> temp of leads begins its exponential rise again (caught it at 12K), approx > 11 hours after last reset. this time asked operator to shut off valve for > 3 seconds, then turn back on. > > previous recycle, asked operator to shut off valve for two seconds ... and > the warm up time was 11 hours. > > previous^2 recyle, asked operator to shut off valve for 1 second ... and > the warm up time was only 4 hours. > > Syd