ID Date Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O#down Status Subject
  199   Tuesday, September 11, 2012, 19:48 Friedhelm AmesNB#7HP-SIS    Donecool down finished, all source power supplies off.
  200   Wednesday, September 12, 2012, 08:02 Anders MjosNb#7LP-SISITWTM1  In progressVenting

Wednesday, September 12, 2012, 08:01: Turbos off

Wednesday, September 12, 2012, 13:35: Venting, water off and purged.

Wednesday, September 12, 2012, 13:55: Vented

  201   Wednesday, September 12, 2012, 17:04 Anders MjosNb#7LP-SISITWTM1  In progressPumping down - w/replaced insulators

Replaced swollen insulator and added Ta heat shield on insulator.

 

Wednesday, September 12, 2012, 17:03: Roughing

Wednesday, September 12, 2012, 17:23 : Starting turbos

Wednesday, September 12, 2012, 17:32 : Turbos at speed

Wednesday, September 12, 2012, 17:33 : Vacuum at 3.2E-5

  202   Thursday, September 13, 2012, 08:24 Anders MjosNb#7LP-SISITWTM1  In progressWater on

Thursday, September 13, 2012, 08:16: Opened up cooling water. Vacuum (IG1) increased from 5.9E-7 to 6.2E-7 before returning to 5.9E-7. Similar response on IG6 (valve closed). Response is however similar to previous (short time ~5 min) vacuum fluctuations.

  203   Thursday, September 13, 2012, 13:05 Friedhelm AmesNb#7LP-SIS     heater ramping up started
  204   Friday, September 14, 2012, 15:27 Anders MjosNb#7LP-SISITWTM1  DoneVenting

Target cooled down. Power supplies off.

Friday, September 14, 2012, 15:27: Turbos off.

Friday, September 14, 2012, 15:32: Water purged.

 Friday, September 14, 2012, 16:00: Venting

Friday, September 14, 2012, 16:26: Vented

  205   Friday, September 14, 2012, 16:33 Anders Mjos      In progressPumping down empty chamber

Friday, September 14, 2012, 16:33: Roughing

Friday, September 14, 2012, 16:57: Starting turbos

Friday, September 14, 2012, 17:05 : Turbos at speed

Friday, September 14, 2012, 17:07: Vacuum at 8.7E-6

 

  206   Thursday, September 20, 2012, 14:24 Anders Mjos      In progressVenting - installation of FEBIAD test target for operator training

Thursday, September 20, 2012, 14:24: Turbos off

Thursday, September 20, 2012, 15:20: Venting

  207   Thursday, September 20, 2012, 15:52 Anders MjosTEST SiCHP-FEBIAD    In progressInstallilng SiC-HP-FEBIAD target for operator training

Thursday, September 20, 2012, 15:50: Roughing

Thursday, September 20, 2012, 15:54: Aborting. VCR for gas line not connected.

Thursday, September 20, 2012, 16:09: Roughing

Thursday, September 20, 2012, 16:29: Starting turbos

Thursday, September 20, 2012, 16:38 : Turbos at speed

Thursday, September 20, 2012, 16:39 : Vacuum at 1.3E-5 torr

 

  208   Friday, September 21, 2012, 08:20 Anders MjosTEST SiCHP-FEBIAD    In progressInstallilng SiC-HP-FEBIAD target for operator training

Anders Mjos wrote:

Thursday, September 20, 2012, 15:50: Roughing

Thursday, September 20, 2012, 15:54: Aborting. VCR for gas line not connected.

Thursday, September 20, 2012, 16:09: Roughing

Thursday, September 20, 2012, 16:29: Starting turbos

Thursday, September 20, 2012, 16:38 : Turbos at speed

Thursday, September 20, 2012, 16:39 : Vacuum at 1.3E-5 torr

 

 Friday, September 21, 2012, 08:19: Cooling water on. Vacuum stable at 2.3E-7 torr.

  209   Friday, September 21, 2012, 08:27 Anders Mjos      Problems/SolutionsBacking pressure TSG:CG1A/B fluctuating

Backing pressures TSG:CG1A/B are fluctuating between 0.02 and 0.05 since Sept 17th at ~17h. Expected values <0.01.

  210   Monday, September 24, 2012, 10:31 Anders Mjos      Problems/SolutionsEPICS whiteout

 Test stand was off this morning and EPICS controls in "white-out". Controls is looking into it.

Update  13:51:

Controls have reestablished contact with the PLC.

  211   Monday, September 24, 2012, 13:52 Anders Mjos      Problems/SolutionsTSG:RP1 will not start without blowing the fuse

See e-fault 6329

Tried to start the pump from another power outlet with Edi. No luck. Pump will be replaced tomorrow.

  212   Monday, September 24, 2012, 15:25 Anders Mjos      DoneTMS RP and TP started
  213   Tuesday, September 25, 2012, 13:05 Anders Mjos      Problems/SolutionsTSG:RP1 will not start without blowing the fuse

Anders Mjos wrote:

See e-fault 6329

Tried to start the pump from another power outlet with Edi. No luck. Pump will be replaced tomorrow.

 Pump replaced by vacuum group

  214   Tuesday, September 25, 2012, 13:25 Anders Mjos      DoneStarted turbos after replaced roughing pump
  215   Tuesday, September 25, 2012, 16:10 Aurelia Laxdal       Conditioning - SiC-HP-FEBIAD for operator training

Did the HV conditioning up to 30kV.

Started the heaters conditioning:

for TSH:TGHT up to 580A

for TSH:TBHT up to 230A

  216   Thursday, September 27, 2012, 12:27 Aurelia Laxdal      In progressSiC-HP-FEBIAD for operator training

The source was used yesterday for operator training.

Today, I found the source off: the ISAC PLC Status was stopped. Kazuya re-started the PLC. I will re-start the source.

  217   Friday, September 28, 2012, 09:59 Aurelia Laxdal      In progressSiC-HP-FEBIAD for operator training - Source Off

Checked with ISAC Ops this morning and they are not available for FEBIAD training. Turned off the source until next week.

  218   Monday, October 01, 2012, 10:41 Aurelia Laxdal HP-FEBIAD    In progressSiC-HP-FEBIAD for operator training - Source ON

Turned the source back ON. Heaters are ramping up.