M9sol Logbooks
Solenoid
Daily log
Solenoid logbook
Fields marked with
*
are required
Entry time:
Wed Jan 15 13:02:56 2025
Author
*
:
- please select -
Doug Preddy
Curtis Ballard
Kevin Trithardt
David Kishi
Experimentor
Other
Operational Mode:
- please select -
Normal Running
Quench Recovery
Start Up
Shut Down
Maintenance
Other
Subject
*
:
> Purifier run over the weekend. Both LN2 dewars empty, but purifier cold. > Disabled CV211 and flowed all charge gas through purifier. Started turbine > at 11:00am. set strip tool to monitor temps. Started M9BCP2. Pumped out > beamline between BV% and BV7. Opened BV6.
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
ELOG V2.9.2-2455