Entry  Monday, January 28, 2013, 14:41, Anders Mjos, Empty, , , , , , , Pumping down 

Monday, January 28, 2013, 14:41: Roughing

Monday, January 28, 2013, 15:35: Starting turbos

Monday, January 28, 2013, 15:43: Turbos at speed

Monday, January 28, 2013, 15:45: Vacuum at 3.9 E-6 T

Entry  Tuesday, May 21, 2013, 10:09, Rick Maharaj, , , , , , , , Test stand Vented 

Turbos stopped, waterlines flushed, chamber vented

Entry  Tuesday, May 21, 2013, 14:58, Rick Maharaj, CTL Febiad, , , , , , , CTL Febiad Installed 

Ceramic coated coil development target removed. CTL Febiad target installed.

Roughing chamber.

Entry  Tuesday, May 21, 2013, 15:14, Rick Maharaj, CTL Febiad, , , , , , , Turbos Started 

Turbos started

Entry  Tuesday, May 21, 2013, 15:50, Rick Maharaj, CTL Febiad, , , , , , , Cooling Water Turned On 

Cooling water turned on when vacuum reading 5.54e-06 T. Vacuum steadily increasing. Ion gauge reading steadily decreasing now reading 4.48e-06 T.

Entry  Friday, May 24, 2013, 15:13, Aurelia Laxdal, CLT FEBIAD, , , , , , , CLT FEBIAD conditioning started 

Purged the gas lines, turned on the HV and started the heaters for CLT FEBIAD: TGHT up to 580A and TBHT up to 230A.

Entry  Tuesday, July 16, 2013, 15:39, Anders Mjos, , , , , , , , Empty 

Tuesday, July 16, 2013, 15:39: Roughing

Tuesday, July 16, 2013, 16:01: Starting turbos.

Tuesday, July 16, 2013, 16:10: Turbos at speed.

Tuesday, July 16, 2013, 16:11: Vacuum at 6.9E-6 T

Entry  Friday, July 18, 2014, 08:19, Anders Mjos, , , , , , , , Venting 

Friday, July 18, 2014, 08:19: Stopped turbos

Friday, July 18, 2014, 10:58: Venting

Entry  Tuesday, December 23, 2014, 09:08, Anders Mjos, , , , , , , , Water closed for Christmas 

Shutting of water supply to the source box. Water not needed.

Entry  Wednesday, April 22, 2015, 13:17, Anders Mjos, , , , , , , , Source Tray Removed 

 by Mico, Dan and Anders

Entry  Thursday, June 25, 2015, 09:00, Anders Mjos, , LP-FEBIAD, , TM2, , , , TM2 FEBIAD Test 

Thursday, June 25, 2015, 09:00: Water on HS. No vacuum response.

Thursday, June 25, 2015, 11:48: Started auto ramping heaters.

Thursday, June 25, 2015, 17:14: Target at 580/275 A. BIAS/EZL/EE at 30 / 13.5 / 1.5 kV


Friday, June 26, 2015, 08:04: Stopped TP1B for outgasing measurements

Friday, June 26, 2015, 10:25: Performing outgasing measurements

Friday, June 26, 2015, 10:35: Starting TP1B.

Friday, June 26, 2015, 10:39: TP1B at speed.

Friday, June 26, 2015, 11:12: Started cool-down.

Friday, June 26, 2015, 11:47: BIAS/EZL/EE/COIL/ANODE off

Friday, June 26, 2015, 11:47: Closed IV4


Tuesday, June 30, 2015, 13:32: Venting

Entry  Monday, July 06, 2015, 14:26, Anders Mjos, , , , , , , , Pumping down empty chamber 

Monday, July 06, 2015, 14:26: Roughing


Wednesday, July 08, 2015, 09:26: Venting


Thursday, July 09, 2015, 11:42: Roughing

Thursday, July 09, 2015, 13:16: Turbos started.


Friday, July 10, 2015, 08:54 : Stopped turbos

Friday, July 10, 2015, 11:29 : Venting

Friday, July 10, 2015, 16:56: Roughing

Entry  Wednesday, December 02, 2015, 15:30, Anders Mjos, , LP-SIS, , , , , , New centre block test 

New 2x 9-pin connector grounding tool with gripper installed.

