Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand, Page 2 of 53  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O# Status Subjectdown Text Attachments
  314   Wednesday, June 12, 2013, 20:38 Friedhelm Ames      Problems/Solutionstarget heater power supply removedThe target heater power supply at the teststand
has been removed to replace one in ITE.
  
  35   Monday, February 27, 2012, 17:39 Friedhelm Ames      In progresstarget and tube heaters ramped upramping up target to 300 A and tube to
270 A
  
  135   Friday, July 06, 2012, 15:36 Friedhelm Ames      Doneswitched everything offswitched everything off to prepare for
scheduled power outage on Monday
  
  273   Friday, January 18, 2013, 11:28 Sebastian RaederRFQ empty      stop turbosFriday, January 18, 2013, 11:28: turbos
stopped
  
  256   Wednesday, December 19, 2012, 16:22 Sebastian Raeder      Problems/Solutionsstatus after power outageWednesday, December 19, 2012, 16:24:
After long power outage, everything
is off except the roughing pumps. Two turbo
  
  121   Tuesday, July 03, 2012, 09:23 Friedhelm Ames      In progressstart up againpurged Ne line and started cathode heater
ramp up to 295 A
  
  133   Friday, July 06, 2012, 11:05 Friedhelm Ames       start source againheater ramping up again with Ne leak closed.   
  48   Thursday, March 01, 2012, 17:10 Friedhelm Ames       start ramping down of heaters    
  119   Friday, June 29, 2012, 15:03 Friedhelm Ames       start ramping down heater    
  117   Friday, June 29, 2012, 13:39 Friedhelm Ames       start mass scanstart mass scan to do new mass calibration   
  46   Thursday, March 01, 2012, 17:05 Friedhelm Ames       start heater ramping down    
  198   Tuesday, September 11, 2012, 13:13 Friedhelm AmesNb#7LP-SIS    In progressstart cool downstart cooldown. Found computer at teststand
off. Somebody tried to login with username
ARIEL.
  
  132   Friday, July 06, 2012, 11:04 Friedhelm Ames       source tripped off over nightA big vacuum excursion tripped the source
off at about 1am. The vacuum did not fully
recover afterwards only down to about 1.3e-6T.
  
  129   Thursday, July 05, 2012, 11:00 Friedhelm Ames      In progresssource started up againtube heater ramping started   
  122   Tuesday, July 03, 2012, 19:05 Friedhelm Ames      Problems/Solutionsshort in anodeA short in the anode has developed during
the heater ramp up. Increasing the current
limit did not cure it. Start heater ramp
  
  125   Wednesday, July 04, 2012, 15:33 Anders Mjos      Problems/Solutionsshort in anode

    

       
            
 photo_1.JPGphoto_3.JPG 
  67   Friday, March 09, 2012, 10:56 Friedhelm AmesNb#6      scan finishedmass scan is finished and saved see attached.  Nb6_mass_spectrum.docx 
  363   Wednesday, March 12, 2014, 10:20 Rick Maharaj      Donereplace heatshield waterline loopA new Heatshield waterline loop was manufactured
and installed to replace the old one which
had a leak.
  
  78   Thursday, April 26, 2012, 09:14 Anders Mjos       removed Al(CH3)3

    

       
            
  
  60   Wednesday, March 07, 2012, 17:44 Friedhelm AmesNb#6      ramping up heatersramping up heaters has been started by
ISAC ops.
  
ELOG V2.9.2-2455