Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand, Page 41 of 49  Not logged in ELOG logo
Entry  Thursday, September 13, 2012, 08:24, Anders Mjos, Nb#7, LP-SIS, ITW, TM1, , , In progress, Water on 
Thursday, September 13, 2012, 08:16: Opened up cooling water. Vacuum (IG1) increased from 5.9E-7 to 6.2E-7 before returning to 5.9E-7. Similar response
on IG6 (valve closed). Response is however similar to previous (short time ~5 min) vacuum fluctuations.
Entry  Wednesday, September 12, 2012, 17:04, Anders Mjos, Nb#7, LP-SIS, ITW, TM1, , , In progress, Pumping down - w/replaced insulators 
Replaced swollen insulator and added Ta heat shield on insulator.
 
Wednesday, September 12, 2012, 17:03: Roughing
Entry  Wednesday, September 12, 2012, 08:02, Anders Mjos, Nb#7, LP-SIS, ITW, TM1, , , In progress, Venting 
Wednesday, September 12, 2012, 08:01: Turbos off
Wednesday, September 12, 2012, 13:35: Venting, water off and purged.
Wednesday, September 12, 2012, 13:55: Vented
Entry  Tuesday, September 11, 2012, 19:48, Friedhelm Ames, NB#7, HP-SIS, , , , , Done, cool down finished, all source power supplies off. 
 
Entry  Tuesday, September 11, 2012, 13:13, Friedhelm Ames, Nb#7, LP-SIS, , , , , In progress, start cool down 
start cooldown. Found computer at teststand off. Somebody tried to login with username ARIEL.
Entry  Friday, September 07, 2012, 14:34, Anders Mjos, Nb#7, LP-SIS, ITW, TM1, , , Problems/Solutions, Insulator ITD0342 overheated - swelling Nb#7_swelling_insulator.pdf
 See attached photo
Entry  Friday, September 07, 2012, 13:10, Friedhelm Ames, Nb#7, , , , , , Done, mass scan finished 
mass scan is finished saved as 
 
  Normal
  0
  
  

 
  
  false
  false

 false
  
  EN-US
  X-NONE
Entry  Friday, September 07, 2012, 12:11, Friedhelm Ames, NB#7, LP-SIS, , , , , In progress, mass scan started 
mass scan has been started after optimization on 23Na
Entry  Thursday, September 06, 2012, 09:23, Friedhelm Ames, NB#7, , , , , , ,  
start high voltage and heaters
Entry  Friday, August 31, 2012, 13:59, Anders Mjos, Nb#7, LP-SIS, ITW, TM1, , , In progress, Nb#7 installed 
Friday, August 31, 2012, 15:19: roughing
Friday, August 31, 2012, 15:39 : starting turbos
Friday, August 31, 2012, 15:44 : TP1B at speed
    Reply  Tuesday, September 04, 2012, 08:11, Anders Mjos, Nb#7, LP-SIS, ITW, TM1, , , Done, Nb#7 installed 


    
        
            Anders Mjos wrote:
        
        
            
            Friday, August 31, 2012, 15:19: roughing
Entry  Friday, August 31, 2012, 11:39, Anders Mjos, NiO#1, HP-FEBIAD, ITE, TM4, , , Done, Venting vacuum chamber - source change 
Friday, August 31, 2012, 11:39: Stopped turbos.
Friday, August 31, 2012, 13:06: Venting.
Friday, August 31, 2012, 13:23: Water lines purged.
Entry  Friday, August 31, 2012, 11:12, Aurelia Laxdal, , HP-FEBIAD, ITE, TM4, , , Done, Finished testing NiO#1 
Turned off the HV and the optics in the first section. Couldn't turn off the optics in the second section: left a message for Evgeniy.
Also TMS:RP2 is very noisy. Talked to Edi D. from vacuum group. He would work on it this afternoon. E-Fault#6282
Entry  Thursday, August 23, 2012, 10:40, Anders Mjos, , , , , , , Problems/Solutions, Replaced TMSRP2 
Thursday, August 23, 2012, 10:40: Replacing TMSRP2 with Edi. E-fault 6261.
Thursday, August 23, 2012, 10:49: TMSRP2 replaced and started.
    Reply  Friday, August 31, 2012, 10:19, Anders Mjos, , , , , , , Problems/Solutions, Replaced TMSRP2 (again) 


    
        
            Anders Mjos wrote:
        
        
            
            Thursday, August 23, 2012, 10:40: Replacing TMSRP2 with Edi. E-fault 6261.
Entry  Thursday, August 30, 2012, 16:51, Aurelia Laxdal, , HP-FEBIAD, ITE, TM4, , , In progress, NiO#1 cooldown started 
Started the cooldown.
Entry  Thursday, August 30, 2012, 14:34, Aurelia Laxdal, , HP-FEBIAD, ITE, TM4, , , In progress, NiO#1 updates 


Normal
0




false
false
false

EN-US
X-NONE
X-NONE

Entry  Wednesday, August 29, 2012, 11:34, Aurelia Laxdal, , HP-FEBIAD, ITE, TM4, , , In progress, NiO#1 heating startup & few checks 
Friedhelm checked the voltage across R4 from ISK4563D-rev2.pdf. It shows 50 kOhms with the power supplies off and everything connected according to the
drawing. With the Anode PS On and set at 20V, we could see the same readback on EPICS and on the meter.
Then started the heater ramping: auto ramp 2A/min.
Entry  Tuesday, August 28, 2012, 16:57, Aurelia Laxdal, , HP-FEBIAD, ITE, TM4, , , In progress, Updates for NiO#1 at Test Stand 
Tested the power supplies and locked up the HV cage.
Turned on the HV: 30kV.
Tomorrow we'll start up the heaters: 580A for the target and 280-300A for the tube.
Entry  Monday, August 27, 2012, 15:21, Aurelia Laxdal, , , , , , , In progress, Xantrex PS 10-600 for TSH:TGHT is not working  
When turned ON it was not going higher than 3.6A (EPICS/front panel).  Kazuya checked the connections at the back and also the EPICS/PLC/PS  input/output
signals. He compared these values with the similar once of  the TSH:TBHT PS  (which is also a Xantrex PS 10-600). E-Fault 6275
It turned out to be the connections on the top of the ion source box: the target heater was not connected and the power supply was not seeing the
Entry  Monday, August 27, 2012, 13:21, Aurelia Laxdal, NiO#1, HP-FEBIAD, ITE, TM4, , , In progress, HV conditioning at Test Stand  
Did HV conditioning up to TSG:BIAS=30kV, TSH=EE=-600V
Turned off the HV for Kazuya to check the connection/output of the TSG:TGHT Xantrex power supply.
Entry  Thursday, August 23, 2012, 11:39, Anders Mjos, NiO#1, HP-FEBIAD, ITE, TM4, , , In progress, NiO#1 installed 
Thursday, August 23, 2012, 11:38: NiO#1 installed.
Thursday, August 23, 2012, 11:38: Started roughing. Both roughing pumps timed out.
Thursday, August 23, 2012, 11:54: Roughing.
    Reply  Friday, August 24, 2012, 08:28, Anders Mjos, NiO#1, HP-FEBIAD, ITE, TM4, , , Done, NiO#1 installed 


    
        
            Anders Mjos wrote:
        
        
            
            Thursday, August 23, 2012, 11:38: NiO#1 installed.
ELOG V2.9.2-2455