Tuda logbooks
General
E1104
ISACII
E1195
E1103
E1147
S1287
S1203
S1233
S1284
S1447 23Na(a,p)
S1540
S1381
S1847 Catania
S1203
Fields marked with
*
are required
Entry time:
Thu Nov 14 21:02:38 2024
Author
*
:
Type:
- please select -
Routine
Other
Category:
- please select -
General
Other
Subject:
<p> </p> <p>Persons on shift : Ritu, Nigel, Alex, Sambuu & Hicham</p> <p>Finally, we got our first 11Li beam around of 1800 pps for 4.77 MeV/u @ 21h55.</p> <p>The CD2 target is 184ug/cm2 thick </p> <p>The setup is 4 dE-E LEDA downstream sectors (~6cm) + 8 LEDA upstream sectors (~5cm) + 1 S2 downstream (~65cm)</p> <p>We are using a scintillator to measure the 11Li beam intensity</p> <p>The turbo is off, the pressure is around 3e-6 and stable for more than 3hours</p> <p>The Chiller temp. is set to 3 Celsius, the preamp temp is stable around 10C</p> <p>We saw the elastic scattering in the S2 detectors, and some hit in the upstream detector.</p>
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
ELOG V2.9.2-2455