|
ID |
Date |
Author |
Target/No.# |
Source |
Station |
Module |
Target Oven W.O# |
Heat Shield W.O# |
Status |
Subject |
Text |
|
|
424
|
Tuesday, February 03, 2015, 09:40 |
Anders Mjos | | | | | | | Problems/Solutions | RGA installation | Tuesday, February 03, 2015, 09:40: Venting
RGA installed on the 12" CF
port below the Source Tray. |
|
|
423
|
Wednesday, January 28, 2015, 10:40 |
Anders Mjos | | | | | | | Problems/Solutions | Test Stand shut down for site wide power outage today | Friday, January 30, 2015, 10:50: Optics
section accidentally vented during work on
the ER |
|
|
422
|
Wednesday, January 21, 2015, 13:40 |
Anders Mjos | | | | | | | In progress | HV BIAS Test | Wednesday, January 21, 2015, 13:34: Opened
water flow.
Wednesday, January 21, 2015, 13:42: |
|
|
421
|
Tuesday, January 20, 2015, 14:31 |
Anders Mjos | | | | | | | Problems/Solutions | Ne leak disconnected for recallibration | SN 11-231 from VIC |
|
|
420
|
Monday, January 05, 2015, 09:20 |
Anders Mjos | | | | | | | Problems/Solutions | IV4 did not get close signal before the Hollidays | The valve closes physically, but does not
receive the closed signal.
Cycled the valve multiple times before |
|
|
419
|
Monday, January 05, 2015, 09:06 |
Anders Mjos | | | | | | | Problems/Solutions | TSG:TP1A found to be timed out after the Hollidays | Vacuum at 1.7E-7 T
Corrected title from off to timed
out . It seems the controller lost contact |
|
|
418
|
Tuesday, December 23, 2014, 09:08 |
Anders Mjos | | | | | | | | Water closed for Christmas | Shutting of water supply to the source
box. Water not needed. |
|
|
417
|
Monday, December 22, 2014, 11:06 |
Anders Mjos | | | | | | | Problems/Solutions | Copper rod removed | A copper rod - not used was removed from
one of the cooling lines. |
|
|
416
|
Thursday, December 18, 2014, 16:38 |
Anders Mjos | | | | | | | Problems/Solutions | Leak found on service cap F/T Q 9 pin connector | Largest response on the bottom of the insulator.
Thursday, December 18, 2014, 16:39:
Closing pumping valves. Will allow system |
|
|
415
|
Thursday, December 18, 2014, 14:34 |
Anders Mjos | | | | | | | Problems/Solutions | GE cooling water lines disconnected | In preparation for leak check
Thursday, December 18, 2014, 16:37:
Reconnected after leak check |
|
|
414
|
Tuesday, December 16, 2014, 10:18 |
Anders Mjos | | | | | | | Problems/Solutions | TP1B and TP6 stopped/fault | possibly due to HV spark
Tuesday, December 16, 2014, 10:24:
Starting TP1B and TP6 |
|
|
413
|
Friday, December 12, 2014, 14:09 |
Anders Mjos | | LP-FEBIAD | | | Tube only | | In progress | HV BIAS Test | BIAS current limit pot changed from 2.40
to 0.25
EZL current limit pot changed from |
|
|
412
|
Friday, December 12, 2014, 13:11 |
Anders Mjos | | | | | | | Problems/Solutions | HV inspection and cleaning | by Ray D and Anders in preparation for
60kV test. Rack insulators and f/t insulators
cleaned with windex |
|
|
411
|
Friday, December 12, 2014, 13:11 |
Anders Mjos | | | | | | | Problems/Solutions | HV inspection and cleaning | by Ray D and Anders in preparation for
60kV test. Rack insulators and f/t insulators
cleaned with windex |
|
|
410
|
Monday, November 24, 2014, 08:41 |
Anders Mjos | | | | | | | Problems/Solutions | TSG:RP1 replaced | by Edi on Friday Nov 11th |
|
|
409
|
Monday, November 03, 2014, 14:50 |
Anders Mjos | | | | | | | Problems/Solutions | IV4 did not close until 4th attempt | Indicated with red valve on the EPICS vacuum
page |
|
|
408
|
Friday, October 31, 2014, 14:57 |
Anders Mjos | | LP-FEBIAD | | | Tube only | 38307-9 | In progress | Test | Friday, October 31, 2014, 14:47: Starting
turbos
Friday, October 31, 2014, 14:57: |
|
|
407
|
Monday, October 27, 2014, 09:26 |
Anders Mjos | | | | | | | Problems/Solutions | TSG:TP1B noisy | e-fault 7748
Monday, October 27, 2014, 09:21:
Switched off turbos |
|
|
406
|
Monday, October 20, 2014, 09:17 |
Anders Mjos | | | | | | | Problems/Solutions | Power bump this weekend tripped off all turbo pumps | Monday, October 20, 2014, 09:17:
Roughing
Monday, October 20, 2014, 09:18 : |
|
|
405
|
Tuesday, October 07, 2014, 09:32 |
Anders Mjos | | | | | | | In progress | Pumping down empty chamber | Tuesday, October 07, 2014, 09:30: Roughing
Tuesday, October 07, 2014, 10:24:
Starting turbos |
|