Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand, Page 15 of 53  Not logged in ELOG logo
  ID Date Author Target/No.# Source Stationdown Module Target Oven W.O# Heat Shield W.O# Status Subject
  135   Friday, July 06, 2012, 15:36 Friedhelm Ames      Doneswitched everything off

switched everything off to prepare for scheduled power outage on Monday

  136   Monday, July 09, 2012, 11:14 Aurelia Laxdal       Test Stand status

Restarted the PC at the Test Stand.

Restarted the Archivers; currently pumping down the separator area.

  137   Monday, July 09, 2012, 12:57 Anders Mjos      DoneVented
  138   Tuesday, July 10, 2012, 16:01 Anders Mjos      Problems/SolutionsTurbo replaced - cleaning chamber recommended

A new turbo has been installed. Eddie said the other one had crashed but not catastrophically. He recommends the test stand be wiped clean before pumping because there is a fine layer of Aluminum dust on the chamber base.

 

  139   Wednesday, July 11, 2012, 11:16 Anders Mjos      In progressPumping down - with new turbo pump
  140   Wednesday, July 11, 2012, 15:30 Anders Mjos      Problems/SolutionsRestarting turbos after power bump

Wednesday, July 11, 2012, 15:27: Started TSGTP1A and 1B

Wednesday, July 11, 2012, 15:31: Started TSMTP2 and 6

Wednesday, July 11, 2012, 15:33: TMS tubos at speed. Vacuum 4.8E-7

Wednesday, July 11, 2012, 15:34: TSG turbos at speed. Vacuum 9.5E-6

  141   Thursday, July 12, 2012, 09:05 Anders Mjos      Problems/SolutionsShut down TSGTP1A - bearing noise

Shut down TSGTP1A due to noise (possibly from bearings) after consulting Edi.

  142   Thursday, July 12, 2012, 09:44 Anders Mjos      In progressVenting

System will be vented and gas lines purged with air, then nitrogen.

Thursday, July 12, 2012, 09:43: Shut down TSGTP1B.

  143   Thursday, July 12, 2012, 12:23 Anders Mjos      DoneTSH:SV5 bypass on

Thursday, July 12, 2012, 15:48: bypass removed

  144   Thursday, July 12, 2012, 13:41 Anders Mjos      Donepurging gas lines with air
  • gas lines purged with air for 60 min (through TSHUHV1 and TSHSV4).
  • gas line allowed to fill with nitrogen to 300 torr and evacuated. repeated 3 times.
  145   Thursday, July 12, 2012, 13:49 Anders Mjos      Problems/SolutionsAluminum oxide found inside TSHSV1

Aluminum oxide found inside TSHSV1 and the copper line to TSHUHV1.

SV1 replaced and copper line cleaned.

  146   Thursday, July 12, 2012, 15:49 Anders Mjos       test stand vented for TP1A replacement

see e-fault 6142

  147   Monday, July 16, 2012, 15:46 Anders Mjos      In progressPumping down

Monday, July 16, 2012, 15:11: Roughing.

Monday, July 16, 2012, 15:38: Turbos started.

Monday, July 16, 2012, 15:46: TSGTP1B at speed TSGTP1A timeout.

Monday, July 16, 2012, 15:54: Both turbos at speed. Vacuum 3.6E-5.

 

  148   Tuesday, July 17, 2012, 10:10 Anders Mjos      Problems/SolutionsGas lines leak checked - air supply leak on manifold

Leak found on the Ne supply line. 1E-4 - 1E-5 range. Replaced fittings. Had to use one brass piece. Leak rate 6E-9 (probably due to Ne response). No response to He.

Leak rate around low E-8 with regulation valve open.

When closing the HV rack, an air supply leak developed on the manifold for the valves. Shut off air supply. Valves still operational, but requires opening up air supply to actuate.

 

  149   Wednesday, July 18, 2012, 14:08 Anders Mjos      Problems/SolutionsAir supply leak on manifold fixed

Anders Mjos wrote:

Leak found on the Ne supply line. 1E-4 - 1E-5 range. Replaced fittings. Had to use one brass piece. Leak rate 6E-9 (probably due to Ne response). No response to He.

Leak rate around low E-8 with regulation valve open.

When closing the HV rack, an air supply leak developed on the manifold for the valves. Shut off air supply. Valves still operational, but requires opening up air supply to actuate.

 

 With the help of Rick, the leak was fixed.

The vacuum pump for the gas lines was removed for repairing the leaking hose.

  150   Thursday, July 19, 2012, 08:42 Anders Mjos      Problems/SolutionsLeak checking source chamber - leak found on front door

Due to high vacuum a leak check will be done on the system.

Thursday, July 19, 2012, 09:00 : Base leak rate 4E-9 atm-cc/sec

Thursday, July 19, 2012, 09:07: Leak detected on side door. Mid 1E-8 range.

Thursday, July 19, 2012, 09:08: Leak detected on front door. Mid 1E-6 range. Main leak left or bottom side.

Thursday, July 19, 2012, 09:20: Leak on side door could not be reproduced. Previous response possibly due to  "cross-talk" with front door.

  151   Thursday, July 19, 2012, 09:35 Anders Mjos      DoneVenting to investigate leak on front door

Thursday, July 19, 2012, 09:35: Switched off both turbos.

Thursday, July 19, 2012, 10:23: Venting

 

  152   Thursday, July 19, 2012, 11:31 Anders Mjos      Problems/SolutionsWiped o-rings and sealing faces

Anders Mjos wrote:

Due to high vacuum a leak check will be done on the system.

Thursday, July 19, 2012, 09:00 : Base leak rate 4E-9 atm-cc/sec

Thursday, July 19, 2012, 09:07: Leak detected on side door. Mid 1E-8 range.

Thursday, July 19, 2012, 09:08: Leak detected on front door. Mid 1E-6 range. Main leak left or bottom side.

Thursday, July 19, 2012, 09:20: Leak on side door could not be reproduced. Previous response possibly due to  "cross-talk" with front door.

 Thursday, July 19, 2012, 11:29: Wiped both o-rings, grooves and sealing faces with kimwipes. Removed black and brown residues.

  153   Thursday, July 19, 2012, 11:32 Anders Mjos      DonePumping down

Thursday, July 19, 2012, 11:29: roughing

Thursday, July 19, 2012, 11:49: starting turbos

Thursday, July 19, 2012, 11:54: TP1B at speed

Thursday, July 19, 2012, 11:58: TP1A timed out

Thursday, July 19, 2012, 11:58 TP1A restarted. at speed.

Thursday, July 19, 2012, 11:59: both turbos at speed. Vacuum. 2E-5

 

 

 

  154   Thursday, July 19, 2012, 12:59 Anders Mjos      Problems/SolutionsLeak checking doors - no response

Thursday, July 19, 2012, 12:57: Doors leak checked. No response. Base rate 1.6E-8 atm-cc/sec. TP pressuer 0.0E-4 Torr . TSGIG1 4.2E-6 Torr. TSG:CG1A 0.014 Torr.

ELOG V2.9.2-2455