Wednesday, December 19, 2012, 16:24:
After long power outage, everything is off except the roughing pumps. Two turbo pumps (TMSTP2 and TSGTP1B) have shown fault due to timeout, only TSGTP1B could be reset, while TMSTP2 is still showing this fault
Vacuum in Magnet section is 0.004T according to TMSCG2. Since the target chamber was vented to remove the RFQ tests target, this section is actually pumped down using the roughing pumps (water lines are blanked off)
archivers started
Wednesday, December 19, 2012, 21:43
I was now able to reset TMSTP2.
closed the roughing pumps to the target chamber, vacuum at 0.027T |
A new Heatshield waterline loop was manufactured and installed to replace the old one which had a leak.
Chamber vacuum currently being roughed down.
Wednesday, March 12, 2014, 10:41: Started turbos.
Wednesday, March 12, 2014, 10:5:0 Turbos at speed. TP1A timed out once.
Wednesday, March 12, 2014, 10:51: Vacuum at 2.6E-5 T.
By AM
Thursday, March 13, 2014, 10:20: Opened water. Vacuum stable at 9.3E-7 T.
Venting chamber to investigate slow pump down.
Thursday, March 13, 2014, 10:21: Stopped turbos.
Thursday, March 13, 2014, 11:15: Venting
By RM
HS loop wiped with methanol, door seals wiped.
Thursday, March 13, 2014, 11:47: Pump down Started
Thursday, March 13, 2014, 12:05: Turbos started
Thursday, March 13, 2014, 12:09: TP1B at speed
Thursday, March 13, 2014, 12:12: TP1A at speed
Thursday, March 13, 2014, 12:13: IG1 turned on Vacuum at 7.2E-06
By AM
Monday, March 17, 2014, 12:55 : Stopped turbos. Vacuum at 2.4E-7 T.
Monday, March 17, 2014, 17:39: Venting
|