  90   Tuesday, May 15, 2012, 09:46 Rick Maharaj       target reinstalled pumping started
  93   Wednesday, May 16, 2012, 16:01 Anders Mjos      Problems/SolutionsLoose chip of insulator material detected

 A chip of insulator material was detected below the lower target insulator stand-off (attachment - left picture). The chip may come from the tube heater insulator above (attachment - right picture). The chip will be further investigated when the target is removed.

Attachment 1: Ceramic_Chip.pdf
Ceramic_Chip.pdf
  94   Wednesday, May 16, 2012, 18:10 Aurelia Laxdal  ITETM4   SiC#27 cooling down

Today: did a mass scan at 580A on TGHT and 230A on TBHT at 30kV. Found some A/q units discrepancies on the mass scan page. It may be a hall probe problem:  under investigations.

Uploaded the testing file on Docushare: http://documents.triumf.ca/docushare/dsweb/View/Collection-8539/Document-56575

Started the cool down.

  95   Wednesday, May 16, 2012, 19:55 Friedhelm Ames      Problems/SolutionsHall probe reading wrong

During the mass scan today it was discovered, that the mass calibration was off. Further investigation showed, that the Hall probe readings are a factor of 1.31 lower than during previous measurements. A fault report has been issued to controls.

  99   Thursday, May 17, 2012, 15:14 Anders Mjos       Pumping down empty chamber

Thursday, May 17, 2012, 15:14: Started roughing. Cooling lines blanked off.

Thursday, May 17, 2012, 16:52: Starting turbos.

Thursday, May 17, 2012, 17:00: Turbos at speed. Vacuum at 1.5E-5.

  100   Thursday, May 31, 2012, 14:46 Anders Mjos       Venting in preparation for Ta#38

Thursday, May 31, 2012, 14:46: Switching off turbos

Thursday, May 31, 2012, 15:05: Venting

  104   Monday, June 04, 2012, 11:40 Anders Mjos      In progressEmpty chamber

HS water lines blanked.

Monday, June 04, 2012, 11:40: Roughing.

Monday, June 04, 2012, 11:58: Starting turbos. 

Monday, June 04, 2012, 12:06 : Turbos at speed. Vacuum 1.5 E-5

  105   Tuesday, June 26, 2012, 16:06 Anders Mjos      DoneVented

Anders Mjos wrote:

HS water lines blanked.

Monday, June 04, 2012, 11:40: Roughing.

Monday, June 04, 2012, 11:58: Starting turbos. 

Monday, June 04, 2012, 12:06 : Turbos at speed. Vacuum 1.5 E-5

 Tuesday, June 26, 2012, 16:06: Turbos off.

Tuesday, June 26, 2012, 17:20: Vented.

  106   Tuesday, June 26, 2012, 18:04 Anders MjosFEBIAD anode end cap test   Tube only38307-9In progressFEBIAD anode end cap test - ready

Testing FEBIAD anode end cap as per dwg ITD0304 REV C

Target with TUBE ONLY. Do not use target heater.


Tuesday, June 26, 2012, 18:03: Roughing

Tuesday, June 26, 2012, 18:24: Turbos started

Tuesday, June 26, 2012, 18:31 : Turbos at speed. Vacuum at 1.8E-5

Wednesday, June 27, 2012, 08:48: Cooling opened. Vacuum stable at 4.2E-7. Ready for testing.

 

  107   Tuesday, June 26, 2012, 18:30 Anders Mjos      Problems/SolutionsCrack in source tray insulator

 A crack in the insulator ITD0054 was observed while mounting the target assembly. See attachment.

Attachment 1: Cracked_insulator.pdf
Cracked_insulator.pdf
  117   Friday, June 29, 2012, 13:39 Friedhelm Ames       start mass scan

start mass scan to do new mass calibration

  118   Friday, June 29, 2012, 15:02 Friedhelm Ames       mass scan finished

mass spectrum saved as

plotdump-local-clean.txt_Jun29_12_14-55-43.txt

Attachment 1: mass_spectrum_2012_06_29.PNG
mass_spectrum_2012_06_29.PNG
  119   Friday, June 29, 2012, 15:03 Friedhelm Ames       start ramping down heater
  120   Friday, June 29, 2012, 16:39 Friedhelm Ames       mass scan finished

Friedhelm Ames wrote:

mass spectrum saved as

plotdump-local-clean.txt_Jun29_12_14-55-43.txt

 new parameters for mass scan program after fit of mass scan

CONST11 = -4.13

CONST22 = 0.09595

  121   Tuesday, July 03, 2012, 09:23 Friedhelm Ames      In progressstart up again

purged Ne line and started cathode heater ramp up to 295 A

  122   Tuesday, July 03, 2012, 19:05 Friedhelm Ames      Problems/Solutionsshort in anode

A short in the anode has developed during the heater ramp up. Increasing the current limit did not cure it. Start heater ramp down to investigate.

  123   Wednesday, July 04, 2012, 09:22 Friedhelm Ames      Problems/Solutionsturbo pumps stopped

turbo pumps stopped to prepare for venting for anode short investigation.

  124   Wednesday, July 04, 2012, 13:07 Anders Mjos      Problems/Solutionswater lines purged

Friedhelm Ames wrote:

turbo pumps stopped to prepare for venting for anode short investigation.

 Wednesday, July 04, 2012, 13:07: Water lines purged

  125   Wednesday, July 04, 2012, 15:33 Anders Mjos      Problems/Solutionsshort in anode

Friedhelm Ames wrote:

A short in the anode has developed during the heater ramp up. Increasing the current limit did not cure it. Start heater ramp down to investigate.

 Wednesday, July 04, 2012: short found between anode and target. probably caused by the target tube coming in contact with the anode due to bending of the tube caused by heating and deformation of the grid retaining ring. see attachements

Attachment 1: photo_1.JPG
photo_1.JPG
Attachment 2: photo_3.JPG
photo_3.JPG
  126   Wednesday, July 04, 2012, 15:37 Anders MjosFEBIAD anode end cap test     In progressPumping down

Replaced grid containing ring (target side) with new ring. No contact between target and anode measured in lab.

NOTE: While closing up the VCR fittings the tube rotated causing the tube to flatten in a bend. This may reduce water flow on the heat shield circuit. (see attachment)

Wednesday, July 04, 2012, 15:33: Started roughing.

Wednesday, July 04, 2012, 15:57 : Started turbos

Wednesday, July 04, 2012, 16:03: Turbos at speed. Vacuum at 3E-5

Attachment 1: photo_8.jpg
photo_8.jpg