temp of leads begins its exponential rise again (caught it at 12K), approx
11 hours after last reset. this time asked operator to shut off valve for
3 seconds, then turn back on.
previous recycle, asked operator to shut off valve for two seconds ... and
the warm up time was 11 hours.
previous^2 recyle, asked operator to shut off valve for 1 second ... and
the warm up time was only 4 hours.
Syd |