Test piece installed with Sam, Aaron and Alexander. Ended up shimming the support stand (middle foot) since it seemed to be bowing a bit and distorting the gap between the containment box stand-in piece and the service tray piece. We should measure the gaps when testing is done with the same configuration. Installation was not too hard, installed the whole thing as one piece. Had to remove the middle foot on the long side to get it through the door but otherwise no problems.
Test stand re-wired for HV testing. Wire hooked up to test piece by pinching between two tubes. Verified GND and HV continuity. |