314
|
Wednesday, June 12, 2013, 20:38 |
Friedhelm Ames | | | | | | | Problems/Solutions | target heater power supply removed | The target heater power supply at the teststand
has been removed to replace one in ITE. |
|
|
35
|
Monday, February 27, 2012, 17:39 |
Friedhelm Ames | | | | | | | In progress | target and tube heaters ramped up | ramping up target to 300 A and tube to
270 A |
|
|
135
|
Friday, July 06, 2012, 15:36 |
Friedhelm Ames | | | | | | | Done | switched everything off | switched everything off to prepare for
scheduled power outage on Monday |
|
|
273
|
Friday, January 18, 2013, 11:28 |
Sebastian Raeder | RFQ empty | | | | | | | stop turbos | Friday, January 18, 2013, 11:28: turbos
stopped |
|
|
256
|
Wednesday, December 19, 2012, 16:22 |
Sebastian Raeder | | | | | | | Problems/Solutions | status after power outage | Wednesday, December 19, 2012, 16:24:
After long power outage, everything
is off except the roughing pumps. Two turbo |
|
|
121
|
Tuesday, July 03, 2012, 09:23 |
Friedhelm Ames | | | | | | | In progress | start up again | purged Ne line and started cathode heater
ramp up to 295 A |
|
|
133
|
Friday, July 06, 2012, 11:05 |
Friedhelm Ames | | | | | | | | start source again | heater ramping up again with Ne leak closed. |
|
|
48
|
Thursday, March 01, 2012, 17:10 |
Friedhelm Ames | | | | | | | | start ramping down of heaters | |
|
|
119
|
Friday, June 29, 2012, 15:03 |
Friedhelm Ames | | | | | | | | start ramping down heater | |
|
|
117
|
Friday, June 29, 2012, 13:39 |
Friedhelm Ames | | | | | | | | start mass scan | start mass scan to do new mass calibration |
|
|
46
|
Thursday, March 01, 2012, 17:05 |
Friedhelm Ames | | | | | | | | start heater ramping down | |
|
|
198
|
Tuesday, September 11, 2012, 13:13 |
Friedhelm Ames | Nb#7 | LP-SIS | | | | | In progress | start cool down | start cooldown. Found computer at teststand
off. Somebody tried to login with username
ARIEL. |
|
|
132
|
Friday, July 06, 2012, 11:04 |
Friedhelm Ames | | | | | | | | source tripped off over night | A big vacuum excursion tripped the source
off at about 1am. The vacuum did not fully
recover afterwards only down to about 1.3e-6T. |
|
|
129
|
Thursday, July 05, 2012, 11:00 |
Friedhelm Ames | | | | | | | In progress | source started up again | tube heater ramping started |
|
|
122
|
Tuesday, July 03, 2012, 19:05 |
Friedhelm Ames | | | | | | | Problems/Solutions | short in anode | A short in the anode has developed during
the heater ramp up. Increasing the current
limit did not cure it. Start heater ramp |
|
|
125
|
Wednesday, July 04, 2012, 15:33 |
Anders Mjos | | | | | | | Problems/Solutions | short in anode |
|
|
|
67
|
Friday, March 09, 2012, 10:56 |
Friedhelm Ames | Nb#6 | | | | | | | scan finished | mass scan is finished and saved see attached. |
|
|
363
|
Wednesday, March 12, 2014, 10:20 |
Rick Maharaj | | | | | | | Done | replace heatshield waterline loop | A new Heatshield waterline loop was manufactured
and installed to replace the old one which
had a leak. |
|
|
78
|
Thursday, April 26, 2012, 09:14 |
Anders Mjos | | | | | | | | removed Al(CH3)3 |
|
|
|
60
|
Wednesday, March 07, 2012, 17:44 |
Friedhelm Ames | Nb#6 | | | | | | | ramping up heaters | ramping up heaters has been started by