| ID | 
Date | 
Author | 
Operational Mode | 
Subject | 
Text | 
  | 
| 
  106  
 | 
Mon Jul 18 15:51:17 2005 | 
Doug Preddy | Quench Recovery | Compressor restarted, flow to solenoid | Recovered the vacuum in the solenoid, then 
started the compressor.
 
Started flow to solenoid in parallel warm | 
   | 
| 
  105  
 | 
Mon Jul 18 11:18:40 2005 | 
Doug Preddy | Quench Recovery | Solenoid Quenched over the weekend | The solenoid was found to be warm on Monday 
morning. M9Q3 had a bad water 
 
leak over the weekend. The water header serving | 
   | 
| 
  104  
 | 
Tue Jun 14 23:01:22 2005 | 
Doug Preddy | Quench Recovery | switched to parallel cold return |   | 
   | 
| 
  103  
 | 
Tue Jun 14 20:53:19 2005 | 
Doug Preddy | Quench Recovery | restarted refrigerator after power bump | see bitmap for temps/pressures after presurrizing 
coldbox. Preparing to 
 
start flow to turbines, then will start flow | 
    | 
| 
  102  
 | 
Tue Jun 14 18:48:14 2005 | 
Experimentor | Normal Running | Power bump at 18:40 | Solenoid tripped on a power bump at 18:40 
Tuesday
 
-- Donald Arseneau | 
   | 
| 
  101  
 | 
Thu Jun  9 21:41:25 2005 | 
Willy Andersson | Quench Recovery | Trying to achieve stable cooling. | From about 08:00 to 15:00
 
 
See Doug's previous entry for quench recovery | 
   | 
| 
  100  
 | 
Thu Jun  9 08:56:10 2005 | 
Doug Preddy | Quench Recovery | system back on | The compressor was restarted and the solenoid 
is cooling (sort of) in 
 
parallel cold return. | 
   | 
| 
  99  
 | 
Thu Jun  9 06:53:40 2005 | 
Experimentor | Other | Trip at 6:45 Today.   | Solenoid quenched at 6:45.  All temperature 
monitors were flat until trip.  
 
Hearing compressor stop was first warning. | 
   | 
| 
  98  
 | 
Thu Jun  2 09:16:40 2005 | 
Doug Preddy | Quench Recovery | continuing to cool | See screen grab | 
    | 
| 
  97  
 | 
Thu Jun  2 01:38:25 2005 | 
Doug Preddy | Quench Recovery | strip tool plot | This is a strip tool  plot of the cooldown | 
    | 
| 
  96  
 | 
Thu Jun  2 01:26:30 2005 | 
Doug Preddy | Quench Recovery | started flow to solenoid | See attached file for a screen grab of temps. | 
    | 
| 
  95  
 | 
Wed Jun  1 23:48:02 2005 | 
Doug Preddy | Quench Recovery | the first quench | I recieved a call from ops at 22:00 tonight 
that the solenoid had alarmed. 
 
I came in and found a cold box fault, with | 
   | 
| 
  94  
 | 
Wed Jun  1 08:23:19 2005 | 
Doug Preddy | Start Up | start up notes | The solenoid was pumped out Monday and yesterday 
after the quads just 
 
downstream of the solenoid were put back | 
   | 
| 
  93  
 | 
Thu May 19 15:05:31 2005 | 
Doug Preddy | Maintenance | STA 120 replaced | The turbine 2 speed indicator control box 
STA 120 has been replaced with a 
 
newer style Jaquet controller. This is similar | 
    | 
| 
  92  
 | 
Mon Apr 18 09:52:11 2005 | 
Doug Preddy | Maintenance | Relays replaced | The following relays have been replaced in 
the Sulzer control panel:
 
K341, K379, K132, K324A, K314, K125, K127, | 
   | 
| 
  91  
 | 
Fri Mar 11 09:18:30 2005 | 
Doug Preddy | Maintenance | services on system | The cold box was isolated and pumped out after 
it warmed up. It has been 
 
refilled with helium.
 | 
   | 
| 
  90  
 | 
Sun Dec  5 11:15:24 2004 | 
Doug Preddy | Normal Running | more ripples | I loked at the power lead temps this morning. 
LHe_in 10.4-12.0  PL-Neg 8.0-
 
9.0  PL-Pos 9.8-10.4. Flows down to 160mm. | 
   | 
| 
  89  
 | 
Thu Dec  2 10:51:16 2004 | 
Doug Preddy | Normal Running | power lead ripple | Ripples got worse overnight.LHe in 10.3-11.7, 
PL Neg 8.0-8.7. Flows <200mm.
 
cycled CV142. Flows 240mm. LHe in 10.3-11.3 | 
   | 
| 
  88  
 | 
Wed Dec  1 12:55:56 2004 | 
Doug Preddy | Normal Running | added one bottle helium gas | buffer tank pressure is up to 6.5 psi. | 
   | 
| 
  87  
 | 
Mon Nov 29 09:28:16 2004 | 
Doug Preddy | Normal Running | Buffer  tank empty | Came down to check on system. CV211 was fully 
open, trying to charge the 
 
system. Ripples on LHe in and PL neg. CV141 | 
   |