Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand, Page 25 of 53  Not logged in ELOG logo
ID Date Author Target/No.# Source Station Module Target Oven W.O#down Heat Shield W.O# Status Subject
  249   Friday, December 14, 2012, 15:28 Anders MjosRFQ empty     In progressVenting

Sebastian Raeder wrote:

Friday, December 14, 2012, 14:24 Stop Turbopumps and prepare venting to insert RFQ target

Friday, December 14, 2012, 15:27 : Venting

  250   Friday, December 14, 2012, 20:34 Sebastian RaederRFQ empty     Donepumping down

Friday, December 14, 2012, ~ 17:00: start roughing pumps

Friday, December 14, 2012, 20:33: start turbo pumps

Friday, December 14, 2012, 20:42 : turbos at speed

Friday, December 14, 2012, 20:43 :  vacuum at 7.32E-6T

Monday, December 17, 2012, 12:53 vacuum at 1.77E-7T

  251   Monday, December 17, 2012, 22:35 Sebastian RaederRFQ empty      wire connection for RFQ test

Overview over the connections of the new 9Pin connector inside the vacuum and in the HV cage

1&2 : RFQ rods in the vacuum, RFQ Driver in HV cage

4: Repeller electrode, grounded in HV cage

5: Exit electrode , grounded in HV cage

6&7: thermocouple at the center block, w/o HV to OMEGA thermocouple display, with HV should be connected to GND with 1k-10kOhm (to allow a shift of the target)

8&9: not connected, grounded in HV cage

 

View on top of the feedthrough and the connector on the source tray (male connectors)

     __________________

    \    1     2      3      4      5   /

      \     6      7     8      9    /

          ----------------------  

1to1 connection for pins 1,2,4-9

Pin 3 is NOT CONNECTED

The pin pairs 1&2, 4&5, 6&7, 8&9 each use a line of twisted pairs

  252   Tuesday, December 18, 2012, 12:51 Sebastian Raeder       Anode powersupply connected to HV-common

The anode PS is turned off and connected to HV common.

the Target is connected to a -18V PS at the center support (Feed through A) for a on/off test of ion suppression

NOTE: there is a shortcut target <--> HV gnd, most propably due to the thermocouple touching something after pumping.

workaround to obtain suppression for today is to put in a differnt driver for the RFQ which can be biased to positive potential.

  253   Tuesday, December 18, 2012, 16:00 Sebastian RaederRFQ empty     Donetarget heating

Tuesday, December 18, 2012, ~ 13:00 start ramping the TGHT current, vacuum at 1.7E-7T

Tuesday, December 18, 2012, 15:56: @ 250A, target is glowing, center block is cooler (can be inspected with a new hole in the heatshield lid), thermocouple is reading 224C, which is definitely colder than the temp from visual insepection, reading may be corrupted from contact to Heatschield

Tuesday, December 18, 2012, 23:11: target at 600A(593A/7.35V Panel reading), vacuum was up to 1.7E-6T, now 1.34E-6T. temperature reading was 405C which is quite away from glowing. Nevertheless, the center block of the target is visibly colder than the legs, while the center support is still way colder then the block. Thermocouple readback removed from HV cage. since the is a short cut the target (thermocouple?) the RFQ can be biased to 18V for suppression. everything locked up and stat HV test.

Wednesday, December 19, 2012, 00:14: target at 600A(593A/7.35V Panel reading), vacuum at 8.5E-7T, first HV test done, up to 30kV some occasional sparks. RFQ (1MHz , 40Vpp) without bias--> no signal, RFQ -9V biased --> 1.5E-11 on TMS:FC0

Wednesday, December 19, 2012, 01:17 : vacuum at7.7E-7T, start cooling down, was ~ 2.5h at max current.

Attachment 1: heatint_rfq_dec18_2012.PNG
heatint_rfq_dec18_2012.PNG
Attachment 2: heatint_rfq_dec18_2012_detail.PNG
heatint_rfq_dec18_2012_detail.PNG
  254   Wednesday, December 19, 2012, 09:44 Sebastian Raeder      In progressventing

venting and inspect the target

Wednesday, December 19, 2012, 09:43: vqacuum at 1.9E-7T, stop turbos

  255   Wednesday, December 19, 2012, 11:24 Anders Mjos      Problems/SolutionsRestarted turbos in TMS section after power bump

Sources arch restared

  256   Wednesday, December 19, 2012, 16:22 Sebastian Raeder      Problems/Solutionsstatus after power outage

Wednesday, December 19, 2012, 16:24:

After long power outage, everything is off except the roughing pumps. Two turbo pumps (TMSTP2 and TSGTP1B) have shown fault due to timeout, only TSGTP1B could be reset, while TMSTP2 is still showing this fault

Vacuum in Magnet section is 0.004T according to TMSCG2. Since the target chamber was vented to remove the RFQ tests target, this section is actually pumped down using the roughing pumps (water lines are blanked off)

archivers started

Wednesday, December 19, 2012, 21:43

I was now able to reset TMSTP2.

closed the roughing pumps to the target chamber, vacuum at 0.027T

  257   Thursday, December 20, 2012, 14:19 Anders Mjos       Power down for holidays
  258   Thursday, January 03, 2013, 08:33 Anders Mjos      Problems/SolutionsStarted archivers after holiday shut down

Started archivers. Controls whited out.

  259   Thursday, January 03, 2013, 11:39 Anders Mjos      Problems/SolutionsStarting pumps after holiday shut down - TMSRP2 replaced

Thursday, January 03, 2013, 11:28: TMSRP2 is noisy. Stopped.

