Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand, Page 53 of 53  Not logged in ELOG logo
Entry  Wednesday, April 24, 2024, 16:21, Dave Neilson, , LP-SIS, , , 44691-8, 45235-26, ,  

 Wednesday, April 24, 2024, 16:20:     Target assembly installed.

Wednesday, April 24, 2024, 16:20:  VV1 closed. Pumping down to rough vacuum 

Wednesday, April 24, 2024, 16:21:   Water cooling on. Seal on lines confirmed.

 Thursday, April 25, 2024, 09:14    TP1A and TP1B on

 Thursday, April 25, 2024, 15:45:   Vacuum seems to be stalled at 1e-5 T. Resetting turbo pumps has no noticeable effect. TP1B is emitting a soft high pitched tone / ringing. Now venting chamber to reset target assembly and water cooling seals.

 

Entry  Thursday, November 28, 2024, 13:47, Isaiah Rabuka, , , , , , , ,  

 November 28, 2024 1:46PM

Checked in on sample in ATTS.

Entry  Tuesday, December 03, 2024, 15:49, Isaiah Rabuka, , , , , , , ,  

  Tuesday, December 03, 2024, 15:48

Switched out pellets in ATTS, brought pressures down to ~10 uTorr, heated and cooled sample.

Entry  Wednesday, December 04, 2024, 15:43, Isaiah Rabuka, , , , , , , ,  

  Wednesday, December 04, 2024, 15:42 Depressurized the ATTS

Entry  Thursday, December 05, 2024, 14:06, Isaiah Rabuka, , , , , , , ,  

 Thursday, December 05, 2024, 14:05 Pressurized ATTS with argon, swapped out samples, and repressurized and heated chamber.

Entry  Friday, December 06, 2024, 16:03, Isaiah Rabuka, , , , , , , ,  

  Friday, December 06, 2024, 16:03 Heated and cooled a sample in the ATTS 3x

Entry  Tuesday, December 10, 2024, 14:38, Isaiah Rabuka, , , , , , , ,  

  Tuesday, December 10, 2024, 14:38 Depressurized ATTS using argon, switched out samples, and repressurized ATTS. Heated new sample to 1000 degrees Celsius.

 

ELOG V2.9.2-2455