Entry  Wednesday, June 12, 2013, 20:38, Friedhelm Ames, , , , , , , Problems/Solutions, target heater power supply removed 

The target heater power supply at the teststand has been removed to replace one in ITE.

Entry  Monday, February 27, 2012, 17:39, Friedhelm Ames, , , , , , , In progress, target and tube heaters ramped up 

ramping up target to 300 A and tube to 270 A

Entry  Friday, July 06, 2012, 15:36, Friedhelm Ames, , , , , , , Done, switched everything off 

switched everything off to prepare for scheduled power outage on Monday

Entry  Friday, January 18, 2013, 11:28, Sebastian Raeder, RFQ empty, , , , , , , stop turbos 

Friday, January 18, 2013, 11:28: turbos stopped

Entry  Wednesday, December 19, 2012, 16:22, Sebastian Raeder, , , , , , , Problems/Solutions, status after power outage 

Wednesday, December 19, 2012, 16:24:

After long power outage, everything is off except the roughing pumps. Two turbo pumps (TMSTP2 and TSGTP1B) have shown fault due to timeout, only TSGTP1B could be reset, while TMSTP2 is still showing this fault

Vacuum in Magnet section is 0.004T according to TMSCG2. Since the target chamber was vented to remove the RFQ tests target, this section is actually pumped down using the roughing pumps (water lines are blanked off)

archivers started

Wednesday, December 19, 2012, 21:43

I was now able to reset TMSTP2.

closed the roughing pumps to the target chamber, vacuum at 0.027T

Entry  Tuesday, July 03, 2012, 09:23, Friedhelm Ames, , , , , , , In progress, start up again 

purged Ne line and started cathode heater ramp up to 295 A

Entry  Friday, July 06, 2012, 11:05, Friedhelm Ames, , , , , , , , start source again 

heater ramping up again with Ne leak closed.

Entry  Thursday, March 01, 2012, 17:10, Friedhelm Ames, , , , , , , , start ramping down of heaters 
 
Entry  Friday, June 29, 2012, 15:03, Friedhelm Ames, , , , , , , , start ramping down heater 
 
Entry  Friday, June 29, 2012, 13:39, Friedhelm Ames, , , , , , , , start mass scan 

start mass scan to do new mass calibration

Entry  Thursday, March 01, 2012, 17:05, Friedhelm Ames, , , , , , , , start heater ramping down 
 
Entry  Tuesday, September 11, 2012, 13:13, Friedhelm Ames, Nb#7, LP-SIS, , , , , In progress, start cool down 

start cooldown. Found computer at teststand off. Somebody tried to login with username ARIEL.

Entry  Friday, July 06, 2012, 11:04, Friedhelm Ames, , , , , , , , source tripped off over night 

A big vacuum excursion tripped the source off at about 1am. The vacuum did not fully recover afterwards only down to about 1.3e-6T. Ne leak has been closed and vacuum went down to 6e-7T within a few minutes. After the trip the current of the magnet stayed constant. Fluctuations may have been caused by high voltage sparks.

Entry  Thursday, July 05, 2012, 11:00, Friedhelm Ames, , , , , , , In progress, source started up again 

tube heater ramping started

Entry  Tuesday, July 03, 2012, 19:05, Friedhelm Ames, , , , , , , Problems/Solutions, short in anode 

A short in the anode has developed during the heater ramp up. Increasing the current limit did not cure it. Start heater ramp down to investigate.

    Reply  Wednesday, July 04, 2012, 15:33, Anders Mjos, , , , , , , Problems/Solutions, short in anode photo_1.JPGphoto_3.JPG

Friedhelm Ames wrote:

A short in the anode has developed during the heater ramp up. Increasing the current limit did not cure it. Start heater ramp down to investigate.

 Wednesday, July 04, 2012: short found between anode and target. probably caused by the target tube coming in contact with the anode due to bending of the tube caused by heating and deformation of the grid retaining ring. see attachements

Entry  Friday, March 09, 2012, 10:56, Friedhelm Ames, Nb#6, , , , , , , scan finished Nb6_mass_spectrum.docx

mass scan is finished and saved see attached.

Entry  Wednesday, March 12, 2014, 10:20, Rick Maharaj, , , , , , , Done, replace heatshield waterline loop 

A new Heatshield waterline loop was manufactured and installed to replace the old one which had a leak.

Chamber vacuum currently being roughed down.

Wednesday, March 12, 2014, 10:41: Started turbos.

Wednesday, March 12, 2014, 10:5:0 Turbos at speed. TP1A timed out once.

Wednesday, March 12, 2014, 10:51: Vacuum at 2.6E-5 T.  


By AM

Thursday, March 13, 2014, 10:20: Opened water. Vacuum stable at 9.3E-7 T.

Venting chamber to investigate slow pump down.

Thursday, March 13, 2014, 10:21: Stopped turbos.

Thursday, March 13, 2014, 11:15: Venting

 

By RM

HS loop wiped with methanol, door seals wiped.

Thursday, March 13, 2014, 11:47: Pump down Started

Thursday, March 13, 2014, 12:05: Turbos started

Thursday, March 13, 2014, 12:09: TP1B at speed

Thursday, March 13, 2014, 12:12: TP1A at speed

Thursday, March 13, 2014, 12:13: IG1 turned on Vacuum at 7.2E-06


By AM

Monday, March 17, 2014, 12:55 : Stopped turbos. Vacuum at 2.4E-7 T. 

Monday, March 17, 2014, 17:39: Venting

 

    Reply  Thursday, April 26, 2012, 09:14, Anders Mjos, , , , , , , , removed Al(CH3)3 

Friedhelm Ames wrote:

connected A(CH3)3 instead of He, pumped line and valve with pump on the high voltage rack.. Opened regulating valve first response at mass 27 with valve set point at 7.0.

 The bottle with Al(CH3)3 was removed from the test stand yesterday April 25.

comments in e-mail from Marik:

Anders & I took the Al(CH3)3 bottle out of the test stand & put it in the middle fume hood of lab 07.  There was some puffs of white "smoke" when Anders unscrewed the VCR coupling.  Likely some trapped liquid that oxidized on air exposure.  If at all possible, I would suggest a vertical orientation in the Faraday cage.

-Marik 

Entry  Wednesday, March 07, 2012, 17:44, Friedhelm Ames, Nb#6, , , , , , , ramping up heaters 

ramping up heaters has been started by ISAC ops.