Entry  Friday, August 31, 2012, 11:12, Aurelia Laxdal, , HP-FEBIAD, ITE, TM4, , , Done, Finished testing NiO#1 
Turned off the HV and the optics in the first section. Couldn't turn off the optics in the second section: left a message for Evgeniy.
Also TMS:RP2 is very noisy. Talked to Edi D. from vacuum group. He would work on it this afternoon. E-Fault#6282
Entry  Friday, September 14, 2012, 16:33, Anders Mjos, , , , , , , In progress, Pumping down empty chamber 
Friday, September 14, 2012, 16:33: Roughing
Friday, September 14, 2012, 16:57: Starting turbos
Friday, September 14, 2012, 17:05 : Turbos at speed
Entry  Thursday, September 20, 2012, 14:24, Anders Mjos, , , , , , , In progress, Venting - installation of FEBIAD test target for operator training 
Thursday, September 20, 2012, 14:24: Turbos off
Thursday, September 20, 2012, 15:20: Venting
Entry  Friday, September 21, 2012, 08:27, Anders Mjos, , , , , , , Problems/Solutions, Backing pressure TSG:CG1A/B fluctuating 
Backing pressures TSG:CG1A/B are fluctuating between 0.02 and 0.05 since Sept 17th at ~17h. Expected values <0.01.
Entry  Monday, September 24, 2012, 10:31, Anders Mjos, , , , , , , Problems/Solutions, EPICS whiteout 
 Test stand was off this morning and EPICS controls in "white-out". Controls is looking into it.
Update  13:51:
Controls have reestablished contact with the PLC.
Entry  Monday, September 24, 2012, 13:52, Anders Mjos, , , , , , , Problems/Solutions, TSG:RP1 will not start without blowing the fuse 
See e-fault 6329
Tried to start the pump from another power outlet with Edi. No luck. Pump will be replaced tomorrow.
Entry  Monday, September 24, 2012, 15:25, Anders Mjos, , , , , , , Done, TMS RP and TP started 
 
    Reply  Tuesday, September 25, 2012, 13:05, Anders Mjos, , , , , , , Problems/Solutions, TSG:RP1 will not start without blowing the fuse 


    
        
            Anders Mjos wrote:
        
        
            
            See e-fault 6329
Entry  Tuesday, September 25, 2012, 13:25, Anders Mjos, , , , , , , Done, Started turbos after replaced roughing pump 
 
Entry  Tuesday, September 25, 2012, 16:10, Aurelia Laxdal, , , , , , , , Conditioning - SiC-HP-FEBIAD for operator training 
Did the HV conditioning up to 30kV.
Started the heaters conditioning:
for TSH:TGHT up to 580A
Entry  Thursday, September 27, 2012, 12:27, Aurelia Laxdal, , , , , , , In progress, SiC-HP-FEBIAD for operator training 
The source was used yesterday for operator training.
Today, I found the source off: the ISAC PLC Status was stopped. Kazuya re-started the PLC. I will re-start the source.
Entry  Friday, September 28, 2012, 09:59, Aurelia Laxdal, , , , , , , In progress, SiC-HP-FEBIAD for operator training - Source Off 
Checked with ISAC Ops this morning and they are not available for FEBIAD training. Turned off the source until next week.
Entry  Monday, October 01, 2012, 10:41, Aurelia Laxdal, , HP-FEBIAD, , , , , In progress, SiC-HP-FEBIAD for operator training - Source ON  
Turned the source back ON. Heaters are ramping up.
Entry  Wednesday, October 03, 2012, 13:50, Aurelia Laxdal, , HP-FEBIAD, , , , , In progress, Training updates 
On Monday October 1, the HP-FEBIAD source was turned ON again, to complete the operator training. The last session was yesterday and for the time being
the ISAC operators can play with the source when time allows, and from the ISAC Control room. For this purpose the source will be kept on this week and
also over the week-end.
Entry  Wednesday, October 10, 2012, 10:47, Friedhelm Ames, , , , , , , Failed, found teststand tripped off 
turbo pumps in source section and all ion gauges off all optics and heaters tripped. Reason unknown.
    Reply  Wednesday, October 10, 2012, 17:35, Aurelia Laxdal, , , , , , , Failed, found teststand tripped off 


    
        
            Friedhelm Ames wrote:
        
        
            
            turbo pumps in source section and all ion gauges off all optics and heaters tripped. Reason unknown.
Entry  Friday, November 02, 2012, 14:20, Aurelia Laxdal, , LP-SIS, ITW, TM1, , , , Mass scan done 


Normal
0




false
false
false

EN-US
X-NONE
X-NONE

Entry  Friday, November 02, 2012, 15:40, Aurelia Laxdal, , LP-SIS, ITW, TM1, , , Done, SiC#3 cooldown started 
Started the cooldown for SiC#3.
Entry  Monday, November 05, 2012, 09:47, Aurelia Laxdal, , LP-SIS, ITW, TM1, , , Done, TPS optics cannot be turned off.  
All TPS optics, with the exception of TPS:Q4 cannot be turned off. E-Fault#6395 for Controls.
Same for the TSG optics: CB1, VCB1 and CBC.
Talked to Evgeniy and Kazuya. Optics are OFF now.
Entry  Monday, November 05, 2012, 13:26, Aurelia Laxdal, , LP-SIS, ITW, TM1, , , Done, Venting the Test Stand 
Venting the Test Stand.
TiC#3 will be ready to be removed in few minutes. 
Please note: water is still ON.