420
|
Monday, January 05, 2015, 09:20 |
Anders Mjos | | | | | | | Problems/Solutions | IV4 did not get close signal before the Hollidays | The valve closes physically, but does not
receive the closed signal.
Cycled the valve multiple times before |
|
421
|
Tuesday, January 20, 2015, 14:31 |
Anders Mjos | | | | | | | Problems/Solutions | Ne leak disconnected for recallibration | SN 11-231 from VIC |
|
423
|
Wednesday, January 28, 2015, 10:40 |
Anders Mjos | | | | | | | Problems/Solutions | Test Stand shut down for site wide power outage today | Friday, January 30, 2015, 10:50: Optics
section accidentally vented during work on
the ER |
|
424
|
Tuesday, February 03, 2015, 09:40 |
Anders Mjos | | | | | | | Problems/Solutions | RGA installation | Tuesday, February 03, 2015, 09:40: Venting
RGA installed on the 12" CF
port below the Source Tray. |
|
426
|
Tuesday, February 03, 2015, 16:10 |
Anders Mjos | | | | | | | Problems/Solutions | Current read back on TBHT has been corrected to 600 A | By controls group |
|
427
|
Friday, February 13, 2015, 13:59 |
Anders Mjos | | | | | | | Problems/Solutions | PLC failure | The PLC CPU came out of the socket around
11:50am today (Dave Morris). The CPU had
not been properly attached. This resulted |
|
429
|
Wednesday, February 18, 2015, 13:32 |
Anders Mjos | | | | | | | Problems/Solutions | Switched off system in preparation for power outage | Thursday, February 19, 2015, 12:14: Starting
system again after the power outage
Thursday, February 19, 2015, 13:27: |
|
434
|
Thursday, April 09, 2015, 11:21 |
Anders Mjos | | | | | | | Problems/Solutions | No RGA communcations | RGA stopped working. Likely after a spark
yesterday. |
|
435
|
Monday, April 13, 2015, 13:07 |
Anders Mjos | | | | | | | Problems/Solutions | ISAC Test Stand Optical elements power supply drop out | See e-fault 8027
Monday, April 13, 2015
Kevin and Graham are working on it |
|
437
|
Friday, April 24, 2015, 12:25 |
Anders Mjos | | | | | | | Problems/Solutions | Backing line pressure high | TSG:RP1 backing line pressure is >200
mT. An e-fault has been submitted to have
the roughing pump replaced. |
|
439
|
Monday, May 04, 2015, 09:51 |
Anders Mjos | | | | | | | Problems/Solutions | FEBIAD Coil power supply replaced | Power supply did not work after high
voltage conditioning. On Friday May 1st John
Chow replaced the power supply with a |
|
440
|
Friday, May 08, 2015, 09:07 |
Anders Mjos | | | | | | | Problems/Solutions | EPICS lost contact with the PLC | Everything shut down, while EPICS showed
everyhing to be on.
Controls group (Dave Morris) has |
|
442
|
Tuesday, May 19, 2015, 19:10 |
Anders Mjos | | | | | | | Problems/Solutions | EPICS white out | Likely caused by the PLC. e-fault
8139
Wednesday, May 20, 2015 |
|
443
|
Thursday, May 21, 2015, 16:40 |
Anders Mjos | | | | | | | Problems/Solutions | Reconfigured service cap coil connections | The service cap has been reconfigured
(colling and electric) to be compatible with
the TM2 Source tray. Coil- is E & F , |
|
445
|
Thursday, May 21, 2015, 17:38 |
Anders Mjos | | | | | | | Problems/Solutions | Installed equipment for measuring outgassing rate | A gauge and a valve was installed
on the roughing line to the large turbo pump |
|
448
|
Wednesday, June 03, 2015, 09:35 |
Anders Mjos | | | | | | | Problems/Solutions | PLC upgrade | Wednesday, June 03, 2015, 09:35: TP6 and
TP2 off
Wednesday, June 03, 2015, 10:15: |
|
449
|
Monday, June 15, 2015, 14:07 |
Anders Mjos | | | | | | | Problems/Solutions | Test Stand Source Tray installed | Monday, June 15, 2015
Remaining items to do
ANODE wire not yet attached
|
|
453
|
Monday, June 29, 2015, 16:51 |
Friedhelm Ames | | | | | | | Problems/Solutions | TSG:BV1B closed | found TSG:TP1B tripped off. Closed TSG:BV1B
as pressure at TSG:iG1 was rising. Pressure
is coming down again. |
|
455
|
Monday, July 06, 2015, 09:29 |
Anders Mjos | | | | | | | Problems/Solutions | Replaced out gassing gauge on the backing line | |
|
458
|
Tuesday, August 04, 2015, 13:37 |
Anders Mjos | | | | | | | Problems/Solutions | Equipment for outgassing measurements removed | |
|