<p>No major problems presented, A pluser walk was performed at the begining of the shift run161 S2-1 front, run162 S2-2 front, run163 S2-1 back and run165 S2-2 back.</p>
<p>Runs 166, 168, 169 are void due to bad scaler reading</p>
<p>Two times the control room reported the dipole magnet tripped but beam was recovered within few minutes. FC0 readings range 150-120epA</p>
<p>S2-1 L. current 17.60uA @ 16:00 and 18.85uA @ 23:10</p> |