  144   Thursday, July 12, 2012, 13:41 Anders Mjos      Donepurging gas lines with air
    gas lines purged with air for
60 min (through TSHUHV1 and TSHSV4).

   gas line allowed to fill with nitrogen
  
  143   Thursday, July 12, 2012, 12:23 Anders Mjos      DoneTSH:SV5 bypass onThursday, July 12, 2012, 15:48: bypass
removed
  
  142   Thursday, July 12, 2012, 09:44 Anders Mjos      In progressVentingSystem will be vented and gas lines purged
with air, then nitrogen.
Thursday, July 12, 2012, 09:43: Shut
  
  141   Thursday, July 12, 2012, 09:05 Anders Mjos      Problems/SolutionsShut down TSGTP1A - bearing noiseShut down TSGTP1A due to noise (possibly
from bearings) after consulting Edi.
  
  140   Wednesday, July 11, 2012, 15:30 Anders Mjos      Problems/SolutionsRestarting turbos after power bumpWednesday, July 11, 2012, 15:27: Started
TSGTP1A and 1B
Wednesday, July 11, 2012, 15:31:
  
  139   Wednesday, July 11, 2012, 11:16 Anders Mjos      In progressPumping down - with new turbo pump    
  138   Tuesday, July 10, 2012, 16:01 Anders Mjos      Problems/SolutionsTurbo replaced - cleaning chamber recommendedA new turbo has been
installed. Eddie said the other one had 
     crashed but not catastrophically. He
  
  137   Monday, July 09, 2012, 12:57 Anders Mjos      DoneVented    
  136   Monday, July 09, 2012, 11:14 Aurelia Laxdal       Test Stand statusRestarted the PC at the Test Stand.
Restarted the Archivers; currently
pumping down the separator area.
  
  135   Friday, July 06, 2012, 15:36 Friedhelm Ames      Doneswitched everything offswitched everything off to prepare for
scheduled power outage on Monday
  
  134   Friday, July 06, 2012, 11:18 Friedhelm Ames       TSG:TP1B off source off again.turbo pump TSG:TP1B has tripped off. Cannot
be restarted. Fault report to vacuum. Everything
switched off again
  
  133   Friday, July 06, 2012, 11:05 Friedhelm Ames       start source againheater ramping up again with Ne leak closed.   
  132   Friday, July 06, 2012, 11:04 Friedhelm Ames       source tripped off over nightA big vacuum excursion tripped the source
off at about 1am. The vacuum did not fully
recover afterwards only down to about 1.3e-6T.
  
  131   Thursday, July 05, 2012, 18:10 Friedhelm Ames      Problems/Solutionsfluctuations in magnet current

    

       
            
  
  130   Thursday, July 05, 2012, 18:02 Friedhelm Ames      Problems/Solutionsfluctuations in magnet currentThe current at the magnet power supply
TMS:MB1 shows fluctuations every 1-2 minutes.
The same can be seen in the Hall probe read
 TMSMB1_2012_07_05.PNG 
  129   Thursday, July 05, 2012, 11:00 Friedhelm Ames      In progresssource started up againtube heater ramping started   
  128   Thursday, July 05, 2012, 10:59 Friedhelm Ames      Problems/Solutionswater tripping in front of HV power suppliesFound some water tripping in front of the
high voltage power supplies rack from the
water lines at the ceiling. Plastic sheets
  
  127   Thursday, July 05, 2012, 08:41 Anders MjosFEBIAD anode end cap test     In progressWater opened - reduced flow heat shield

    

       
            
  
  126   Wednesday, July 04, 2012, 15:37 Anders MjosFEBIAD anode end cap test     In progressPumping down Replaced grid containing ring (target side)
with new ring. No contact between target
and anode measured in lab.
 photo_8.jpg 
  125   Wednesday, July 04, 2012, 15:33 Anders Mjos      Problems/Solutionsshort in anode

    

       
            
 photo_1.JPGphoto_3.JPG 