Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand, Page 18 of 53  Not logged in ELOG logo
  ID Date Author Target/No.# Source Station Moduledown Target Oven W.O# Heat Shield W.O# Status Subject Text Attachments
  181   Thursday, August 23, 2012, 11:59 Anders Mjos      Problems/SolutionsRoughing blows the fuse for both roughing pumps.The fuse for both roughing pumps blows
when roughing the chamber. With the help
from Edi: disconnect the exhaust port on
  
  184   Monday, August 27, 2012, 15:21 Aurelia Laxdal      In progressXantrex PS 10-600 for TSH:TGHT is not working When turned ON it was not going higher
than 3.6A (EPICS/front panel).  Kazuya checked
the connections at the back and also the
  
  189   Friday, August 31, 2012, 10:19 Anders Mjos      Problems/SolutionsReplaced TMSRP2 (again)

    

       
            
  
  194   Thursday, September 06, 2012, 09:23 Friedhelm AmesNB#7       start high voltage and heaters   
  195   Friday, September 07, 2012, 12:11 Friedhelm AmesNB#7LP-SIS    In progressmass scan startedmass scan has been started after optimization
on 23Na
  
  196   Friday, September 07, 2012, 13:10 Friedhelm AmesNb#7     Donemass scan finishedmass scan is finished saved as 
 
  Normal

 0
  
  
  198   Tuesday, September 11, 2012, 13:13 Friedhelm AmesNb#7LP-SIS    In progressstart cool downstart cooldown. Found computer at teststand
off. Somebody tried to login with username
ARIEL.
  
  199   Tuesday, September 11, 2012, 19:48 Friedhelm AmesNB#7HP-SIS    Donecool down finished, all source power supplies off.    
  203   Thursday, September 13, 2012, 13:05 Friedhelm AmesNb#7LP-SIS     heater ramping up started    
  205   Friday, September 14, 2012, 16:33 Anders Mjos      In progressPumping down empty chamberFriday, September 14, 2012, 16:33: Roughing
Friday, September 14, 2012, 16:57:
Starting turbos
  
  206   Thursday, September 20, 2012, 14:24 Anders Mjos      In progressVenting - installation of FEBIAD test target for operator trainingThursday, September 20, 2012, 14:24: Turbos
off
Thursday, September 20, 2012, 15:20:
  
  207   Thursday, September 20, 2012, 15:52 Anders MjosTEST SiCHP-FEBIAD    In progressInstallilng SiC-HP-FEBIAD target for operator trainingThursday, September 20, 2012, 15:50: Roughing
Thursday, September 20, 2012, 15:54:
Aborting. VCR for gas line not connected.
  
  208   Friday, September 21, 2012, 08:20 Anders MjosTEST SiCHP-FEBIAD    In progressInstallilng SiC-HP-FEBIAD target for operator training

    

       
            
  
  209   Friday, September 21, 2012, 08:27 Anders Mjos      Problems/SolutionsBacking pressure TSG:CG1A/B fluctuatingBacking pressures TSG:CG1A/B are fluctuating
between 0.02 and 0.05 since Sept 17th at
~17h. Expected values <0.01.
  
  210   Monday, September 24, 2012, 10:31 Anders Mjos      Problems/SolutionsEPICS whiteout Test stand was off this morning and
EPICS controls in "white-out".
Controls is looking into it.
  
  211   Monday, September 24, 2012, 13:52 Anders Mjos      Problems/SolutionsTSG:RP1 will not start without blowing the fuseSee e-fault 6329
Tried to start the pump from another
power outlet with Edi. No luck. Pump will
  
  212   Monday, September 24, 2012, 15:25 Anders Mjos      DoneTMS RP and TP started    
  213   Tuesday, September 25, 2012, 13:05 Anders Mjos      Problems/SolutionsTSG:RP1 will not start without blowing the fuse

    

       
            
  
  214   Tuesday, September 25, 2012, 13:25 Anders Mjos      DoneStarted turbos after replaced roughing pump    
  215   Tuesday, September 25, 2012, 16:10 Aurelia Laxdal       Conditioning - SiC-HP-FEBIAD for operator trainingDid the HV conditioning up to 30kV.
Started the heaters conditioning:
for TSH:TGHT up to 580A
  
ELOG V2.9.2-2455