M9sol Logbooks
Solenoid
Daily log
Solenoid logbook
Fields marked with
*
are required
Entry time:
Wed Jan 15 13:57:53 2025
Author
*
:
- please select -
Doug Preddy
Curtis Ballard
Kevin Trithardt
David Kishi
Experimentor
Other
Operational Mode:
- please select -
Normal Running
Quench Recovery
Start Up
Shut Down
Maintenance
Other
Subject
*
:
> Solenoid and cold box were pumped out last Tuesday. Cold box roughing pump > initially would not start. had to retighten all wires on the contactor in > the Sulzer control panel (RP900). > Started compressor on Friday. ran purifier over the weekend. > Started flow in parallel warm return. Started flow to turbines. > Replacing dead monitor on other control computer.
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
ELOG V2.9.2-2455