Wednesday, December 02, 2015, 15:30: Roughing

Wednesday, December 02, 2015, 17:14: Starting turbos

Wednesday, December 02, 2015, 17:32: Turbos at speed.


Thursday, December 03, 2015, 14:51: Opened water supply for HS circuit. Vacuum stable at 2.3E-7 T. No response on RGA


Monday, December 07, 2015, 08:45: Auto-ramping TBHT to 100 A at 2A/min. RGA on. Vacuum at 1.7E-7 T

Monday, December 07, 2015, 09:55: IV4 opened.


Target at TGHT / TBHT 100 A / 200 A over night.

Tuesday, December 08, 2015, 08:48: Ramping TGHT to 200 A at 4 A/min


Friday, December 11, 2015, 09:24: Ramping down target

Friday, December 11, 2015, 15:5: IV closed.


Tuesday, December 22, 2015, 15:11: RGA off

Entry  Monday, January 11, 2016, 09:02, Anders Mjos, , , , , , , , Venting 

Monday, January 11, 2016, 09:02: Turbos stopped.

Monday, January 11, 2016, 12:58: Venting


Roughed down yesterday due to change of plans.

Tuesday, January 12, 2016, 09:58: Turbos started.


Thursday, January 14, 2016, 11:44: Turbos stopped.

Entry  Tuesday, February 23, 2016, 10:43, Anders Mjos, SiC, LP-SIS, , , 41077-3, , , EE coating test - no Plasma Electrode 

Cleaned up EE and around target tube. Removed PE

Tuesday, February 23, 2016, 10:40: Roughing

Tuesday, February 23, 2016, 11:09: Starting turbos

Tuesday, February 23, 2016, 11:47: Turbos at speed. Vacuum at 7.5E-6 T

Tuesday, February 23, 2016, 13:43: EE to 1500 V. 518 uA

Tuesday, February 23, 2016, 15:07: RGA on


Wednesday, February 24, 2016, 08:48: Opened cooling water supply for HS circuit. Vacuum stable at 3.6E-7 T. No response on RGA

Wednesday, February 24, 2016, 08:51: IV4 opened

Wednesday, February 24, 2016, 08:56: BIAS/EZL/EE to 30 / 13 / 1.5 kV. Started auto-ramping to 420 / 220 A at 2 A/min.


Tuesday, March 01, 2016, 06:30: EE went into current limiting.

Tuesday, March 01, 2016, 08:30: Lowered EE voltage to 200 V

Tuesday, March 01, 2016, 09:41: Started cool down of target.

Tuesday, March 01, 2016, 09:50: RGA off

Tuesday, March 01, 2016, 13:27: BIAS / EZL / EE off. Stopped turbo pumps


Wednesday, March 02, 2016, 08:20: Venting

Entry  Tuesday, March 29, 2016, 14:44, Aaron Schmidt, , , , , , , , Pumping down empty chamber. 

Tuesday, March 29, 2016, 14:43: Roughing.


 Wednesday, March 30, 2016, 14:33: Venting   -AM

Entry  Wednesday, April 13, 2016, 13:03, Aaron Schmidt, , LP-SIS, , , 41790-2, 39956-8, , Testing restraint insulator prototype (2) Anode_Voltage_and_EE_(neg_bias).xlsxAnode_Voltage_and_EE_(pos_bias).xlsxRP#1_(2).docx

Wednesday, April 13, 2016, 13:03: Begin roughing. (Plasma electrode in. Salts in)

Wednesday, April 13, 2016, 13:34: Turbo pumps started.

Wednesday, April 13, 2016, 13:39: Ion Gauge on.


Thursday, April 14, 2016, 08:13: Open water to heat shield. Vacuum stable at 3.3E-7T.

Thursday, April 14, 2016, 08:19: Isolation valve opened. Auto ramping TGHT/TBHT to 300A/200A @ 2A/min.

Thursday, April 14, 2016, 08:33: Turned on optics. BIAS/EZL/EE to 30/13/1.5kV.

Thursday, April 14, 2016, 15:20: Ramping down TGHT from 300A to 250A @ 2A/min.


Friday, April 15, 2016, 8:23:  Slow ramping TGHT to 300A/ @ 1/2A/min.

Friday, April 15, 2016, 10:30: Begin ramping down TGHT/TBHT. @3A/2A per min.

Friday, April 15, 2016, 12:54: Sources off.

Friday, April 15, 2016, 13:09 :Water lines purged & power down.


