Tuda logbooks
General
E1104
ISACII
E1195
E1103
E1147
S1287
S1203
S1233
S1284
S1447 23Na(a,p)
S1540
S1381
S1847 Catania
S1287
Fields marked with
*
are required
Entry time:
Mon Apr 11 18:39:17 2011
Author
*
:
Type:
- please select -
Routine
Other
Category:
- please select -
General
Other
Subject:
TUDA was successfully re-installed on SEBT1 by LB, TD, AML and PM. Alignment checked by pillar mounted telescope downstream of HERACLES and target ball between SEBT1 bending magnet and diagnostic section. With minor adjustments of upper stage table the upstream and downstream targets were within 15 thou L-R/U-D. Upper stage table and feet locked. 14.00 Cryo pumped by TUDA2:BP5 to <100mTorr TUDA2.RVC5 closed and cryo compressor switched on See attachment 1 for EPICS log Note: MiniSys Eye-IMG ion gauge installed (EPICS readout only) Re-entrant flange assembly installed - currently the 'window' NW25 fitting is open. Centre target ladder linear translator re-installed. Note the downstream linear translator needs to be moved to the upstream position. 18.28 Time from 1 bar to 250mTorr ~12m (turbo ON) Time from 250mTorr to 5.0E-4Torr ~5m (cryo ON) Note: Transients in TUDA:PNG5:RDVAC when cryo gate valve opened Observed pressure decreases to <1E-10Torr (PM tells me that for this gauge this effectively means 'off' cf. the usual TUDA ion gauge which reads high when 'off') Time from 5.0E-4Torr to 5.0E-05Torr ~6m ('good' vacuum) Total pump down ~24m (empty chamber) See attachment 2 for EPICS log 07.32 Tuesday 12 April See attachment 3 for overnight EPICS log TUDA2:PNG5:RDVAC 7.2E-07Torr
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Resubmit as new entry
Attachment 1:
2.png
Original size: 812x634
Attachment 2:
3.png
Original size: 812x634
Attachment 3:
4.png
Original size: 812x634
Attachment 4:
ELOG V2.9.2-2455