M9sol Logbooks
Solenoid
Daily log
Solenoid logbook, Page 10 of 15
New
|
Reply
|
Find
|
Delete
|
Last day
|
Help
|
Config
New entries since:
Wed Dec 31 16:00:00 1969
Full
| Summary |
Threaded
286 Entries
Goto page
Previous
1
,
2
,
3
...
9
, 10,
11
...
13
,
14
,
15
Next
All
ID
Date
Author
Operational Mode
Subject
Text
175
Thu Oct 26 14:14:57 2006
Doug Preddy
Quench Recovery
power lead quench
solenoid tripped on power lead temp. I was
here and caught it. System
cooling.
176
Tue Oct 31 03:52:29 2006
Doug Preddy
Quench Recovery
power lead quench at 2:30 this morning
Compressor still on. Starting flow to solenoid
177
Tue Oct 31 05:36:14 2006
Doug Preddy
Quench Recovery
switch to series mode
178
Tue Oct 31 08:37:34 2006
Doug Preddy
Quench Recovery
Energizing solenoid
179
Fri Nov 3 12:09:51 2006
Doug Preddy
Normal Running
Fine tuning
The power lead temperatures have been climbing
at a rate of ~ 0.02K very 8
hours. The negative lead started to show
180
Tue Nov 7 10:35:32 2006
Doug Preddy
Normal Running
Maintenance day
I ramped down the solenoid power suplly and
shut off flow to the power
leads. I will allow them to warm up and (hopefully)
181
Wed Nov 15 11:09:28 2006
Doug Preddy
Quench Recovery
Compressor tripped off
Compressor tripped this morning at ~8:45.
I restarted the compressor, but
turbine 1 would not spin up. I let it warm
182
Wed Nov 15 13:56:00 2006
Doug Preddy
Quench Recovery
switch to series mode
184
Tue Nov 28 10:32:04 2006
Doug Preddy
Quench Recovery
recovering after looong power outage
The power has been out for about 24 hours.
Recovering coldbox, solenoid and
beamline vacuum.PLC is down for the vacuum
185
Fri Jan 26 15:10:37 2007
Doug Preddy
Maintenance
new control computer installed
I have installed a new control computer at
the M9 solenoid control panel
186
Mon Mar 5 14:59:41 2007
Doug Preddy
Maintenance
Password
On the weekend someone used this log to send
spam messages. I have
installed a password for the write privilege.
187
Thu Apr 19 15:18:25 2007
Doug Preddy
Start Up
preparing to start the refrigerator
Starting the vacuum systems in the coldbox
and solenoid.
188
Fri Apr 20 12:15:12 2007
Doug Preddy
Start Up
remote PLC switch
I could not control the vacuum devices using
EPICS. The buttons could be
pushed, but nothing would respond. The PLC
189
Mon Apr 23 16:31:02 2007
Doug Preddy
Start Up
Started compressor
Startewd compressor and purifer today.
190
Tue Apr 24 10:21:49 2007
Doug Preddy
Start Up
Started flow to turbines
Started flow to turbines at about 10:00 in
parallel warm mode.
191
Fri Apr 27 10:10:07 2007
Doug Preddy
Normal Running
Solenoid Cold
Solenoid cold, power leads cold. Alarm handler
started.
193
Fri Apr 27 10:32:07 2007
Doug Preddy
Quench Recovery
Reset quench relay logic box
The quench relay logic controller was not
functioning correctly. It showed
a "Trip" light and no other lights. I cycled
194
Mon Apr 30 09:30:26 2007
Doug Preddy
Normal Running
problems over weekend
The PLC Limit switch power supply was tripped
off on Saturday. I came in
and reset it and restarted all the vacuum
195
Wed May 2 16:28:16 2007
Doug Preddy
Normal Running
Energizing solenoid to 500 amps
Power supply initially would not ramp up.
I exercised the rate control
selector switch and found that the power
196
Wed May 16 10:02:35 2007
Doug Preddy
Maintenance
warming up power leads
Power lead temps have been slowly increasing
over the last wekk. I ramped
the solenoid down and am warming the power
Goto page
Previous
1
,
2
,
3
...
9
, 10,
11
...
13
,
14
,
15
Next
All
ELOG V2.9.2-2455