Monday, April 18, 2016, 08:23: Opened water. Auto ramping TGHT/TBHT to 300A/200A @ 3A/2A per min. BIAS/EZL/EE to 30/13/1.5kV

Monday, April 18, 2016, 09:58: Ramping TBHT to 230A @ 2A/min

Monday, April 18, 2016, 12:54: Sources off. Ramping down @ 2A/min.


Tuesday, April 19, 2016, 09:37 : BIAS and EE off - AM

Tuesday, April 19, 2016, 15:30: Water, Ion gauge and Turbos off. 


Thursday, April 21, 2016, 13:41: Venting - AM

Entry  Monday, May 02, 2016, 16:03, Aaron Schmidt, SiC, LP-SIS, , , 41077-3, , , EE new insulator Test TS-2016-05-02_EE_insulator_test.rga

Monday, May 02, 2016, 16:01: Roughing.

Monday, May 02, 2016, 16:35: Turbos started -AM

 Monday, May 02, 2016, 16:43: Turbos at speed. Vacuum at 1.6E-5 T - AM


Tuesday, May 03, 2016, 08:15: Opened water  supply for heat shield. Vacuum stable at 2.5E-7 T. No response on RGA.

Tuesday, May 03, 2016, 08:33: Sources on

Tuesday, May 03, 2016, 08:37: Auto ramping TGHT/TBHT to 420A/220A @ 2A/min

Tuesday, May 03, 2016, 08:44: Sources off Except TGHT/TBHT

Tuesday, May 03, 2016, 08:47:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP  28.9 3.99
 TBHT  29.6 3.24
 COIL + EE  28.5 5.15
 TGHT  28.7 5.77

 Tuesday, May 03, 2016, 12:42:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 33.5 4.06
 TBHT  29.6 3.17
 COIL + EE  28.7 5.16
 TGHT  29.8 5.78

Tuesday, May 03, 2016, 15:29;

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 33.7 4.02
 TBHT  30.4 3.26
 COIL + EE  29.0 5.16
 TGHT 30.0

5.77

 


Wednesday, May 04, 2016, 08:00:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 33.5 3.99
 TBHT  29.5 3.22
 COIL + EE  28.7 5.16
 TGHT 29.6

5.74

Wednesday, May 04, 2016, 12:53:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 33.5 4.06
 TBHT  29.6

3.19

 COIL + EE  28.7 5.19
 TGHT 29.6

5.72

Wednesday, May 04, 2016, 14:56: TSHWSW-1: 8 Psi , Gauge below: 106 Psi

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 33.5 4.02
 TBHT  29.8

3.19

 COIL + EE  28.8 5.21
 TGHT 29.8

5.80

 Wednesday, May 04, 2016, 15:01: Begin auto-cooling @ 2A/min.


Thursday, May 05, 2016, 08:33: TBHT/TGHT off. Ion gauge off. Turbo pumps off.


Friday, May 06, 2016, 08:10: Water lines purged. Power supply off. Venting.

Entry  Friday, May 06, 2016, 10:18, Aaron Schmidt, SiC, LP-SIS, , , 41077-3, , , EE new insulator Test (2) No PE 

Friday, May 06, 2016, 10:18: Begin roughing

Venting: VCR on HS not closed

Friday, May 06, 2016, 12:58: Roughing

Friday, May 06, 2016, 13:22: Started turbos

Friday, May 06, 2016, 15:32: Vacuum at 1.2E-5 T


Monday, May 09, 2016, 09:07: Opened water  supply for heat shield. Vacuum stable at 2.78E-7 T.

Monday, May 09, 2016, 09:16:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP  28.9 4.06
 TBHT 30.8 3.33
 COIL + EE  28.5 5.24
 TGHT  28.7 5.80

Monday, May 09, 2016, 09:35: Auto ramping TGHT/TBHT to 420A/220A @ 2A/min.

