Thursday, March 08, 2012, 09:14, Friedhelm Ames, Nb#6, , , , , , , continue target heating
|
continue target heating up to 580 A. Strip tool for the heating up to 300A from yesyerday see below |
Thursday, March 08, 2012, 14:08, Friedhelm Ames, Nb#6, , , , , , , heater ramped up
|
heaters have reached final values TGHT 580 A, TBHT 230 A, some sparking during ramp up. see strip tool image attached |
Thursday, March 08, 2012, 17:16, Friedhelm Ames, Nb#6, , , , , , , mass scan started
|
|
Thursday, March 08, 2012, 17:39, Friedhelm Ames, , , , , , , Problems/Solutions, TPS:Q2 amd TMS:MB1 failed
|
TPS:Q2 and TMS:MB1 failed during the scan. -> restarted. |
Thursday, March 08, 2012, 18:32, Friedhelm Ames, , , , , , , , mass scan crashed due to a network error
|
mass scan crashed due to a network error will be restarted tomorrow |
Friday, March 09, 2012, 08:53, Friedhelm Ames, Nb#6, , , , , , In progress, mass scan started
|
mass scan started again. Total current 3.2e-8 A |
Friday, March 09, 2012, 10:56, Friedhelm Ames, Nb#6, , , , , , , scan finished
|
mass scan is finished and saved see attached. |
Friday, March 09, 2012, 13:30, Friedhelm Ames, NB#6, , , , , , , heater ramping down
|
Fc0 23 nA
IG1 9.9e-7 T
start automatic heater ramping down |
Friday, March 09, 2012, 17:25, Friedhelm Ames, , , , , , , , heaters and HV power supplies off
|
heaters and HV power supplies have been switched off
IG1 5.1e-9 T. |
Wednesday, April 11, 2012, 09:30, Friedhelm Ames, , , , , , , Failed, TSGRP1 poor vacuum
|
The backing pressure at TSGRP1 does not go below 578 mT. Fault report to vacuum. |
Wednesday, April 11, 2012, 09:34, Friedhelm Ames, , , , , , , , turbopumps in mass separator section started
|
turbopumps in mass separator section started after power outages |
Wednesday, April 18, 2012, 12:19, Anders Mjos, , , , , , , Problems/Solutions, Noise from roughing pump TSGRP1
|
Wednesday, April 18, 2012, 12:15: Blanked off cooling lines. Chamber ready to be pumped down.
Wednesday, April 18, 2012, 12:16: TSGRP1 makes unusual noise when attempting to pump down vacuum chamber. Roughing aborted for now. Edi Dalla Valle
is informed. He will have a look at it after lunch. |
Wednesday, April 18, 2012, 13:09, Anders Mjos, , , , , , , Problems/Solutions, Noise from roughing pump TSGRP1
|
Wednesday, April 18, 2012, 13:08 Anders Mjos wrote:
Wednesday, April 18, 2012, 12:15: Blanked off cooling lines. Chamber ready to be |
Wednesday, April 18, 2012, 13:10, Anders Mjos, No target, , , , , , In progress, Pumping down empty vacuum chamber
|
Wednesday, April 18, 2012, 13:10: Roughing the vacuum chamber.
Wednesday, April 18, 2012, 13:34 : Turbo pumps started and at speed. Pressure 3.5 E-5 torr |
Thursday, April 26, 2012, 09:14, Anders Mjos, , , , , , , , removed Al(CH3)3
|
Friedhelm Ames wrote:
connected A(CH3)3 instead of He, pumped line and valve with pump on the high voltage rack.. Opened regulating |
Wednesday, May 09, 2012, 08:56, Anders Mjos, , , , , , , Problems/Solutions, TSGIG1 not working
|
TSGIG1 has timed out. As seen on the attached screen shot, the IG has been out since 17h May 1st. |
Wednesday, May 09, 2012, 09:16, Anders Mjos, , , , , , , Problems/Solutions, TSGIG1 not working
|
Anders Mjos wrote:
TSGIG1 has timed out. As seen on the attached screen shot, the IG has been out since 17h May 1st. |
Thursday, May 10, 2012, 08:13, Anders Mjos, , , , , , , Problems/Solutions, Venting for TSGIG1 repair
|
Anders Mjos wrote:
|
Thursday, May 10, 2012, 09:48, Anders Mjos, , , , , , , Problems/Solutions, Ion Gauge filament replaced
|
Anders Mjos wrote:
|
Monday, May 14, 2012, 15:36, Aurelia Laxdal, , , , , , , , Test Stand - IOC reboot
|
Did a local IOC reboot to cure to white-out. The test stand is now operational. |
|