ID |
Date |
Author |
Target/No.# |
Source |
Station |
Module |
Target Oven W.O# |
Heat Shield W.O# |
Status |
Subject |
Text |
|
181
|
Thursday, August 23, 2012, 11:59 |
Anders Mjos | | | | | | | Problems/Solutions | Roughing blows the fuse for both roughing pumps. | The fuse for both roughing pumps blows
when roughing the chamber. With the help
from Edi: disconnect the exhaust port on |
|
184
|
Monday, August 27, 2012, 15:21 |
Aurelia Laxdal | | | | | | | In progress | Xantrex PS 10-600 for TSH:TGHT is not working | When turned ON it was not going higher
than 3.6A (EPICS/front panel). Kazuya checked
the connections at the back and also the |
|
189
|
Friday, August 31, 2012, 10:19 |
Anders Mjos | | | | | | | Problems/Solutions | Replaced TMSRP2 (again) |
|
|
194
|
Thursday, September 06, 2012, 09:23 |
Friedhelm Ames | NB#7 | | | | | | | | start high voltage and heaters |
|
195
|
Friday, September 07, 2012, 12:11 |
Friedhelm Ames | NB#7 | LP-SIS | | | | | In progress | mass scan started | mass scan has been started after optimization
on 23Na |
|
196
|
Friday, September 07, 2012, 13:10 |
Friedhelm Ames | Nb#7 | | | | | | Done | mass scan finished | mass scan is finished saved as
Normal
0
|
|
198
|
Tuesday, September 11, 2012, 13:13 |
Friedhelm Ames | Nb#7 | LP-SIS | | | | | In progress | start cool down | start cooldown. Found computer at teststand
off. Somebody tried to login with username
ARIEL. |
|
199
|
Tuesday, September 11, 2012, 19:48 |
Friedhelm Ames | NB#7 | HP-SIS | | | | | Done | cool down finished, all source power supplies off. | |
|
203
|
Thursday, September 13, 2012, 13:05 |
Friedhelm Ames | Nb#7 | LP-SIS | | | | | | heater ramping up started | |
|
205
|
Friday, September 14, 2012, 16:33 |
Anders Mjos | | | | | | | In progress | Pumping down empty chamber | Friday, September 14, 2012, 16:33: Roughing
Friday, September 14, 2012, 16:57:
Starting turbos |
|
206
|
Thursday, September 20, 2012, 14:24 |
Anders Mjos | | | | | | | In progress | Venting - installation of FEBIAD test target for operator training | Thursday, September 20, 2012, 14:24: Turbos
off
Thursday, September 20, 2012, 15:20: |
|
207
|
Thursday, September 20, 2012, 15:52 |
Anders Mjos | TEST SiC | HP-FEBIAD | | | | | In progress | Installilng SiC-HP-FEBIAD target for operator training | Thursday, September 20, 2012, 15:50: Roughing
Thursday, September 20, 2012, 15:54:
Aborting. VCR for gas line not connected. |
|
208
|
Friday, September 21, 2012, 08:20 |
Anders Mjos | TEST SiC | HP-FEBIAD | | | | | In progress | Installilng SiC-HP-FEBIAD target for operator training |
|
|
209
|
Friday, September 21, 2012, 08:27 |
Anders Mjos | | | | | | | Problems/Solutions | Backing pressure TSG:CG1A/B fluctuating | Backing pressures TSG:CG1A/B are fluctuating
between 0.02 and 0.05 since Sept 17th at
~17h. Expected values <0.01. |
|
210
|
Monday, September 24, 2012, 10:31 |
Anders Mjos | | | | | | | Problems/Solutions | EPICS whiteout | Test stand was off this morning and
EPICS controls in "white-out".
Controls is looking into it. |
|
211
|
Monday, September 24, 2012, 13:52 |
Anders Mjos | | | | | | | Problems/Solutions | TSG:RP1 will not start without blowing the fuse | See e-fault 6329
Tried to start the pump from another
power outlet with Edi. No luck. Pump will |
|
212
|
Monday, September 24, 2012, 15:25 |
Anders Mjos | | | | | | | Done | TMS RP and TP started | |
|
213
|
Tuesday, September 25, 2012, 13:05 |
Anders Mjos | | | | | | | Problems/Solutions | TSG:RP1 will not start without blowing the fuse |
|
|
214
|
Tuesday, September 25, 2012, 13:25 |
Anders Mjos | | | | | | | Done | Started turbos after replaced roughing pump | |
|
215
|
Tuesday, September 25, 2012, 16:10 |
Aurelia Laxdal | | | | | | | | Conditioning - SiC-HP-FEBIAD for operator training | Did the HV conditioning up to 30kV.
Started the heaters conditioning:
for TSH:TGHT up to 580A |
|