Entry  Wednesday, June 12, 2013, 20:38, Friedhelm Ames, , , , , , , Problems/Solutions, target heater power supply removed 
The target heater power supply at the teststand has been removed to replace one in ITE.
Entry  Monday, February 27, 2012, 17:39, Friedhelm Ames, , , , , , , In progress, target and tube heaters ramped up 
ramping up target to 300 A and tube to 270 A
Entry  Friday, July 06, 2012, 15:36, Friedhelm Ames, , , , , , , Done, switched everything off 
switched everything off to prepare for scheduled power outage on Monday
Entry  Friday, January 18, 2013, 11:28, Sebastian Raeder, RFQ empty, , , , , , , stop turbos 
Friday, January 18, 2013, 11:28: turbos stopped
Entry  Wednesday, December 19, 2012, 16:22, Sebastian Raeder, , , , , , , Problems/Solutions, status after power outage 
Wednesday, December 19, 2012, 16:24:
After long power outage, everything is off except the roughing pumps. Two turbo pumps (TMSTP2 and TSGTP1B) have shown fault due to timeout, only
TSGTP1B could be reset, while TMSTP2 is still showing this fault
Entry  Tuesday, July 03, 2012, 09:23, Friedhelm Ames, , , , , , , In progress, start up again 
purged Ne line and started cathode heater ramp up to 295 A
Entry  Friday, July 06, 2012, 11:05, Friedhelm Ames, , , , , , , , start source again 
heater ramping up again with Ne leak closed.
Entry  Thursday, March 01, 2012, 17:10, Friedhelm Ames, , , , , , , , start ramping down of heaters 
 
Entry  Friday, June 29, 2012, 15:03, Friedhelm Ames, , , , , , , , start ramping down heater 
 
Entry  Friday, June 29, 2012, 13:39, Friedhelm Ames, , , , , , , , start mass scan 
start mass scan to do new mass calibration
Entry  Thursday, March 01, 2012, 17:05, Friedhelm Ames, , , , , , , , start heater ramping down 
 
Entry  Tuesday, September 11, 2012, 13:13, Friedhelm Ames, Nb#7, LP-SIS, , , , , In progress, start cool down 
start cooldown. Found computer at teststand off. Somebody tried to login with username ARIEL.
Entry  Friday, July 06, 2012, 11:04, Friedhelm Ames, , , , , , , , source tripped off over night 
A big vacuum excursion tripped the source off at about 1am. The vacuum did not fully recover afterwards only down to about 1.3e-6T. Ne leak has been
closed and vacuum went down to 6e-7T within a few minutes. After the trip the current of the magnet stayed constant. Fluctuations may have been caused
by high voltage sparks.
Entry  Thursday, July 05, 2012, 11:00, Friedhelm Ames, , , , , , , In progress, source started up again 
tube heater ramping started
Entry  Tuesday, July 03, 2012, 19:05, Friedhelm Ames, , , , , , , Problems/Solutions, short in anode 
A short in the anode has developed during the heater ramp up. Increasing the current limit did not cure it. Start heater ramp down to investigate.
    Reply  Wednesday, July 04, 2012, 15:33, Anders Mjos, , , , , , , Problems/Solutions, short in anode photo_1.JPGphoto_3.JPG


    
        
            Friedhelm Ames wrote:
        
        
            
            A short in the anode has developed during the heater ramp up. Increasing the current limit did not cure it. Start heater
Entry  Friday, March 09, 2012, 10:56, Friedhelm Ames, Nb#6, , , , , , , scan finished Nb6_mass_spectrum.docx
mass scan is finished and saved see attached.
Entry  Wednesday, March 12, 2014, 10:20, Rick Maharaj, , , , , , , Done, replace heatshield waterline loop 
A new Heatshield waterline loop was manufactured and installed to replace the old one which had a leak.
Chamber vacuum currently being roughed down.
Wednesday, March 12, 2014, 10:41: Started turbos.
    Reply  Thursday, April 26, 2012, 09:14, Anders Mjos, , , , , , , , removed Al(CH3)3 


    
        
            Friedhelm Ames wrote:
        
        
            
            connected A(CH3)3 instead of He, pumped line and valve with pump on the high voltage rack.. Opened regulating
Entry  Wednesday, March 07, 2012, 17:44, Friedhelm Ames, Nb#6, , , , , , , ramping up heaters 
ramping up heaters has been started by ISAC ops.