ID |
Date |
Author |
Target/No.# |
Source |
Station |
Module |
Target Oven W.O# |
Heat Shield W.O# |
Status |
Subject |
1006
|
Wednesday, April 24, 2024, 16:21 |
Dave Neilson | | LP-SIS | | | 44691-8 | 45235-26 | | | Wednesday, April 24, 2024, 16:20: Target assembly installed.
Wednesday, April 24, 2024, 16:20: VV1 closed. Pumping down to rough vacuum
Wednesday, April 24, 2024, 16:21: Water cooling on. Seal on lines confirmed.
Thursday, April 25, 2024, 09:14 TP1A and TP1B on
Thursday, April 25, 2024, 15:45: Vacuum seems to be stalled at 1e-5 T. Resetting turbo pumps has no noticeable effect. TP1B is emitting a soft high pitched tone / ringing. Now venting chamber to reset target assembly and water cooling seals.
|
1032
|
Thursday, November 28, 2024, 13:47 |
Isaiah Rabuka | | | | | | | | | November 28, 2024 1:46PM
Checked in on sample in ATTS. |
1034
|
Tuesday, December 03, 2024, 15:49 |
Isaiah Rabuka | | | | | | | | | Tuesday, December 03, 2024, 15:48
Switched out pellets in ATTS, brought pressures down to ~10 uTorr, heated and cooled sample. |
1035
|
Wednesday, December 04, 2024, 15:43 |
Isaiah Rabuka | | | | | | | | | Wednesday, December 04, 2024, 15:42 Depressurized the ATTS |
1037
|
Thursday, December 05, 2024, 14:06 |
Isaiah Rabuka | | | | | | | | | Thursday, December 05, 2024, 14:05 Pressurized ATTS with argon, swapped out samples, and repressurized and heated chamber. |
1039
|
Friday, December 06, 2024, 16:03 |
Isaiah Rabuka | | | | | | | | | Friday, December 06, 2024, 16:03 Heated and cooled a sample in the ATTS 3x |
1040
|
Tuesday, December 10, 2024, 14:38 |
Isaiah Rabuka | | | | | | | | | Tuesday, December 10, 2024, 14:38 Depressurized ATTS using argon, switched out samples, and repressurized ATTS. Heated new sample to 1000 degrees Celsius.
|
|