Entry  Tuesday, May 15, 2012, 09:46, Rick Maharaj, , , , , , , , target reinstalled pumping started 
 
Entry  Wednesday, May 16, 2012, 16:01, Anders Mjos, , , , , , , Problems/Solutions, Loose chip of insulator material detected Ceramic_Chip.pdf

 A chip of insulator material was detected below the lower target insulator stand-off (attachment - left picture). The chip may come from the tube heater insulator above (attachment - right picture). The chip will be further investigated when the target is removed.

Entry  Wednesday, May 16, 2012, 18:10, Aurelia Laxdal, , , ITE, TM4, , , , SiC#27 cooling down 

Today: did a mass scan at 580A on TGHT and 230A on TBHT at 30kV. Found some A/q units discrepancies on the mass scan page. It may be a hall probe problem:  under investigations.

Uploaded the testing file on Docushare: http://documents.triumf.ca/docushare/dsweb/View/Collection-8539/Document-56575

Started the cool down.

Entry  Wednesday, May 16, 2012, 19:55, Friedhelm Ames, , , , , , , Problems/Solutions, Hall probe reading wrong 

During the mass scan today it was discovered, that the mass calibration was off. Further investigation showed, that the Hall probe readings are a factor of 1.31 lower than during previous measurements. A fault report has been issued to controls.

Entry  Thursday, May 17, 2012, 15:14, Anders Mjos, , , , , , , , Pumping down empty chamber 

Thursday, May 17, 2012, 15:14: Started roughing. Cooling lines blanked off.

Thursday, May 17, 2012, 16:52: Starting turbos.

Thursday, May 17, 2012, 17:00: Turbos at speed. Vacuum at 1.5E-5.

Entry  Thursday, May 31, 2012, 14:46, Anders Mjos, , , , , , , , Venting in preparation for Ta#38 

Thursday, May 31, 2012, 14:46: Switching off turbos

Thursday, May 31, 2012, 15:05: Venting

Entry  Monday, June 04, 2012, 11:40, Anders Mjos, , , , , , , In progress, Empty chamber 

HS water lines blanked.

Monday, June 04, 2012, 11:40: Roughing.

Monday, June 04, 2012, 11:58: Starting turbos. 

Monday, June 04, 2012, 12:06 : Turbos at speed. Vacuum 1.5 E-5

    Reply  Tuesday, June 26, 2012, 16:06, Anders Mjos, , , , , , , Done, Vented 

Anders Mjos wrote:

HS water lines blanked.

Monday, June 04, 2012, 11:40: Roughing.

Monday, June 04, 2012, 11:58: Starting turbos. 

Monday, June 04, 2012, 12:06 : Turbos at speed. Vacuum 1.5 E-5

 Tuesday, June 26, 2012, 16:06: Turbos off.

Tuesday, June 26, 2012, 17:20: Vented.

Entry  Tuesday, June 26, 2012, 18:04, Anders Mjos, FEBIAD anode end cap test, , , , Tube only, 38307-9, In progress, FEBIAD anode end cap test - ready 

Testing FEBIAD anode end cap as per dwg ITD0304 REV C

Target with TUBE ONLY. Do not use target heater.


Tuesday, June 26, 2012, 18:03: Roughing

Tuesday, June 26, 2012, 18:24: Turbos started

Tuesday, June 26, 2012, 18:31 : Turbos at speed. Vacuum at 1.8E-5

Wednesday, June 27, 2012, 08:48: Cooling opened. Vacuum stable at 4.2E-7. Ready for testing.

 

Entry  Tuesday, June 26, 2012, 18:30, Anders Mjos, , , , , , , Problems/Solutions, Crack in source tray insulator Cracked_insulator.pdf

 A crack in the insulator ITD0054 was observed while mounting the target assembly. See attachment.

Entry  Friday, June 29, 2012, 13:39, Friedhelm Ames, , , , , , , , start mass scan 

start mass scan to do new mass calibration

Entry  Friday, June 29, 2012, 15:02, Friedhelm Ames, , , , , , , , mass scan finished mass_spectrum_2012_06_29.PNG

mass spectrum saved as

plotdump-local-clean.txt_Jun29_12_14-55-43.txt

Entry  Friday, June 29, 2012, 15:03, Friedhelm Ames, , , , , , , , start ramping down heater 
 
    Reply  Friday, June 29, 2012, 16:39, Friedhelm Ames, , , , , , , , mass scan finished 

Friedhelm Ames wrote:

mass spectrum saved as

plotdump-local-clean.txt_Jun29_12_14-55-43.txt

 new parameters for mass scan program after fit of mass scan

CONST11 = -4.13

CONST22 = 0.09595

Entry  Tuesday, July 03, 2012, 09:23, Friedhelm Ames, , , , , , , In progress, start up again 

purged Ne line and started cathode heater ramp up to 295 A

Entry  Tuesday, July 03, 2012, 19:05, Friedhelm Ames, , , , , , , Problems/Solutions, short in anode 

A short in the anode has developed during the heater ramp up. Increasing the current limit did not cure it. Start heater ramp down to investigate.

Entry  Wednesday, July 04, 2012, 09:22, Friedhelm Ames, , , , , , , Problems/Solutions, turbo pumps stopped 

turbo pumps stopped to prepare for venting for anode short investigation.

    Reply  Wednesday, July 04, 2012, 13:07, Anders Mjos, , , , , , , Problems/Solutions, water lines purged 

Friedhelm Ames wrote:

turbo pumps stopped to prepare for venting for anode short investigation.

 Wednesday, July 04, 2012, 13:07: Water lines purged

    Reply  Wednesday, July 04, 2012, 15:33, Anders Mjos, , , , , , , Problems/Solutions, short in anode photo_1.JPGphoto_3.JPG

Friedhelm Ames wrote:

A short in the anode has developed during the heater ramp up. Increasing the current limit did not cure it. Start heater ramp down to investigate.

 Wednesday, July 04, 2012: short found between anode and target. probably caused by the target tube coming in contact with the anode due to bending of the tube caused by heating and deformation of the grid retaining ring. see attachements

Entry  Wednesday, July 04, 2012, 15:37, Anders Mjos, FEBIAD anode end cap test, , , , , , In progress, Pumping down  photo_8.jpg

Replaced grid containing ring (target side) with new ring. No contact between target and anode measured in lab.

NOTE: While closing up the VCR fittings the tube rotated causing the tube to flatten in a bend. This may reduce water flow on the heat shield circuit. (see attachment)

Wednesday, July 04, 2012, 15:33: Started roughing.

Wednesday, July 04, 2012, 15:57 : Started turbos

Wednesday, July 04, 2012, 16:03: Turbos at speed. Vacuum at 3E-5