86
|
Tuesday, May 15, 2012, 08:08 |
Rick Maharaj | sic#27 | | | | | | | Turbos off |
Target needs to be removed form teststand to remove heatshielding around target oven. The chamber will be vented, water circuits flushed and target removed. |
|
87
|
Tuesday, May 15, 2012, 08:15 |
Rick Maharaj | | | | | | | | Test Stand chamber venting |
|
|
88
|
Tuesday, May 15, 2012, 08:16 |
Rick Maharaj | | | | | | | | Water circuits flushed |
|
|
89
|
Tuesday, May 15, 2012, 08:42 |
Rick Maharaj | | | | | | | | target removed |
|
|
90
|
Tuesday, May 15, 2012, 09:46 |
Rick Maharaj | | | | | | | | target reinstalled pumping started |
|
|
93
|
Wednesday, May 16, 2012, 16:01 |
Anders Mjos | | | | | | | Problems/Solutions | Loose chip of insulator material detected |
A chip of insulator material was detected below the lower target insulator stand-off (attachment - left picture). The chip may come from the tube heater insulator above (attachment - right picture). The chip will be further investigated when the target is removed. |
Attachment 1: Ceramic_Chip.pdf
|
|
|
94
|
Wednesday, May 16, 2012, 18:10 |
Aurelia Laxdal | | | ITE | TM4 | | | | SiC#27 cooling down |
Today: did a mass scan at 580A on TGHT and 230A on TBHT at 30kV. Found some A/q units discrepancies on the mass scan page. It may be a hall probe problem: under investigations.
Uploaded the testing file on Docushare: http://documents.triumf.ca/docushare/dsweb/View/Collection-8539/Document-56575
Started the cool down. |
|
95
|
Wednesday, May 16, 2012, 19:55 |
Friedhelm Ames | | | | | | | Problems/Solutions | Hall probe reading wrong |
During the mass scan today it was discovered, that the mass calibration was off. Further investigation showed, that the Hall probe readings are a factor of 1.31 lower than during previous measurements. A fault report has been issued to controls. |
|
99
|
Thursday, May 17, 2012, 15:14 |
Anders Mjos | | | | | | | | Pumping down empty chamber |
Thursday, May 17, 2012, 15:14: Started roughing. Cooling lines blanked off.
Thursday, May 17, 2012, 16:52: Starting turbos.
Thursday, May 17, 2012, 17:00: Turbos at speed. Vacuum at 1.5E-5. |
|
100
|
Thursday, May 31, 2012, 14:46 |
Anders Mjos | | | | | | | | Venting in preparation for Ta#38 |
Thursday, May 31, 2012, 14:46: Switching off turbos
Thursday, May 31, 2012, 15:05: Venting |
|
104
|
Monday, June 04, 2012, 11:40 |
Anders Mjos | | | | | | | In progress | Empty chamber |
HS water lines blanked.
Monday, June 04, 2012, 11:40: Roughing.
Monday, June 04, 2012, 11:58: Starting turbos.
Monday, June 04, 2012, 12:06 : Turbos at speed. Vacuum 1.5 E-5 |
|
105
|
Tuesday, June 26, 2012, 16:06 |
Anders Mjos | | | | | | | Done | Vented |
Anders Mjos wrote: |
HS water lines blanked.
Monday, June 04, 2012, 11:40: Roughing.
Monday, June 04, 2012, 11:58: Starting turbos.
Monday, June 04, 2012, 12:06 : Turbos at speed. Vacuum 1.5 E-5
|
Tuesday, June 26, 2012, 16:06: Turbos off.
Tuesday, June 26, 2012, 17:20: Vented. |
|
106
|
Tuesday, June 26, 2012, 18:04 |
Anders Mjos | FEBIAD anode end cap test | | | | Tube only | 38307-9 | In progress | FEBIAD anode end cap test - ready |
Testing FEBIAD anode end cap as per dwg ITD0304 REV C
Target with TUBE ONLY. Do not use target heater.
Tuesday, June 26, 2012, 18:03: Roughing
Tuesday, June 26, 2012, 18:24: Turbos started
Tuesday, June 26, 2012, 18:31 : Turbos at speed. Vacuum at 1.8E-5
Wednesday, June 27, 2012, 08:48: Cooling opened. Vacuum stable at 4.2E-7. Ready for testing.
|
|
107
|
Tuesday, June 26, 2012, 18:30 |
Anders Mjos | | | | | | | Problems/Solutions | Crack in source tray insulator |
A crack in the insulator ITD0054 was observed while mounting the target assembly. See attachment. |
Attachment 1: Cracked_insulator.pdf
|
|
|
117
|
Friday, June 29, 2012, 13:39 |
Friedhelm Ames | | | | | | | | start mass scan |
start mass scan to do new mass calibration |
|
118
|
Friday, June 29, 2012, 15:02 |
Friedhelm Ames | | | | | | | | mass scan finished |
mass spectrum saved as
plotdump-local-clean.txt_Jun29_12_14-55-43.txt
|
Attachment 1: mass_spectrum_2012_06_29.PNG
|
|
|
119
|
Friday, June 29, 2012, 15:03 |
Friedhelm Ames | | | | | | | | start ramping down heater |
|
|
120
|
Friday, June 29, 2012, 16:39 |
Friedhelm Ames | | | | | | | | mass scan finished |
new parameters for mass scan program after fit of mass scan
CONST11 = -4.13
CONST22 = 0.09595 |
|
121
|
Tuesday, July 03, 2012, 09:23 |
Friedhelm Ames | | | | | | | In progress | start up again |
purged Ne line and started cathode heater ramp up to 295 A |
|
122
|
Tuesday, July 03, 2012, 19:05 |
Friedhelm Ames | | | | | | | Problems/Solutions | short in anode |
A short in the anode has developed during the heater ramp up. Increasing the current limit did not cure it. Start heater ramp down to investigate. |