11
|
Friday, September 23, 2011, 16:42 |
Anders Mjos | SiC#26 | HP-FEBIAD | ITE | TM4 | 38295-9 | 38307-8 | In progress | Target ready to be heated | Friday, September 23, 2011, 16:4: Target installed and roughing started.
Friday, September 23, 2011, 17:12: Started turbo pumps.
Monday, September 26, 2011, 09:00: Opened up water flow. Vacuum rose from 3e-6 to 3e-5 torr in 30 s. Closed water flow.
Monday, September 26, 2011, 09:00: Venting for leak check.
Monday, September 26, 2011, 10:20: Pressurized water lines with 120 PSI He. Leak detected on right water line connection to heat shield.
Monday, September 26, 2011, 12:00: Leak repaired. Pumping down. Kapton added on target heater cooling line to prevent short with cooling line for FEBIAD coil.
Monday, September 26, 2011, 12:47: Started turbo pumps.
Monday, September 26, 2011, 15:45: Opened up water flow. Vacuum stable at 3.5e-6 torr.Target ready to be heated. |
15
|
Wednesday, September 28, 2011, 16:33 |
Aurelia Laxdal | SiC#26 | HP-FEBIAD | ITE | TM4 | 38295-9 | 38307-8 | In progress | HV conditioning | Started the HV conditioning: TSG:BIAS=30kV |
16
|
Thursday, September 29, 2011, 09:27 |
Aurelia Laxdal | SiC#26 | HP-FEBIAD | ITE | TM4 | 38295-9 | 38307-8 | In progress | Heaters conditioning | Started the heaters conditioning: TGHT up to 580A and TBHT up to 230A. |
35
|
Monday, February 27, 2012, 17:39 |
Friedhelm Ames | | | | | | | In progress | target and tube heaters ramped up | ramping up target to 300 A and tube to 270 A |
36
|
Tuesday, February 28, 2012, 10:29 |
Pierre Bricault | | LP-FEBIAD | | | | | In progress | Test FEBIAD at ISAC test statnd | |
66
|
Friday, March 09, 2012, 08:53 |
Friedhelm Ames | Nb#6 | | | | | | In progress | mass scan started | mass scan started again. Total current 3.2e-8 A |
72
|
Monday, April 16, 2012, 11:16 |
Anders Mjos | Nb#6 | LP-SIS | ITW | TM1 | | | In progress | Venting, purging cooling lines | Venting chamber and purging cooling lines in preparation for target removal |
73
|
Monday, April 16, 2012, 11:56 |
Anders Mjos | Nb#6 | LP-SIS | ITW | TM1 | | | In progress | Venting, purging cooling lines |
Anders Mjos wrote: |
Venting chamber and purging cooling lines in preparation for target removal
|
Monday, April 16, 2012, 11:55: Target removed. Cooling lines must be blanked off before pumping down. |
76
|
Wednesday, April 18, 2012, 13:10 |
Anders Mjos | No target | | | | | | In progress | Pumping down empty vacuum chamber | Wednesday, April 18, 2012, 13:10: Roughing the vacuum chamber.
Wednesday, April 18, 2012, 13:34 : Turbo pumps started and at speed. Pressure 3.5 E-5 torr |
85
|
Tuesday, May 15, 2012, 07:39 |
Rick Maharaj | Sic #27 | HP-SIS | ITE | TM4 | | | In progress | Water on at test stand | The vacuum on TSGIG1 reads 2.85e-07. Turing on water on teststand and observing any changes in vacuum pressure. |
91
|
Tuesday, May 15, 2012, 10:14 |
Anders Mjos | SiC#27 | HP-SIS | ITE | TM4 | | | In progress | target ready to be heated and biased | Tuesday, May 15, 2012, 10:13: Turbo pumps at speed. Vacuum at 1.4E-5.
Tuesday, May 15, 2012, 12:03: Cooling lines opened. Vacuum stable at 1.6E-6
Tuesday, May 15, 2012, 12:17: Target ready to be heated and biased. |
92
|
Tuesday, May 15, 2012, 16:18 |
Aurelia Laxdal | SiC#27 | HP-SIS | ITE | TM4 | | | In progress | Target/Ion source conditioning | Did the HV conditioning up to 30kV and started to ramp up the heaters to 580A and 230A. |
101
|
Thursday, May 31, 2012, 15:43 |
Anders Mjos | Ta#38 | LP-SIS | ITW | TM1 | | | In progress | Target ready to be heated | Thursday, May 31, 2012, 15:42: Roughing
Thursday, May 31, 2012, 16:01 : Starting turbos
Thursday, May 31, 2012, 16:08 : Turbos at speed. Vacuum 1.7 E-5
Friday, June 01, 2012, 08:08: Cooling water opened. Vacuum stable at 5.7E-7. Target ready to be heated and biased. |
102
|
Friday, June 01, 2012, 12:23 |
Aurelia Laxdal | Ta#38 | LP-SIS | ITW | TM1 | | | In progress | HV & Heaters conditioning. | Did the HV conditioning.
Heaters conditioning in progress.
The Hall probe is not working: couldn't pass 35.5 units (readback) or 50.16 units (setpoint) at field -3710G.
Tried to turn ON/OFF magnet PS and to reboot Canbus, but nothing worked. Still waiting for E-Fault 6031 to be resolved.
Started cool-down. |
104
|
Monday, June 04, 2012, 11:40 |
Anders Mjos | | | | | | | In progress | Empty chamber | HS water lines blanked.
Monday, June 04, 2012, 11:40: Roughing.
Monday, June 04, 2012, 11:58: Starting turbos.
Monday, June 04, 2012, 12:06 : Turbos at speed. Vacuum 1.5 E-5 |
106
|
Tuesday, June 26, 2012, 18:04 |
Anders Mjos | FEBIAD anode end cap test | | | | Tube only | 38307-9 | In progress | FEBIAD anode end cap test - ready | Testing FEBIAD anode end cap as per dwg ITD0304 REV C
Target with TUBE ONLY. Do not use target heater.
Tuesday, June 26, 2012, 18:03: Roughing
Tuesday, June 26, 2012, 18:24: Turbos started
Tuesday, June 26, 2012, 18:31 : Turbos at speed. Vacuum at 1.8E-5
Wednesday, June 27, 2012, 08:48: Cooling opened. Vacuum stable at 4.2E-7. Ready for testing.
|
108
|
Thursday, June 28, 2012, 11:04 |
Pierre Bricault | Test FEBIAD | LP-FEBIAD | | | | | In progress | Ready to bias the high voltage. | |
110
|
Thursday, June 28, 2012, 11:19 |
Pierre Bricault | | LP-FEBIAD | | | | | In progress | Cathode ramping to 230 A in progress | |
111
|
Thursday, June 28, 2012, 11:27 |
Pierre Bricault | | LP-FEBIAD | | | | | In progress | Cathode heating in progress, pressure 8.3e-7 T | |
112
|
Thursday, June 28, 2012, 11:29 |
Pierre Bricault | | LP-FEBIAD | | | | | In progress | Lost all cnntrol interface, complete whiteout of the epics system. | |
|