  41   Wednesday, February 29, 2012, 09:43 Friedhelm Ames       checking gas inlet valve for FEBIAD    
  454   Tuesday, June 30, 2015, 14:51 Anders MjosZrC#7LP-SIS TM241177-2 In progressZrC#7 Conditioning 2Tuesday, June 30, 2015, 14:51: Roughing
Tuesday, June 30, 2015, 16:14: Started
turbos. CG1 at 0.075 T
 ZrC#7_Second_Time.docxTGT2-ER580-200-30kV-m39-off60-3.txt 
  450   Monday, June 15, 2015, 14:09 Anders MjosZrC#7LP-SIS TM241177-1 In progressZrC#7 ConditioningMonday, June 15, 2015, 14:05 Roughing
Monday, June 15, 2015, 14:39: Turbos
started.
 ZrC#7.docxER580-220-30kV-m39-off30.txt 
  184   Monday, August 27, 2012, 15:21 Aurelia Laxdal      In progressXantrex PS 10-600 for TSH:TGHT is not working When turned ON it was not going higher
than 3.6A (EPICS/front panel).  Kazuya checked
the connections at the back and also the
  
  348   Monday, December 02, 2013, 15:21 Anders Mjos      Problems/SolutionsXantrex 10V 600A installed and in Cathode Negative modeBy Ray Dube.    
  626   Wednesday, January 31, 2018, 09:53 Aaron Schmidt    (Blank)42752-3DoneWire moved.Wednesday, January 31, 2018, 09:50: A wire
(B - F) was too close (Almost touching) to
the EZL and had visible sparks during HV
  
  152   Thursday, July 19, 2012, 11:31 Anders Mjos      Problems/SolutionsWiped o-rings and sealing faces

    

       
            
  
  1043   Friday, December 20, 2024, 09:37 Dave Neilson       Winter holiday shutdownFriday, December 20, 2024, 09:37 
  turned off all 4 turbopumps. winding
down prior to evacuating.
  
  352   Friday, December 20, 2013, 15:46 Anders Mjos      Problems/SolutionsWater switched off for the holidays    
  127   Thursday, July 05, 2012, 08:41 Anders MjosFEBIAD anode end cap test     In progressWater opened - reduced flow heat shield

    

       
            
  
  85   Tuesday, May 15, 2012, 07:39 Rick MaharajSic #27HP-SISITETM4  In progressWater on at test standThe vacuum on TSGIG1 reads 2.85e-07. Turing
on water on teststand and observing any changes
in vacuum pressure.
  
  202   Thursday, September 13, 2012, 08:24 Anders MjosNb#7LP-SISITWTM1  In progressWater onThursday, September 13, 2012, 08:16: Opened
up cooling water. Vacuum (IG1) increased
from 5.9E-7 to 6.2E-7 before returning to
  
  868   Sunday, April 04, 2021, 14:16 Carla Babcock       Water leak problem persistsIG1 has been spiking randomly, causing
everything to turn off. Looks like the water
leak is still there.
  
  803   Tuesday, July 28, 2020, 13:27 Aaron Schmidt      Problems/SolutionsWater leak on magnet PS Fault: 13334
  
  871   Monday, April 19, 2021, 14:58 Anders Mjos P2N-SIS    Problems/SolutionsWater leak on coil neg (H and F)Determined on Friday April 16th that the
water leak was on the coil negative circuit.
This was determined by circulating water
  
  401   Wednesday, August 27, 2014, 12:55 Anders Mjos      Problems/SolutionsWater leak on MB1e-faulted
by operations Aug 26th
  
  763   Wednesday, October 23, 2019, 09:51 Aaron Schmidt      Problems/SolutionsWater leak in Magnet PSWednesday, October 23, 2019, 09:50:
Fault: 12797 
WP: C2019-10-23-2
  
  484   Wednesday, January 06, 2016, 09:28 Anders Mjos      Problems/SolutionsWater leak fixed on flow sensor for HS circuit The Swagelok fitting on the return
side of the flow sensor for the HS circuit
was tightened to stop the leak. See e-fault 
  
  290   Tuesday, April 02, 2013, 15:19 Anders Mjos      Problems/SolutionsWater leak at MB1 Power SupplySee
Cyclotron e-fault 6637
 
  
  291   Tuesday, April 09, 2013, 16:21 Anders Mjos      Problems/SolutionsWater leak at MB1 Power Supply 

    
  