Roughing pump inspected by Vacuum group. Will be replaced later today. See e-fault 6516

Thursday, January 03, 2013, 11:29: TSGRP1 Started

Thursday, January 03, 2013, 11:29: TSGTP1A and 1B started

Thursday, January 03, 2013, 11:38 : TSGTP1A and B at speed

Thursday, January 03, 2013, 11:38 : Vacuum at 1.3E-5 T

TMSRP2 replaced

Thursday, January 03, 2013, 15:03: TMSTP2 and 6 started

Thursday, January 03, 2013, 15:07: TMSTP2 and 6 at speed

Thursday, January 03, 2013, 15:08: Vacuum at 5 E-5 T

  260   Friday, January 04, 2013, 10:52 Anders Mjos      In progressPreparing for venting

 Friday, January 04, 2013, 10:51: Vacuum at 3.2E-7 T

Friday, January 04, 2013, 10:52: Turbos stopped

Friday, January 04, 2013, 13:50: Venting

  261   Friday, January 04, 2013, 15:07 Anders MjosRFQ empty     In progressPumping down

Friday, January 04, 2013, 15:04: Roughing

Friday, January 04, 2013, 15:24: Starting turbos

Friday, January 04, 2013, 15:33 : Turbos at speed

Friday, January 04, 2013, 15:34 : Vacuum at 1.7E-5 T

  262   Monday, January 07, 2013, 14:52 Sebastian RaederRFQ empty      heating target

heating target for RFQ tests. Now the wiring is insulated with alumina beats and tubing and the target has the standard Ta alkali element mixture

 

Unfortunately I deleted some entries, so here a short summary in combination with a screenshot of the striptool

heated to 580A, vacuum increased over time from 4.8 to 5.6E-7T

HV up to 30kV - current of 37 uA - seems fine

Mass scan not possible, ops found a water leak in the magnet PS, optics around the magnet are thereofre also not available and red in EPICS

NOTE: all FC values are in reversed bias!!

 

source +4.5V, 2nd Rep 0V:  RFQ offs =0V, RFQ Ampl = 20V, 1 MHz (current 0.26A), locked up

 about 2E-9A at FC0

one spark observed

 

source -5.5V, 2nd Rep 0V:  RFQ offs =0V, RFQ Ampl = 20V, 1 MHz (current 0.26A), locked up

  about 4E-11A at FC0

 

source -12V, 2nd Rep 0V:  RFQ offs =0V, RFQ Ampl = 20V, 1 MHz (current 0.26A), locked up

  about 5E-11A at FC0

  two sparks observed

 

source +4.5V, 2nd Rep 0V:  RFQ offs =0V, RFQ Ampl = 20V, 1 MHz (current 0.26A), locked up

  about 3E-10A at FC0

 

source -5.5V, 2nd Rep 0V:  RFQ offs =0V, RFQ Ampl = 20V, 1 MHz (current 0.26A), locked up - done again since not sure if the restore of the tune was done properly for this

  about 4E-11A at FC0

 

done, source +4.5V, 2nd Rep +12V:  RFQ offs =0V, RFQ Ampl = 20V, 1 MHz (current 0.26A), locked up

   about 3E-10A at FC0

 1 spark during HV ramping

 

done, source +4.5V, 2nd Rep&exit +12V:  RFQ offs =+12V, RFQ Ampl = 20V, 1 MHz (current 0.26A), locked up

there is something visible <~ 2E-12A at FC0

 

reduced current to 550A and leave it over night.

 

Short summary:

suppression possible but RFQ has to be shifted, the "only source shift" mode yielded a worse suppression than expected - unfortunately no mass scans have been possible, which would help to get some information on possible effects

 

Attachment 1: RFQ_with_signal_total.PNG
RFQ_with_signal_total.PNG
Attachment 2: RFQ_with_signal.PNG
RFQ_with_signal.PNG
  263   Wednesday, January 09, 2013, 10:39 Anders MjosRFQ empty     In progressVenting

 Wednesday, January 09, 2013, 10:38: Turbos off. Vacuum at 1.7 E-7 T

Wednesday, January 09, 2013, 13:24 : Venting with nitgogen

Wednesday, January 09, 2013, 14:12: Target removed

  264   Wednesday, January 09, 2013, 14:13 Anders MjosEmpty      Rouging

Wednesday, January 09, 2013, 14:12: Roughing empty chamber

  265   Friday, January 11, 2013, 08:37 Anders MjosEmpty     In progressVenting

Friday, January 11, 2013, 08:36: Venting for installation of RFQ test target later today

  266   Friday, January 11, 2013, 11:02 Anders MjosRFQ empty      Target installed, pumping down

Target installed with 120 in lbs torque on target legs and on central support.

Friday, January 11, 2013, 11:01: Roughing

Friday, January 11, 2013, 11:25: Start turbos - SR

Friday, January 11, 2013, 11:34: turbos at speed - SR

Friday, January 11, 2013, 11:35: vacuum at 1.2E-5T - SR

 

  267   Monday, January 14, 2013, 13:51 Sebastian RaederRFQ empty     In progressheating

Started heating the target, now Silica sleevings are installed for wire insulation and the gap target -- repeller is now 0.6mm (was 0.25mm)

  268   Monday, January 14, 2013, 18:18 Friedhelm Ames       TMS:CBC1 not working

The optics at the teststand has been switched on, but TMS:CBC1 is not working. A fault report has been send to controls.

ELOG V2.9.2-2455