M9sol Logbooks
Solenoid
Daily log
Solenoid logbook
Fields marked with
*
are required
Entry time:
Wed Jan 15 13:56:07 2025
Author
*
:
- please select -
Doug Preddy
Curtis Ballard
Kevin Trithardt
David Kishi
Experimentor
Other
Operational Mode:
- please select -
Normal Running
Quench Recovery
Start Up
Shut Down
Maintenance
Other
Subject
*
:
> power lead temps caused a quench at 8:30 this morning. Recovery of system > and flow to solenoid was started by 11:00. Solenoid was switched to series > cold at 3:00. Solenoid and power leads were cold at ~6:30. power supply > was to be energized by experimenters.
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
ELOG V2.9.2-2455