  ID Date Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O# Status Subjectdown
  314   Wednesday, June 12, 2013, 20:38 Friedhelm Ames      Problems/Solutionstarget heater power supply removed

The target heater power supply at the teststand has been removed to replace one in ITE.

  35   Monday, February 27, 2012, 17:39 Friedhelm Ames      In progresstarget and tube heaters ramped up

ramping up target to 300 A and tube to 270 A

  135   Friday, July 06, 2012, 15:36 Friedhelm Ames      Doneswitched everything off

switched everything off to prepare for scheduled power outage on Monday

  273   Friday, January 18, 2013, 11:28 Sebastian RaederRFQ empty      stop turbos

Friday, January 18, 2013, 11:28: turbos stopped

  256   Wednesday, December 19, 2012, 16:22 Sebastian Raeder      Problems/Solutionsstatus after power outage

Wednesday, December 19, 2012, 16:24:

After long power outage, everything is off except the roughing pumps. Two turbo pumps (TMSTP2 and TSGTP1B) have shown fault due to timeout, only TSGTP1B could be reset, while TMSTP2 is still showing this fault

Vacuum in Magnet section is 0.004T according to TMSCG2. Since the target chamber was vented to remove the RFQ tests target, this section is actually pumped down using the roughing pumps (water lines are blanked off)

archivers started

Wednesday, December 19, 2012, 21:43

I was now able to reset TMSTP2.

closed the roughing pumps to the target chamber, vacuum at 0.027T

  121   Tuesday, July 03, 2012, 09:23 Friedhelm Ames      In progressstart up again

purged Ne line and started cathode heater ramp up to 295 A

  133   Friday, July 06, 2012, 11:05 Friedhelm Ames       start source again

heater ramping up again with Ne leak closed.

  48   Thursday, March 01, 2012, 17:10 Friedhelm Ames       start ramping down of heaters
  119   Friday, June 29, 2012, 15:03 Friedhelm Ames       start ramping down heater
  117   Friday, June 29, 2012, 13:39 Friedhelm Ames       start mass scan

start mass scan to do new mass calibration

  46   Thursday, March 01, 2012, 17:05 Friedhelm Ames       start heater ramping down
  198   Tuesday, September 11, 2012, 13:13 Friedhelm AmesNb#7LP-SIS    In progressstart cool down

start cooldown. Found computer at teststand off. Somebody tried to login with username ARIEL.

  132   Friday, July 06, 2012, 11:04 Friedhelm Ames       source tripped off over night

A big vacuum excursion tripped the source off at about 1am. The vacuum did not fully recover afterwards only down to about 1.3e-6T. Ne leak has been closed and vacuum went down to 6e-7T within a few minutes. After the trip the current of the magnet stayed constant. Fluctuations may have been caused by high voltage sparks.

  129   Thursday, July 05, 2012, 11:00 Friedhelm Ames      In progresssource started up again

tube heater ramping started

  122   Tuesday, July 03, 2012, 19:05 Friedhelm Ames      Problems/Solutionsshort in anode

A short in the anode has developed during the heater ramp up. Increasing the current limit did not cure it. Start heater ramp down to investigate.

  125   Wednesday, July 04, 2012, 15:33 Anders Mjos      Problems/Solutionsshort in anode

Friedhelm Ames wrote:

A short in the anode has developed during the heater ramp up. Increasing the current limit did not cure it. Start heater ramp down to investigate.

 Wednesday, July 04, 2012: short found between anode and target. probably caused by the target tube coming in contact with the anode due to bending of the tube caused by heating and deformation of the grid retaining ring. see attachements

Attachment 1: photo_1.JPG
photo_1.JPG
Attachment 2: photo_3.JPG
photo_3.JPG
  67   Friday, March 09, 2012, 10:56 Friedhelm AmesNb#6      scan finished

mass scan is finished and saved see attached.

Attachment 1: Nb6_mass_spectrum.docx
  363   Wednesday, March 12, 2014, 10:20 Rick Maharaj      Donereplace heatshield waterline loop

A new Heatshield waterline loop was manufactured and installed to replace the old one which had a leak.

Chamber vacuum currently being roughed down.

Wednesday, March 12, 2014, 10:41: Started turbos.

Wednesday, March 12, 2014, 10:5:0 Turbos at speed. TP1A timed out once.

Wednesday, March 12, 2014, 10:51: Vacuum at 2.6E-5 T.  


By AM

Thursday, March 13, 2014, 10:20: Opened water. Vacuum stable at 9.3E-7 T.

Venting chamber to investigate slow pump down.

Thursday, March 13, 2014, 10:21: Stopped turbos.

Thursday, March 13, 2014, 11:15: Venting

 

By RM

HS loop wiped with methanol, door seals wiped.

Thursday, March 13, 2014, 11:47: Pump down Started

Thursday, March 13, 2014, 12:05: Turbos started

Thursday, March 13, 2014, 12:09: TP1B at speed

Thursday, March 13, 2014, 12:12: TP1A at speed

Thursday, March 13, 2014, 12:13: IG1 turned on Vacuum at 7.2E-06


By AM

Monday, March 17, 2014, 12:55 : Stopped turbos. Vacuum at 2.4E-7 T. 

Monday, March 17, 2014, 17:39: Venting

 

  78   Thursday, April 26, 2012, 09:14 Anders Mjos       removed Al(CH3)3

Friedhelm Ames wrote:

connected A(CH3)3 instead of He, pumped line and valve with pump on the high voltage rack.. Opened regulating valve first response at mass 27 with valve set point at 7.0.

 The bottle with Al(CH3)3 was removed from the test stand yesterday April 25.

comments in e-mail from Marik:

Anders & I took the Al(CH3)3 bottle out of the test stand & put it in the middle fume hood of lab 07.  There was some puffs of white "smoke" when Anders unscrewed the VCR coupling.  Likely some trapped liquid that oxidized on air exposure.  If at all possible, I would suggest a vertical orientation in the Faraday cage.

-Marik 

  60   Wednesday, March 07, 2012, 17:44 Friedhelm AmesNb#6      ramping up heaters

ramping up heaters has been started by ISAC ops.