Entry  Friday, June 29, 2012, 15:03, Friedhelm Ames, , , , , , , , start ramping down heater 
 
    Reply  Friday, June 29, 2012, 16:39, Friedhelm Ames, , , , , , , , mass scan finished 

Friedhelm Ames wrote:

mass spectrum saved as

plotdump-local-clean.txt_Jun29_12_14-55-43.txt

 new parameters for mass scan program after fit of mass scan

CONST11 = -4.13

CONST22 = 0.09595

Entry  Tuesday, July 03, 2012, 09:23, Friedhelm Ames, , , , , , , In progress, start up again 

purged Ne line and started cathode heater ramp up to 295 A

Entry  Tuesday, July 03, 2012, 19:05, Friedhelm Ames, , , , , , , Problems/Solutions, short in anode 

A short in the anode has developed during the heater ramp up. Increasing the current limit did not cure it. Start heater ramp down to investigate.

Entry  Wednesday, July 04, 2012, 09:22, Friedhelm Ames, , , , , , , Problems/Solutions, turbo pumps stopped 

turbo pumps stopped to prepare for venting for anode short investigation.

Entry  Thursday, July 05, 2012, 10:59, Friedhelm Ames, , , , , , , Problems/Solutions, water tripping in front of HV power supplies 

Found some water tripping in front of the high voltage power supplies rack from the water lines at the ceiling. Plastic sheets have been put on top of the racks and MCR has been informed.

Entry  Thursday, July 05, 2012, 11:00, Friedhelm Ames, , , , , , , In progress, source started up again 

tube heater ramping started

Entry  Thursday, July 05, 2012, 18:02, Friedhelm Ames, , , , , , , Problems/Solutions, fluctuations in magnet current TMSMB1_2012_07_05.PNG

The current at the magnet power supply TMS:MB1 shows fluctuations every 1-2 minutes. The same can be seen in the Hall probe read back and in the beam current at Fc6.

    Reply  Thursday, July 05, 2012, 18:10, Friedhelm Ames, , , , , , , Problems/Solutions, fluctuations in magnet current 

Friedhelm Ames wrote:

The current at the magnet power supply TMS:MB1 shows fluctuations every 1-2 minutes. The same can be seen in the Hall probe read back and in the beam current at Fc6.

 a fault report has been issued to power supplies group. Dan Louie will look into it.

Entry  Friday, July 06, 2012, 11:04, Friedhelm Ames, , , , , , , , source tripped off over night 

A big vacuum excursion tripped the source off at about 1am. The vacuum did not fully recover afterwards only down to about 1.3e-6T. Ne leak has been closed and vacuum went down to 6e-7T within a few minutes. After the trip the current of the magnet stayed constant. Fluctuations may have been caused by high voltage sparks.

Entry  Friday, July 06, 2012, 11:05, Friedhelm Ames, , , , , , , , start source again 

heater ramping up again with Ne leak closed.

Entry  Friday, July 06, 2012, 11:18, Friedhelm Ames, , , , , , , , TSG:TP1B off source off again. 

turbo pump TSG:TP1B has tripped off. Cannot be restarted. Fault report to vacuum. Everything switched off again

 

Entry  Friday, July 06, 2012, 15:36, Friedhelm Ames, , , , , , , Done, switched everything off 

switched everything off to prepare for scheduled power outage on Monday

Entry  Thursday, September 06, 2012, 09:23, Friedhelm Ames, NB#7, , , , , , ,  

start high voltage and heaters

Entry  Friday, September 07, 2012, 12:11, Friedhelm Ames, NB#7, LP-SIS, , , , , In progress, mass scan started 

mass scan has been started after optimization on 23Na

Entry  Friday, September 07, 2012, 13:10, Friedhelm Ames, Nb#7, , , , , , Done, mass scan finished 

mass scan is finished saved as

http://isacwserv.triumf.ca/onlylocal/isactdata/save_restore/masscorr/plotdump-local-clean.txt_Sep7_12_13-01-51.txt

Entry  Tuesday, September 11, 2012, 13:13, Friedhelm Ames, Nb#7, LP-SIS, , , , , In progress, start cool down 

start cooldown. Found computer at teststand off. Somebody tried to login with username ARIEL.

Entry  Tuesday, September 11, 2012, 19:48, Friedhelm Ames, NB#7, HP-SIS, , , , , Done, cool down finished, all source power supplies off. 
 
Entry  Thursday, September 13, 2012, 13:05, Friedhelm Ames, Nb#7, LP-SIS, , , , , , heater ramping up started 
 
Entry  Wednesday, October 10, 2012, 10:47, Friedhelm Ames, , , , , , , Failed, found teststand tripped off 

turbo pumps in source section and all ion gauges off all optics and heaters tripped. Reason unknown.