485
|
Monday, January 11, 2016, 09:02 |
Anders Mjos | | | | | | | | Venting | Monday, January 11, 2016, 09:02: Turbos
stopped.
Monday, January 11, 2016, 12:58: |
|
492
|
Friday, January 22, 2016, 11:07 |
Anders Mjos | | | | | | | In progress | Venting | Friday, January 22, 2016, 11:07:
Stopped turbos |
|
105
|
Tuesday, June 26, 2012, 16:06 |
Anders Mjos | | | | | | | Done | Vented |
|
|
137
|
Monday, July 09, 2012, 12:57 |
Anders Mjos | | | | | | | Done | Vented | |
|
240
|
Tuesday, December 04, 2012, 11:05 |
Anders Mjos | | | | | | | | Vented | In preparation for RFQ target and leak
troubleshooting.
Tuesday, December 04, 2012, 11:04: |
|
920
|
Wednesday, April 20, 2022, 13:42 |
Aaron Schmidt | | | | | | | | Vent Beamline half | Aurelia to do a visual test later.
Wednesday, April 20, 2022, 13:41:
IG6 Off. TP6 & TP2 off. |
|
24
|
Monday, October 17, 2011, 10:22 |
Anders Mjos | FEBIAD | | | | | | Problems/Solutions | Variable leak valve replaced | Variable leak valve with serial number
F3-592 has been replaced by F3-649 due
to regulating problems described previously |
|
25
|
Monday, November 14, 2011, 15:40 |
Anders Mjos | | | | | | | Problems/Solutions | Variable leak valve repaired |
|
|
28
|
Tuesday, December 20, 2011, 16:09 |
Anders Mjos | | | | | | | Problems/Solutions | Variable leak valve repaired |
|
|
357
|
Wednesday, January 29, 2014, 14:42 |
Anders Mjos | | | | | | | Problems/Solutions | Valved off water to TSG and TMS:MB1 | CuLCW will be shut off tomorrow. Valved
off water supply to MB1 and TSG to minimize
air into the system. Turbos are off. |
|
344
|
Tuesday, November 12, 2013, 12:38 |
Anders Mjos | | | | | | | Problems/Solutions | Vacuumed desk, on and around the beam line | |
|
779
|
Thursday, January 23, 2020, 16:05 |
Anders Mjos | | | | | | | Problems/Solutions | Vacuum tripped due to PLC/EPICS for for the new BIAS | Thursday, January 23, 2020, 16:05: Restarting
vacuum and TPs |
|
601
|
Thursday, August 03, 2017, 17:00 |
Anders Mjos | | | | | | | Problems/Solutions | Vacuum system tripped on power interruption | Thursday, August 03, 2017, 17:00:
Restarted TPs |
|
791
|
Friday, March 27, 2020, 11:30 |
Aaron Schmidt | | | | | | | | Vacuum loss / spike / Shutdown | The ISAC was left with the turbo pumps
and water supplies running. Just the power
supplies off. Monday, March, 23, 2020. |
|
792
|
Tuesday, April 07, 2020, 10:53 |
Anders Mjos | | | | | | | | Vacuum loss / spike / Shutdown |
|
|
577
|
Monday, April 10, 2017, 15:12 |
Anders Mjos | | | | | | | Problems/Solutions | Vacuum leak on front door | The vacuum behaved erratic over night with
excursion up into the mid 10^-6 Torr range.
To investigate the chamber was vented. With |
|
697
|
Monday, November 19, 2018, 14:22 |
Aaron Schmidt | | | | | | | Problems/Solutions | Vacuum issues. |
Normal
0
|
|
350
|
Thursday, December 12, 2013, 09:01 |
Anders Mjos | | | | | | | Problems/Solutions | Vacuum excursion over night | Monday, December 16, 2013, 08:53
Some additional smaller magnitude
excursions have been observed since the fist |
|
570
|
Wednesday, February 15, 2017, 13:42 |
Aaron Schmidt | | | | | 42218-11 | 41751-6 | Problems/Solutions | Vacuum Check (Water leak) | *Vacuum from previous test still active,
minus turbo pumps. Same target, & heat
shield as well.* |
|
776
|
Friday, January 03, 2020, 11:56 |
Anders Mjos | | | | | | | Problems/Solutions | Upgrading BIAS Power Supply | A new power supply was installed today
by John Chow. Due to differences in pin configuration