Wednesday, April 28, 2021, 22:30
First P2N heating test ongoing.
At P2NHT ~ 570 A and TBHT ~ 100 A shine is already seen, which suggests that current is flowing in the P2N target properly, see picture attached.
Most of the ramping is carefully monitored because the good vacuum signal from the TTS ramping procedure is obviously not working (bypassed), and if the pressure goes past 1E-5T the whole ITS should interlock and abruptly drop the currents, which we want to avoid.
Wednesday, April 28, 2021, 23:16
P2NHT set current = 810 A
P2NHT read current = 800 A
Master and slave have balanced fully, TBHT ramping still proceeds manually. I'm trying to get it to ~200A before leaving.
Thursday, April 29, 2021, 00:54
Ramping successfully achieved.
P2NHT_Master = 594 A - 4.59 V
P2NHT_Slave = 611 A - 4.89 V
P2NHT = 1207 A
TBHT = 231 A - 2.29 V
Max temperature of welding cables = 40 deg
Zero current from the HV ground terminal (feedthrough I) to slave negative (feedthrough H) |