Entry  Friday, April 20, 2012, 08:56, Anders Mjos, Nb#6, LP-SIS, ITW, TM1, , , Problems/Solutions, Insulator stand-off failure ITW-TM1-Nb#6-LP-SIS_-_TestStand.pdf
 When the target was removed from the test stand it was discovered that the custom designed insulator stand-off (ITD0400 made from Mycroy 1100)
had swollen and become discoloured in the area exposed to "heat shine" from the target oven. See attached pdf for photos of the insulators.
The heat shield lid was opened up and the target temporarily removed to replace the two insulators that had failed. These were replaced with the
    Reply  Thursday, April 26, 2012, 09:14, Anders Mjos, , , , , , , , removed Al(CH3)3 


    
        
            Friedhelm Ames wrote:
        
        
            
            connected A(CH3)3 instead of He, pumped line and valve with pump on the high voltage rack.. Opened regulating
Entry  Wednesday, May 09, 2012, 08:56, Anders Mjos, , , , , , , Problems/Solutions, TSGIG1 not working TestStand-IG.PNG
 TSGIG1 has timed out. As seen on the attached screen shot, the IG has been out since 17h May 1st.
    Reply  Wednesday, May 09, 2012, 09:16, Anders Mjos, , , , , , , Problems/Solutions, TSGIG1 not working 


    
        
            Anders Mjos wrote:
        
        
            
             TSGIG1 has timed out. As seen on the attached screen shot, the IG has been out since 17h May 1st.
    Reply  Thursday, May 10, 2012, 08:13, Anders Mjos, , , , , , , Problems/Solutions, Venting for TSGIG1 repair 


    
        
            Anders Mjos wrote:
        
        
            
            
            
    Reply  Thursday, May 10, 2012, 09:48, Anders Mjos, , , , , , , Problems/Solutions, Ion Gauge filament replaced 


    
        
            Anders Mjos wrote:
        
        
            
            
            
              
    Reply  Tuesday, May 15, 2012, 10:14, Anders Mjos, SiC#27, HP-SIS, ITE, TM4, , , In progress, target ready to be heated and biased 
 Tuesday, May 15, 2012, 10:13: Turbo pumps at speed. Vacuum at 1.4E-5.
Tuesday, May 15, 2012, 12:03: Cooling lines opened. Vacuum stable at 1.6E-6
Tuesday, May 15, 2012, 12:17: Target ready to be heated and biased.
Entry  Wednesday, May 16, 2012, 16:01, Anders Mjos, , , , , , , Problems/Solutions, Loose chip of insulator material detected Ceramic_Chip.pdf
 A chip of insulator material was detected below the lower target insulator stand-off (attachment - left picture). The chip may come from the tube
heater insulator above (attachment - right picture). The chip will be further investigated when the target is removed.
    Reply  Thursday, May 17, 2012, 08:36, Anders Mjos, SiC#27, HP-SIS, ITE, TM4, , , Done, Target removed 
Thursday, May 17, 2012, 08:36: Turbo pumps switched off in preparation of target removal.
Thursday, May 17, 2012, 08:51: Purging cooling lines.
Thursday, May 17, 2012, 08:55: Venting.
    Reply  Thursday, May 17, 2012, 12:19, Anders Mjos, SiC#27, HP-SIS, ITE, TM4, , , Problems/Solutions, Loose chip of insulator material detected Chipped_insulator_stand-off.pdf


    
        
            Anders Mjos wrote:
        
        
            
             A chip of insulator material was detected below the lower target insulator stand-off (attachment
Entry  Thursday, May 17, 2012, 15:14, Anders Mjos, , , , , , , , Pumping down empty chamber 
Thursday, May 17, 2012, 15:14: Started roughing. Cooling lines blanked off.
Thursday, May 17, 2012, 16:52: Starting turbos.
Thursday, May 17, 2012, 17:00: Turbos at speed. Vacuum at 1.5E-5.
Entry  Thursday, May 31, 2012, 14:46, Anders Mjos, , , , , , , , Venting in preparation for Ta#38 
Thursday, May 31, 2012, 14:46: Switching off turbos
Thursday, May 31, 2012, 15:05: Venting
Entry  Thursday, May 31, 2012, 15:43, Anders Mjos, Ta#38, LP-SIS, ITW, TM1, , , In progress, Target ready to be heated 
Thursday, May 31, 2012, 15:42: Roughing
Thursday, May 31, 2012, 16:01 : Starting turbos
Thursday, May 31, 2012, 16:08 : Turbos at speed. Vacuum 1.7 E-5
    Reply  Monday, June 04, 2012, 10:51, Anders Mjos, Ta#38, LP-SIS, ITW, TM1, , , Done, Venting chamber 


    
        
            Aurelia Laxdal wrote:
        
        
            
            Did the HV conditioning.
Entry  Monday, June 04, 2012, 11:40, Anders Mjos, , , , , , , In progress, Empty chamber 
HS water lines blanked.
Monday, June 04, 2012, 11:40: Roughing.
Monday, June 04, 2012, 11:58: Starting turbos. 
    Reply  Tuesday, June 26, 2012, 16:06, Anders Mjos, , , , , , , Done, Vented 


    
        
            Anders Mjos wrote:
        
        
            
            HS water lines blanked.
Entry  Tuesday, June 26, 2012, 18:04, Anders Mjos, FEBIAD anode end cap test, , , , Tube only, 38307-9, In progress, FEBIAD anode end cap test - ready 
Testing FEBIAD anode end cap as per dwg ITD0304 REV C
Target with TUBE ONLY. Do not use target heater.

Tuesday, June 26, 2012, 18:03: Roughing
Entry  Tuesday, June 26, 2012, 18:30, Anders Mjos, , , , , , , Problems/Solutions, Crack in source tray insulator Cracked_insulator.pdf
 A crack in the insulator ITD0054 was observed while mounting the target assembly. See attachment.
    Reply  Wednesday, July 04, 2012, 13:07, Anders Mjos, , , , , , , Problems/Solutions, water lines purged 


    
        
            Friedhelm Ames wrote:
        
        
            
            turbo pumps stopped to prepare for venting for anode short investigation.
    Reply  Wednesday, July 04, 2012, 15:33, Anders Mjos, , , , , , , Problems/Solutions, short in anode photo_1.JPGphoto_3.JPG


    
        
            Friedhelm Ames wrote:
        
        
            
            A short in the anode has developed during the heater ramp up. Increasing the current limit did not cure it. Start heater