Tuda logbooks
General
E1104
ISACII
E1195
E1103
E1147
S1287
S1203
S1233
S1284
S1447 23Na(a,p)
S1540
S1381
S1847 Catania
S1287
Fields marked with
*
are required
Entry time:
Thu Nov 14 20:24:38 2024
Author
*
:
Type:
- please select -
Routine
Other
Category:
- please select -
General
Other
Subject:
<p>At approximately 7pm, noted that trigger rate in S2-1 had dropped by factor of ~20. Detector had tripped off due to leakage current reaching 8uA - spotting this was delayed as camera (or web-browser) monitoring currents had frozen. Current trip point has been increased to 12uA, and the beam intensity lowered to try to preserve the detector through out the night.</p> <p>At some point this may be increased again but that will have to await a discussion of how much the detector can take. Replacing it would take ~6hrs so ideally we'd like it to survive until the end of the experiment.</p> <p>For the time being we need to monitor the leakage closely (and ensure the web cam image is updating) and if the trip point is approached, either lower the beam current or switch off the detector for a while to allow it to recover, or both.</p>
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
ELOG V2.9.2-2455