Monday, May 09, 2016, 13:26:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 33.7 4.06
 TBHT 31.8

3.40

 COIL + EE  28.8 5.19
 TGHT  30.0 5.82

 


Tuesday, May 10, 2016, 08:18:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 33.7 4.06
 TBHT 30.3

3.27

 COIL + EE  28.8 5.19
 TGHT  29.8 5.77

Tuesday, May 10, 2016, 12:36:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 33.5 4.06
 TBHT 29.9

3.20

 COIL + EE  28.8 5.18
 TGHT  29.8 5.82

Tuesday, May 10, 2016, 15:21:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 33.7 4.02
 TBHT 29.4

3.15

 COIL + EE  28.8 5.16
 TGHT  30.0 5.73

 


Wednesday, May 11, 2016, 08:45:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 33.5 4.02
 TBHT 29.3

3.16

 COIL + EE  28.8 5.13
 TGHT  30.0 5.77

Wednesday, May 11, 2016, 14:13:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 33.8 4.06
 TBHT 29.6

3.16

 COIL + EE  29.0 5.19
 TGHT  30.0 5.78

 

Wednesday, May 11, 2016, 17:39: Ramping down TGHT/TBHT -AM


Thursday, May 12, 2016, 08:04: Ion gauge off. Turbo pumps off.

Thursday, May 12, 2016, 11:08: Water lines off/purged. Venting.

Thursday, May 12, 2016, 11:32: Source off, lock on.

Entry  Thursday, May 12, 2016, 13:32, Aaron Schmidt, SiC, LP-SIS, , , 41077-3, , , EE new insulator Test, No PE , Dirty EE. 

Thursday, May 12, 2016, 13:00: Begin Roughing.

Thursday, May 12, 2016, 13:40: Turbo Pumps started

Thursday, May 12, 2016, 13:46: Ion gauge switched on.


Friday, May 13, 2016, 08:33: Opened water  supply for heat shield. Vacuum stable at 3.70E-7 T.

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP  28.9 4.06
 TBHT 29.0 3.20
 COIL + EE  28.5 5.24
 TGHT  28.5 5.72

Friday, May 13, 2016, 10:01: Auto ramping TGHT/TBHT to 420A/220A @ 2A/min.

Friday, May 13, 2016, 13:55

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP  33.7 3.95
 TBHT 29.8 3.16
 COIL + EE  29.0 5.17
 TGHT  30.0 5.72

 


Monday, May 16, 2016, 11:29:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP  33.7 4.06
 TBHT 29.4 3.18
 COIL + EE  28.7 5.18
 TGHT  29.8 5.77

Monday, May 16, 2016, 15:59:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP  33.8 4.02
 TBHT 29.9 3.20
 COIL + EE  29.1 5.21
 TGHT  30.1 5.77

Note: RGA misread.


Tuesday, May 17, 2016, 15:15:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP  33.8 4.02
 TBHT 30.6 3.29
 COIL + EE  29.0 5.16
 TGHT  30.1 5.74

Note: RGA Misread.


Wednesday, May 18, 2016, 14:30: IV4 open. FC0 open

Wednesday, May 18, 2016, 14:58: FC0 closed.

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP  33.8 4.02
 TBHT 29.3 3.15
 COIL + EE  29.0 5.14
 TGHT  30.0 5.72

 


Thursday, May 19, 2016, 16:26:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP  33.8 4.06
 TBHT 29.3 3.15
 COIL + EE  28.8 5.17
 TGHT  30.0 5.77

 


Friday, May 20, 2016, 14:59:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP  33.8 4.02
 TBHT 29.6 3.20
 COIL + EE  28.8 5.14
 TGHT  30.0 5.79

 


Tuesday, May 24, 2016, 15:31:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP  33.8 4.02
 TBHT 29.9 3.18
 COIL + EE  29.0 5.15
 TGHT  30.1 5.72

 


Thursday, May 26, 2016, 15:18:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP  34.0 4.02
 TBHT 30.6 3.28
 COIL + EE  29.0 5.14
 TGHT  30.0 5.75

 


Friday, May 27, 2016, 15:27: IV4 Closed

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP  33.8 4.02
 TBHT 32.2 3.42
 COIL + EE  28.7 5.22
 TGHT  29.7 5.77

 


Monday, May 30, 2016, 08:35:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP  33.8 4.05
 TBHT 29.9 3.25
 COIL + EE  28.7 5.18
 TGHT  29.7 5.78

Monday, May 30, 2016, 08:54: Auto ramp down TGHT/TBHT @ 2A/1A per min to 0A.


Tuesday, May 31, 2016, 08:25: Ion gauge off. Turbo pumps off.


Wednesday, June 01, 2016, 09:10: Venting

Wednesday, June 01, 2016, 9:45: Water lines purged, power off.