77
|
Friday, April 20, 2012, 08:56 |
Anders Mjos | Nb#6 | LP-SIS | ITW | TM1 | | | Problems/Solutions | Insulator stand-off failure | When the target was removed from
the test stand it was discovered that the
custom designed insulator stand-off (ITD0400 |
|
|
78
|
Thursday, April 26, 2012, 09:14 |
Anders Mjos | | | | | | | | removed Al(CH3)3 |
|
|
|
79
|
Wednesday, May 09, 2012, 08:56 |
Anders Mjos | | | | | | | Problems/Solutions | TSGIG1 not working | TSGIG1 has timed out. As seen on
the attached screen shot, the IG has been
out since 17h May 1st. |
|
|
80
|
Wednesday, May 09, 2012, 09:16 |
Anders Mjos | | | | | | | Problems/Solutions | TSGIG1 not working |
|
|
|
81
|
Thursday, May 10, 2012, 08:13 |
Anders Mjos | | | | | | | Problems/Solutions | Venting for TSGIG1 repair |
|
|
|
82
|
Thursday, May 10, 2012, 09:48 |
Anders Mjos | | | | | | | Problems/Solutions | Ion Gauge filament replaced |
|
|
|
91
|
Tuesday, May 15, 2012, 10:14 |
Anders Mjos | SiC#27 | HP-SIS | ITE | TM4 | | | In progress | target ready to be heated and biased | Tuesday, May 15, 2012, 10:13: Turbo
pumps at speed. Vacuum at 1.4E-5.
Tuesday, May 15, 2012, 12:03: Cooling |
|
|
93
|
Wednesday, May 16, 2012, 16:01 |
Anders Mjos | | | | | | | Problems/Solutions | Loose chip of insulator material detected | A chip of insulator material was
detected below the lower target insulator
stand-off (attachment - left picture). The |
|
|
96
|
Thursday, May 17, 2012, 08:36 |
Anders Mjos | SiC#27 | HP-SIS | ITE | TM4 | | | Done | Target removed | Thursday, May 17, 2012, 08:36: Turbo pumps
switched off in preparation of target removal.
Thursday, May 17, 2012, 08:51: Purging |
|
|
97
|
Thursday, May 17, 2012, 12:19 |
Anders Mjos | SiC#27 | HP-SIS | ITE | TM4 | | | Problems/Solutions | Loose chip of insulator material detected |
|
|
|
99
|
Thursday, May 17, 2012, 15:14 |
Anders Mjos | | | | | | | | Pumping down empty chamber | Thursday, May 17, 2012, 15:14: Started
roughing. Cooling lines blanked off.
Thursday, May 17, 2012, 16:52: Starting |
|
|
100
|
Thursday, May 31, 2012, 14:46 |
Anders Mjos | | | | | | | | Venting in preparation for Ta#38 | Thursday, May 31, 2012, 14:46: Switching
off turbos
Thursday, May 31, 2012, 15:05: Venting |
|
|
101
|
Thursday, May 31, 2012, 15:43 |
Anders Mjos | Ta#38 | LP-SIS | ITW | TM1 | | | In progress | Target ready to be heated | Thursday, May 31, 2012, 15:42: Roughing
Thursday, May 31, 2012, 16:01 : Starting
turbos |
|
|
103
|
Monday, June 04, 2012, 10:51 |
Anders Mjos | Ta#38 | LP-SIS | ITW | TM1 | | | Done | Venting chamber |
|
|
|
104
|
Monday, June 04, 2012, 11:40 |
Anders Mjos | | | | | | | In progress | Empty chamber | HS water lines blanked.
Monday, June 04, 2012, 11:40: Roughing.
Monday, June 04, 2012, 11:58: Starting |
|
|
105
|
Tuesday, June 26, 2012, 16:06 |
Anders Mjos | | | | | | | Done | Vented |
|
|
|
106
|
Tuesday, June 26, 2012, 18:04 |
Anders Mjos | FEBIAD anode end cap test | | | | Tube only | 38307-9 | In progress | FEBIAD anode end cap test - ready | Testing FEBIAD anode end cap as per dwg
ITD0304 REV C
Target with TUBE ONLY. Do not use |
|
|
107
|
Tuesday, June 26, 2012, 18:30 |
Anders Mjos | | | | | | | Problems/Solutions | Crack in source tray insulator | A crack in the insulator ITD0054
was observed while mounting the target assembly.
See attachment. |
|
|
124
|
Wednesday, July 04, 2012, 13:07 |
Anders Mjos | | | | | | | Problems/Solutions | water lines purged |
|
|
|
125
|
Wednesday, July 04, 2012, 15:33 |
Anders Mjos | | | | | | | Problems/Solutions | short in anode |
|
|