediately, so close and open
|
Thu Jul 5 11:01:47 2007, Kevin Trithardt, Other, Current lead warm up
|
Due to curent lead temperature occilation Doug recommended warming up the
current leads.
|
Fri Jul 21 07:39:37 2006, Doug Preddy, Quench Recovery, Cool down continues
|
Raised PIC229 to 11Bar. Started to close HIC155. Cooling rates improve. |
Fri Jun 25 12:36:04 2004, Willy Andersson, Quench Recovery, Compressor unloaded etc.
|
At about 09:30 this morning I noticed the sound coming from the compressor
building seemed louder than usual. After entering the building I noted that
the compressor was unloaded to about 50% and the compressor suction was
|
Sat Aug 7 22:37:04 2004, Willy Andersson, Quench Recovery, Compressor tripped off.
|
Got a call at about 10:00 this morning, the whole system had tripped off.
No power bumps or other disturbances. When I arrived the only fault
indications were "ColdBox Trip" light on the compressor panel and on the
|
Tue Jun 13 10:54:27 2006, Doug Preddy, Quench Recovery, Compressor tripped off
|
No indicator lights etc as to why the compressor tripped. The only light
was a cold box fault. I had to shut off the main breaker before the
compressor would come back on.
|
Wed Nov 15 11:09:28 2006, Doug Preddy, Quench Recovery, Compressor tripped off
|
Compressor tripped this morning at ~8:45. I restarted the compressor, but
turbine 1 would not spin up. I let it warm for an hour and it started. I
started flow to the solenoind in parallel cold return. |
Thu Oct 12 11:53:04 2006, Willy Andersson, Quench Recovery, Compressor trip, 09:50 this morning.
|
Main compressor tripped, refrigerator shutdown. Checked with experimentors
and main control room, no indications of power bump etc.
|
Mon Jul 18 15:51:17 2005, Doug Preddy, Quench Recovery, Compressor restarted, flow to solenoid
|
Recovered the vacuum in the solenoid, then started the compressor.
Started flow to solenoid in parallel warm return. |
Mon Aug 6 08:41:31 2007, Doug Preddy, Quench Recovery, Cold box trip at 6:00
|
compressor off due to cold box trip at 6:00 this morning. Restarted system
and started flow to solenoid in parallel cold return. |
Fri Apr 16 10:15:26 2004, Doug Preddy, Start Up, Changes to M9sol Vacuum PC
|
Yesterday and today there have been a number of changes made to the M9
Vacuum control computer. The computer now automatically boots up to the
Epics control page. This logbook is also automatically started. |
Fri May 26 08:45:38 2006, Doug Preddy, Start Up, Changed to series mode
|
Changed to series mode.
Liquid level building. |
Fri Apr 23 09:19:30 2004, Doug Preddy, Normal Running, CV211
|
PIC 229 was down to 10.8 bar this morning. PIC 229 was trying to open CV211
to charge the system. I realized that in restoring the control to CV211 I
did not get the wire into the connector properly. Went back up to the
|
Fri May 26 07:29:54 2006, Doug Preddy, Start Up, CV155 closed
|
CV155 closed.
Temps about 15K |