Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand, Page 53 of 53  Not logged in ELOG logo
ID Date Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O# Status Subjectdown
  1032   Thursday, November 28, 2024, 13:47 Isaiah Rabuka        

 November 28, 2024 1:46PM

Checked in on sample in ATTS.

  1034   Tuesday, December 03, 2024, 15:49 Isaiah Rabuka        

  Tuesday, December 03, 2024, 15:48

Switched out pellets in ATTS, brought pressures down to ~10 uTorr, heated and cooled sample.

  1035   Wednesday, December 04, 2024, 15:43 Isaiah Rabuka        

  Wednesday, December 04, 2024, 15:42 Depressurized the ATTS

  1037   Thursday, December 05, 2024, 14:06 Isaiah Rabuka        

 Thursday, December 05, 2024, 14:05 Pressurized ATTS with argon, swapped out samples, and repressurized and heated chamber.

  1039   Friday, December 06, 2024, 16:03 Isaiah Rabuka        

  Friday, December 06, 2024, 16:03 Heated and cooled a sample in the ATTS 3x

  1040   Tuesday, December 10, 2024, 14:38 Isaiah Rabuka        

  Tuesday, December 10, 2024, 14:38 Depressurized ATTS using argon, switched out samples, and repressurized ATTS. Heated new sample to 1000 degrees Celsius.

 

ELOG V2.9.2-2455