M9sol Logbooks Solenoid Daily log
  Solenoid logbook, Page 14 of 15  ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
Entry  Wed May 5 09:59:10 2004, Doug Preddy, Quench Recovery, started flow to power leads 
Started flow to power leads.
TIC121 into auto mode
Entry  Wed May 5 07:55:37 2004, Doug Preddy, Quench Recovery, Solenoid quenched on power lead temp may5_745.BMP
Solenoid quenched on power lead temp. I ran down and managed to recover it 
with minimal temp rise in the solenoid. Coil temps are falling, liquid is 
building. No flow to the power leads yet.
Entry  Tue May 4 11:26:38 2004, Doug Preddy, Normal Running, power leads  may4_1053.BMP
Power cycled HIC 142 with solenoid power at 400 amps. Flows > 240mm and 
temps have dropped.
Entry  Tue May 4 11:20:57 2004, Doug Preddy, Normal Running, power leads going unstable 
power lead ripples increased over last couple of days. They are quickly 
dieing out now and the temps are startint to increase. PL flow is down to 
<180mm. I will power cycle HIC 142.
Entry  Fri Apr 30 01:53:34 2004, Doug Preddy, Quench Recovery, switched to parallel cold 
 
Entry  Thu Apr 29 23:43:15 2004, Doug Preddy, Quench Recovery, Starting flow to solenoid 
Solenoid quenched due to power leads at 9:00 tonight. Restarted flow in 
parallel warm mode. 
Entry  Wed Apr 28 09:30:09 2004, Doug Preddy, Normal Running, power leads again 
Same story as yesterday. Ripples dieing out, flows down to <200 mm, temps 
increasing. Turned HIC 142 down to 0.4 then back up to 0.75. Temps dropped 
quickly. Then turned HIC 142 to 0 and back to 0.75. Temps dropping, flow > 
Entry  Tue Apr 27 09:03:18 2004, Doug Preddy, Normal Running, Power leads 
Power leads are being monitored with the strip tool graphs. I saw the temps 
go from having a ripple to almost no ripple, but starting to increase in 
temperature. I also noticed that the flow had dropped to 200 mm. I power 
Entry  Mon Apr 26 08:12:30 2004, Doug Preddy, Quench Recovery, Power leads flow 
Throttled back the LHe in until the power leads started to warm. My goal is 
to flow "warm" gas (hopefully 80K) through the leads to drive any frozen 
impurities out.
Entry  Mon Apr 26 07:48:46 2004, Doug Preddy, Quench Recovery, Series mode 
Switching over to series mode.
Entry  Sun Apr 25 21:41:00 2004, Willy Andersson, Quench Recovery, Trip on PL Temp. 
Got pager call at 16:20 this afternoon. Solenoid had tripped on PL 
temperature. Arrived at about 17:00. Did a print screen of the striptool 
graph and solenoid screen. See files Prtscrn1_april25_2004.doc and
Entry  Fri Apr 23 09:19:30 2004, Doug Preddy, Normal Running, CV211 
PIC 229 was down to 10.8 bar this morning. PIC 229 was trying to open CV211 
to charge the system. I realized that in restoring the control to CV211 I 
did not get the wire into the connector properly. Went back up to the 
Entry  Thu Apr 22 10:39:16 2004, Doug Preddy, Normal Running, Yesterday 
Added two bottles of UHP helium to buffer tank.
Had no liquifation rate, so optimized Ti121 and HIC141 . Finally put TIC121 
into manual mode at 0.65. Power lead fluctuation died out and liquid 
Entry  Wed Apr 21 09:57:59 2004, Willy Andersson, Start Up, System status 
Buffer tank pressure is down to about 6 psig. Too low to keep up
with liquefaction requirements to build LHe level. Doug Preddy
requested that I help Curtis Ballard top up system with new
Entry  Wed Apr 21 08:16:18 2004, Doug Preddy, Start Up, switch to series mode 
Switched to series mode.
Entry  Wed Apr 21 06:48:31 2004, Doug Preddy, Start Up, JT bypass closed 
Closed cv155
Entry  Wed Apr 21 06:39:17 2004, Doug Preddy, Start Up, over night 
Changed to parallel cold mode at 9:30.
At about 4:30 the city water chiller was turned on. The air compressor had 
also tripped off. It was reset and restarted.
Entry  Tue Apr 20 07:33:03 2004, Doug Preddy, Start Up, PIC229 at 11bar 
PIC229 at 11 bar. Changed strip tool to 15 sec increments.
Entry  Tue Apr 20 07:06:41 2004, Doug Preddy, Start Up, morning day 2 april200705.BMP
Temps in solenoid are equalling out. Increasing PIC229 to 11 bar. 
Entry  Mon Apr 19 15:06:49 2004, Doug Preddy, Start Up, Started turbines april191500.BMP
Purifier run over the weekend. Both LN2 dewars empty, but purifier cold. 
Disabled CV211 and flowed all charge gas through purifier. Started turbine 
at 11:00am. set strip tool to monitor temps. Started M9BCP2. Pumped out 
ELOG V2.9.2-2455